Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/17/2016 - P41

Finance Committee - Agenda - 8/17/2016 - P41

By dnadmin on Mon, 11/07/2022 - 09:50
Document Date
Wed, 08/17/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2016 - 00:00
Page Number
41
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

Services Responsibility Location of Service Description
(Architect, Owner | (Section 4.2 below or in an exhibit

or attached to this document and
Not id below

184.44 Assistance with selection ofthe sss] ATCIIGOINUES! | Pa eee | { Deleted: )
Construction

44.2 Programming sd COI | ee ee | . PM
a a { Deleted: (B202™-2009) }

414 Measured

4Ad facilities

§ 4.1.6 Site Evaluation and Planning (B2037™_

|1§44.7 Building Information Modeling
2013
44.8 Civil engi
419
§4410 Architectural Interior Design (B252™—

4441 Value
44.412 Detailed cost
§ 4.4.13 On-site project representation (B2077™—

41.44 | Conformed construction documents
441.45 Record
4148 _As-Constructed Record
44147 Post evaluation
4.4.18 Services 1QT™_
44149 Tenant-related services
44.20 | Coordination of Owner’s consultants
44.21 Telecommunications/data

§ 44.22 Security Evaluation and Planning

4.4.23 ioni 1} TM_2,

44.24 Extensive sustainable services

4.1.25 Certification (B214™-~20 12

41.26 Historic Q5T™
§41.27 Furniture, Furnishings, and Equipment

weer -f Deleted: (B253™_2007) }

§ 4.2 Insert a description of each Additional Service designated in Section 4.1 as the

further described in an exhibit attached to this document.

§ 4.3 Additional Services may be provided after execution of this Agreement, without invalidating theAgreeméiity—~_
Except for services required due to the fault of the Architect, any Additional Services providedvin accordance-with ae
this Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment ats, \

the Architect’s schedule. \
§ 4.3.4 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner
with reasonable promptness and explain the facts and circumstances giving rise to the need{ The Architect shall not i
proceed to provide the following services until the Architect receives the Owner’s written dutherizationt ene

1 Services necessitated by a change in the Initial Information, previous instructions or i

recommendations given by the Construction Manager or the Owner, approvals givén by te Owner,
or a material change in the Project including, but not limited to, size, quality, complexity, the

AIA Document B133" - 2014. Copyright © 2014 by The American Institute of Architects. All rights reserved. WARNING: This ALA” Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction ox distribution of this AIA” Document, ox any

portion of it, may xasult in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law, 12
This draft was produced by ATA software at 12:43:58 on 07/15/2016 under Order No.1575071642_1 which expires on 02/06/2017, and is not for

resale.
User Notes: (1146770772)

Page Image
Finance Committee - Agenda - 8/17/2016 - P41

Footer menu

  • Contact