Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/17/2016 - P36

Finance Committee - Agenda - 8/17/2016 - P36

By dnadmin on Mon, 11/07/2022 - 09:50
Document Date
Wed, 08/17/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2016 - 00:00
Page Number
36
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

§ 3.1.4 The Architect shall submit information to the Construction Manager and participate in developing and
revising the Project schedule as it relates to the Architect’s services. The Architect shall review and approve, or take
other appropriate action upon, the portion of the Project schedule relating to the performance of the Architect’s
services.

§ 3.1.5 Once the Owner, Construction Manager, and Architect agree to the time limits established by the Project
schedule, the Owner and Architect shall not exceed them, except for reasonable cause.

§ 3.1.6 The Architect shall not be responsible for an Owner’s directive or substitution, or fot the Owner’s acceptance
of non-conforming work, made without the Architect’s approval. i — . ved
anbger

pnemenntmcusaenienotranntentwccenmatntcems steal
§ 3.4.7 The Architect shall, at appropriate times, in coordination with the Construction M. contact the

governmental authorities required to approve the Construction Documents and the entities providing utility services

to the Project. In designing the Project, the Architect shall respond to applicable design “ee ements imposed by

such governmental authorities and by such entities providing utility services.

§ 3.1.8 The Architect shall assist the Owner and Construction Manager in connection with the Qwner’s re§poijsibility
for filing documents required for the approval of governmental authorities having jurisdiction dver the Project.

§ 3.2.4 Prior to the Owner’s acceptance of the Guaranteed Maximum Price proposal or Control Pa
applicable, the Architect shall consider the Construction Manager’s requests for substitutions ai op
request of the Construction Manager, provide clarification or interpretations pertaining to the Drawings 4
Specifications, and other documents submitted by the Architect. The Architect and Construction Manager shall
include the Owner on all communications related to substitution requests, clarifications, and interpretations. ont
aon"
§ 3.2.2 During one of the design phases, the Owner will receive a Guaranteed Maximum Price proposal or 6ntrol Pe
Estimate, as appropriate, from the Construction Manager. The Architect shall assist the Owner i owing. |
|
hy

§ 3.2 Evaluation of the Construction Manager’s Guaranteed Maximum Price Proposal or Control Eftimate
Estimate. i
" tte

|g

—

Construction Manager’s proposal or estimate. The Architect’s review is not for the purpos ot discoye errors,
omissions, or inconsistencies; for the assumption of any responsibility for the Construction anitiger’ s “retin
means, methods, sequences, techniques, or procedures; or for the verification of any estimat es-af cost d orestimated
cost proposals. In the event that the Architect discovers any inconsistencies or inaccuracies in the inbrmation
presented, the Architect shall promptly notify the Owner and Construction Manager.

}
§ 3.2.3 Upon authorization by the Owner, and subject to Section 4.3.1.15, the Architect shall update the Drawings, S
Specifications, and other documents to incorporate the agreed upon assumptions and clarificatio roomates in the “ :

Guaranteed Maximum Price Amendment or Control Estimate. VV
§ 3.3 Schematic Design Phase Services a

§ 3.3.1 The Architect shall review the program and other information furnished by the Ownér ahd Construbtio A
(
i

Manager, and shall review laws, codes, and regulations applicable to the Architect’s servicés. + i
i §
§ 3.3.2 The Architect shall prepare a preliminary evaluation of the Owner’s program, schedule, budget forithe t POSt
of the Work, Project site, and other Initial Information, each in terms of the other, to ascertain the requirements of |
the Project. The Architect shall notify the Owner of (1) any inconsistencies discovered in the-information;and-(Q———
other information or consulting services that may be reasonably needed for the Project.
At TET IT tag
§ 3.3.3 The Architect shall present its preliminary evaluation to the Owner and Construction Manager and shall o™
discuss with the Owner and Construction Manager alternative approaches to design and constfucti tiger ot the Projeti. ON .
including the feasibility of incorporating sustainable design approaches, and consideration af the“implementation of “\ m4
the Owner’s sustainable objective, ifany. The Architect shall reach an understanding with the Gwner regarding the
requirements of the Project. -
J
call

eines

§ 3.3.4 Based on the Project requirements agreed upon with the Owner, the Architect shall prepare and present to the
Owner and Construction Manager, for the Owner’s approval, a preliminary design illustrating thé Stale and
relationship of the Project components. nen

fancsettanenriie

AIA Document B133™ - 2014. Copyright © 2014 by The American Institute of Architects. All rights reserved. WARNING: This AIA’ Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this ATA® Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.’
This draft was produced by AIA software at 12:43:58 on 07/15/2016 under Order No.1575871642_1 which expires on 02/08/2017, and is not for
resale.

User Notes: (1146770772)