Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 22531 - 22540 of 38765

Finance Committee - Agenda - 3/6/2019 - P842

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
842
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

3.02

3.03

C.

pipeline at the joints. Where there is evidence of water or soil entering the pipeline, connecting
pipes, or structures, the defects shall be repaired to the satisfaction of the Engineer.

The Contractor shall build a tight bulkhead in the pipeline where new work enters an existing
sewer. This bulkhead shall remain in place until its removal is authorized by the Engineer.

Care shall be taken to prevent earth, water, and other materials from entering the pipe, and when
pipe laying operations are suspended, the Contractor shall maintain a suitable stopper in the end
of the pipe and also at openings for manholes.

As soon as possible after the pipe and manholes are completed on any street, the Contractor shall

flush out the new pipeline using a rubber ball ahead of the water, and none of the flushing water
or debris shall be permitted to enter any existing sewer.

A tracer tape shall be placed in the trench as specified in Section 02518, TRACER TAPE.

CLEANING:

On completion of a section of sewer, the Contractor shall TV inspect the main section in
accordance with Section 02441, Cleaning and Television (CCTV) Inspection of Pipelines at
no additional cost to the Owner.

TESTING

Testing of pipe joints to identify joints that are defective shall be performed using either liquid
or air, at the Contractor's option. Test pressure used shall be acceptable to the Engineer.

The allowable pressure drop shall be 0.5 pounds in 15 seconds at a pressure greater than % pounds
per vertical foot of pipe cover, or 4 pounds minimum.

Electronic video equipment shall be capable of displaying and recording, at a minimum, the
following data for each pipe joint:

1. Project Identification

2. Date recorded

3. Footage counter

4. Test pressure

5. Sewer reach identification (street location, start MH and second MH)

D. PIPE DEFLECTION MEASUREMENT:

1. In accordance with ASTM D3034, no less than 30 days after completion of the PVC sewer
pipe installation, the Contractor shall test the pipeline for deflection using a "go/no-go"
deflection mandrel having a minimum of nine evenly spaced arms or prongs. The
"go/no-go" gauge shall be hand pulled through all sections of the pipeline by the
Contractor. The Contractor shall submit drawings of the "go/no-go" gauge to the Engineer

2019 Sewer Replacement Project Polyvinyl Chloride Gravity Pipe and Fittings
Nashua, NH 02085-4

Page Image
Finance Committee - Agenda - 3/6/2019 - P842

Finance Committee - Agenda - 3/6/2019 - P843

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
843
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

for approval prior to testing. Complete dimensions of the gauge for each diameter of pipe
to be tested shall be in accordance with ASTM D3034.

2. Any section of pipe found to exceed 7.5 percent deflection shall be deemed a failed pipe
and shall be excavated and replaced by the Contractor at his own expense.

END OF SECTION

2019 Sewer Replacement Project Polyvinyl Chloride Gravity Pipe and Fittings
Nashua, NH 02085-5

Page Image
Finance Committee - Agenda - 3/6/2019 - P843

Finance Committee - Agenda - 3/6/2019 - P844

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
844
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02252

SUPPORT OF EXCAVATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. This section of the specification covers sheeting and bracing for support of

excavations. The requirements of this section shall also apply, as appropriate, to other
methods of excavation support and underpinning which the Contractor elects to use to
complete the work.

B. The Contractor shall furnish and place sheeting of the kinds and dimensions required,
complying with these specifications, where indicated on the drawings or ordered by the
Engineer.

1.02 RELATED WORK:
A. Section 02300, EARTHWORK.

1.03 QUALITY ASSURANCE:

A. _ This project is subject to the Safety and Health regulations of the U.S. Department of Labor
set forth in 29 CFR, Part 1926, and to New Hampshire law, RSA, Title XXIII: Labor.
Contractors shall be familiar with the requirements of these regulations.

B. The excavation support system shall be of sufficient strength and be provided with
adequate bracing to support all loads to which it will be subjected. The excavation support
system shall be designed to prevent any movement of earth that would diminish the width of
the excavation or damage or endanger adjacent structures.

PART 2 - PRODUCTS

2.01 MATERIALS:

A. Steel used for bracing shall be of such size and strength as required in the excavation
support design. Timber or steel used for bracing shall be new or undamaged used material
which does not contain splices, cutouts, patches, or other alterations which would impair its
structural integrity or strength.

2019 Sewer Replacement Project Support of Excavation
Nashua, NH 02252-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P844

Finance Committee - Agenda - 3/6/2019 - P845

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
845
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

PART 3 —EXECUTION

3.01 INSTALLATION:

A. Work shall not be started until all materials and equipment necessary for their construction are
either on the site of the work or satisfactorily available for immediate use as required.

B. _ The sheeting shall be securely and satisfactorily braced to withstand all pressures to which it
may be subjected and be sufficiently tight to minimize lowering of the groundwater level
outside the excavation.

C. __No sheeting may be left so as to create a possible hazard to safety of the public or a
hindrance to traffic of any kind.

D. Ifboulders or very dense soils are encountered, making it impractical to drive a section to the
desired depth, the section shall be cut off.

E. The sheeting shall be left in place where indicated on the drawings or ordered by the
Engineer in writing. At all other locations, the sheeting may be left in place or salvaged at
the option of the Engineer. Steel sheeting permanently left in place shall be cut off at a depth
of not less than two feet below finish grade unless otherwise directed.

F. All cut-off will become the property of the Contractor and shall be removed by him from the
site.

G. Sole responsibility for the satisfactory construction and maintenance of the excavation
support system, complete in place, shall rest with the Contractor. Any work done,
including incidental construction, which is not acceptable for the intended purpose shall
be either repaired or removed and reconstructed by the Contractor at his expense.

H. The Contractor shall be solely responsible for repairing all damage associated with
installation, performance, and removal of the excavation support system.

END OF SECTION
2019 Sewer Replacement Project Support of Excavation

Nashua, NH 02252-2

Page Image
Finance Committee - Agenda - 3/6/2019 - P845

Finance Committee - Agenda - 3/6/2019 - P846

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
846
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02300

EARTHWORK

PART 1 - GENERAL

1.01

1.02

mo Oo PP PS

7

1.03

WORK INCLUDED:

The Contractor shall make excavations of normal depth in earth for trenches and structures,
shall backfill and compact such excavations to the extent necessary, shall furnish the
necessary material and construct embankments and fills, and shall make miscellaneous
earth excavations and do miscellaneous grading.

RELATED WORK:

Section 01110, CONTROL OF WORK AND MATERIALS

Section 02085, POLYVINYL CHLORIDE GRAVITY PIPE AND FITTINGS
Section 02252, SUPPORT OF EXCAVATION

Section 02370 - EROSION CONTROL

Section 02518, TRACER TAPE

Section 02745, ROAD RESTORATION

REFERENCES:
American Society for Testing and Materials (ASTM)

ASTM C131 Test Method for Resistance to Degradation of Small Size Coarse
Aggregate by Abrasion and Impact in the Los Angeles Machine.

ASTM C136 ~— Method for Sieve Analysis of Fine and Coarse Aggregates.
ASTM C330 _— Specification for Lightweight Aggregate for
Structural Concrete.

ASTM = D1556_ Test Method for Density of Soil in Place by the Sand Cone
Method.

ASTM _D1557 Test Methods for Moisture-density Relations of Soils and Soil
Aggregate Mixtures Using Ten-pound (10 Lb.) Hammer and
Eighteen-inch (18") Drop.

ASTM = D2922 Test Methods for Density of Soil and Soil-aggregate in Place by
Nuclear Methods (Shallow Depth).

2019 Sewer Replacement Project Earthwork
Nashua, NH 02300-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P846

Finance Committee - Agenda - 7/6/2022 - P31

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
31
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
WORK HOURS TOTAL
ese Desen ETON PM Structural PE Sr PD wT HOURS
Segment 2 - Path & Riverbank Enhancements
2.1 - Substation Riverbank E&S Evaluation 8 24 32
4
ee ee ee ey ey ee ee ee ce ee ee ee ee ee ee ee ee ee ee ees ee ee ee eee ee eee ee ee ee ee
Fe oe as ee eR ee ee ane ee ne en ee ag a en sO meats E32 we
TOTAL HOURS 8 it) 24 0 0 32
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager {PM} 8 $ 150.00 $ 1,200.00
Structural Engineer (Structural) ) § 185.00 $ -
Project Engineer (PE) 24 § 130.00 S$ 3,120.00
Sr, Project Designer | (Sr PD} 0 $ 105,00 $ -
Technical Coordinator (TC) GQ § 100.00 $ -
| 32 | Total Fully Burdened Labor $ 4,320.00
Subconsultant $ -
Expenses i) 100.00
Estimated Direct Costs $ 100.00

P:\4920 VHB - Nashua River Walk\Organization\Proposals\Final Engineering Design Proposai 05-11-22\Final Engineering

Estimate 05-1 1-22,xlsx

TOTAL ESTIMATED COST= $ 4,420.00

1of2

Page Image
Finance Committee - Agenda - 7/6/2022 - P31

Finance Committee - Agenda - 3/6/2019 - P847

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
847
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

1.04

1.05

1.06

1.07

SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:

Material test results performed by a certified laboratory shall be submitted to the
Engineer for all materials proposed for use on the project. If required by the Engineer,
samples shall be submitted for independent testing.

PROTECTION OF EXISTING PROPERTY:

The work shall be executed in such manner as to prevent any damage to facilities at the site
and adjacent property and existing improvements, such as but not limited to streets, curbs,
paving, service utility lines, structures, monuments, bench marks, observation wells,
and other public or private property. Protect existing improvements from damage
caused by settlement, lateral movements, undermining, washout and other hazards
created by earthwork operations.

In case of any damage or injury caused in the performance of the work, the Contractor
shall, at its own expense, make good such damage or injury to the satisfaction of, and
without cost to, the Owner. Existing roads, sidewalks, and curbs damaged during the
project work shall be repaired or replaced to at least the condition that existed at the start
of operations. The Contractor shall replace, at his own cost, existing benchmarks,
observation wells, monuments, and other reference points which are disturbed or
destroyed.

Buried drainage structures and pipes, observation wells and piezometers, including those
which project less than eighteen inches (18") above grade, which are subject to damage
from construction equipment shall be clearly marked to indicate the hazard. Markers shall
indicate limits of danger areas, by means which will be clearly visible to operators of trucks
and other construction equipment, and shall be maintained at all times until completion
of project.

DRAINAGE:

The Contractor shall provide, at its own expense, adequate drainage facilities to complete

all work items in an acceptable manner. Drainage shall be done in a manner so that runoff
will not adversely affect construction procedures or cause excessive disturbance of
underlying natural ground or abutting properties.

FROST PROTECTION AND SNOW REMOVAL:

The Contractor shall, at its own expense, keep earthwork operations clear and free of
accumulations of snow as required to carry out the work.

The Contractor shall protect the sub-grade beneath new structures and pipes from frost
penetration when freezing temperatures are expected.

2019 Sewer Replacement Project Earthwork
Nashua, NH 02300-2

Page Image
Finance Committee - Agenda - 3/6/2019 - P847

Finance Committee - Agenda - 3/6/2019 - P848

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
848
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

PART 2 - PRODUCTS

2.01 MATERIAL:

A.

C.

CRUSHED GRAVEL:
The Gravel Road Base will be NHDOT - Item 304.3 Crushed Gravel, or Item
304.4 Crushed Stone (Fine Gradation).

TRENCH BACKFILL MATERIALS:

Trench backfill shall be material excavated from the trench that is granular, well
graded friable soil; free of pavement, rubbish, ice, snow, tree stumps, roots, clay
and organic matter; with 30 percent or less passing the No. 200 sieve; no stone
greater than two-third (2/3) loose lift thickness, or six inches, whichever is
smaller.

SEWER AND DRAIN PIPE BEDDING MATERIAL

1. Sewer and drain pipe bedding material shall be Crushed Stone meeting the ASTM
C33/C33M stone size No. 67..

2. Sand Blanket material for sewer and drain pipe shall be graded sand free from
organic materials, graded such that 100 percent passes a %-inch sieve and a
maximum of 15 percent passes a #200 sieve.

PART 3 — EXECUTION

3.01

A.

DISTURBANCE OF EXCAVATED AND FILLED AREAS
DURING CONSTRUCTION:

Contractor shall take the necessary steps to avoid disturbance of sub-grade during
excavation and filling operations, including restricting the use of certain types of
construction equipment and their movement over sensitive or unstable materials,
dewatering and other acceptable control measures.
All excavated or filled areas disturbed during construction, all loose or saturated soil,
and other areas that will not meet compaction requirements as specified herein shall
be removed and replaced with a minimum 12-inch layer of compacted crushed stone
wrapped all around in non-woven filter fabric. Costs of removal and replacement
shall be borne by the Contractor.

The Contractor shall place a minimum of 12-inch layer of special bedding materials
and crushed stone wrapped in filter fabric over the natural underlying soil to
stabilize areas which may become disturbed as a result of rain, surface water runoff
or groundwater seepage pressures, all at no additional cost to the Owner. The
Contractor also has the option of drying materials in-place and compacting to
specified densities

2019 Sewer Replacement Project Earthwork
Nashua, NH 02300-3

Page Image
Finance Committee - Agenda - 3/6/2019 - P848

Finance Committee - Agenda - 3/6/2019 - P849

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
849
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

3.02 EXCAVATION:

A. GENERAL:

1.

2.

The Contractor shall perform all work of any nature and description required
to accomplish the work as shown on the Drawings and as specified.
Excavations, unless otherwise required by the Engineer, shall be carried only
to the depths and limits shown on the Drawings. If unauthorized excavation is
carried out below required sub-grade and/or beyond minimum lateral limits
shown on Drawings, it shall be backfilled with gravel borrow and compacted
at the Contractor's expense as specified below, except as otherwise indicated.
Excavations shall be kept in dry and good conditions at all times, and all voids
shall be filled to the satisfaction of the Engineer.

In all excavation areas, the Contractor shall strip the surface topsoil layer and
underlying subsoil layer separate from underlying soils. In paved areas, the
Contractor shall first cut pavement as specified in paragraph 3.02 B.1 of this
specification, strip pavement and pavement sub-base separately from
underlying soils. All excavated materials shall be stockpiled separately from
each other within the limits of work.

The Contractor shall follow a construction procedure, which permits visual
identification of stable natural ground. Where groundwater is encountered, the
size of the open excavation shall be limited to that which can be handled by the
Contractor's chosen method of dewatering and which will allow visual
observation of the bottom and backfill in the dry.

The Contractor shall excavate unsuitable materials to stable natural ground
where encountered at proposed excavation sub-grade, as directed by the
Engineer. Unsuitable material includes topsoil, loam, peat, other organic
materials, snow, ice, and trash. Unless specified elsewhere or otherwise
directed by the Engineer, areas where unsuitable materials have been
excavated to stable ground shall be backfilled with compacted special bedding
materials or crushed stone wrapped all around in non-woven filter fabric.

B. TRENCHES:

1. Prior to excavation, trenches in pavement shall have the traveled way surface
cut in a straight line by a concrete saw or equivalent method, to the full depth
of pavement. Excavation shall only be between these cuts. Excavation support
shall be provided as required to avoid undermining of pavement. Cutting
operations shall not be done by ripping equipment.

2. Trenches shall be excavated to such depths as will permit the pipe to be laid at
the elevations, slopes, and depths of cover indicated on the Drawings. Trench
widths shall be as shown on the Drawings or as specified.

3. Where pipe is to be laid in bedding material, the trench may be excavated by
machinery to, or just below, the designated sub-grade provided that the
material remaining in the bottom of the trench is not disturbed.

4. If pipe is to be laid in embankments or other recently filled areas, the fill

2019 Sewer Replacement Project Earthwork
Nashua, NH 02300-4

Page Image
Finance Committee - Agenda - 3/6/2019 - P849

Finance Committee - Agenda - 3/6/2019 - P850

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
850
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

material shall first be placed to a height of at least 12-inches above the top of
the pipe before excavation.

Pipe trenches shall be made as narrow as practicable and shall not be widened
by scraping or loosening materials from the sides. Every effort shall be made
to keep the sides of the trenches firm and undisturbed until backfilling has
been completed.

If, in the opinion of the Engineer, the sub-grade, during trench excavation, has
been disturbed as a result of rain, surface water runoff or groundwater seepage
pressures, the Contractor shall remove such disturbed sub-grade to a minimum
of 12 inches and replace with crushed stone wrapped in filter fabric. Cost of
removal and replacement shall be borne by the Contractor.

C. BUILDING AND FOUNDATION EXCAVATION:

1.

2.

Excavations shall not be wider than required to set, brace, and remove forms
for concrete, or perform other necessary work.

After the excavation has been made, and before forms are set for footings, mats,
slabs, or other structures, and before reinforcing is placed, all loose or
disturbed material shall be removed from the sub-grade. The bearing surface
shall then be compacted to meet the requirements of this specification.

If, in the opinion of the Engineer, the existing material at sub-grade elevation is
unsuitable for structural support, the Contractor shall excavate and dispose of
the unsuitable material to the required width and depth as directed by the
Engineer. If, in the opinion of the Engineer, filter fabric is required; the
Contractor shall place filter fabric, approved by the Engineer, as per
manufacturer's recommendations. Crushed stone shall then be placed in lifts
and compacted to required densities. Backfill shall be placed to the bottom of
the proposed excavation.

D. EXCAVATION NEAR EXISTING STRUCTURES:

L.

Attention is directed to the fact that there are pipes, manholes, drains, and
other utilities in certain locations. An attempt has been made to locate all
utilities on the drawings, but the completeness or accuracy of the given
information is not guaranteed.

As the excavation approaches pipes, conduits, or other underground structures,
digging by machinery shall be discontinued and excavation shall be done by
means of hand tools, as required. Such manual excavation, when incidental to
normal excavation, shall be included in the work to be done under items
involving normal excavation.

Where determination of the exact location of a pipe or other underground
structure is necessary for properly performing the work, the Contractor shall
excavate test pits to determine the locations.

2019 Sewer Replacement Project Earthwork

Nashua, NH

02300-5

Page Image
Finance Committee - Agenda - 3/6/2019 - P850

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2250
  • Page 2251
  • Page 2252
  • Page 2253
  • Current page 2254
  • Page 2255
  • Page 2256
  • Page 2257
  • Page 2258
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact