Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 22281 - 22290 of 38765

Finance Committee - Agenda - 7/6/2022 - P8

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
8
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

General Terms and Conditions

DEFINITIONS Unless otherwise required by the context, “Professional Engineer’, and its
successors, transferees and assignees (together “Professional Engineer”) includes any of the
Professional Engineer's consultants, sub consultants, contractors, and subcontractors

PROFESSIONAL ENGINEER STATUS The parties agree that Professional Engineer shall have the
status of and shall perform all work under this contract as a Professional Engineer, maintaining
control over all its consultants, sub consultants, contractors, or subcontractors. The only contractual
relationship created by this contract is between the City of Nashua and Professional Engineer, and
nothing in this contract shall create any contractual relationship between the City of Nashua and
Professional Engineer's consultants, sub consultants, contractors, or subcontractors. The parties
also agree that Professional Engineer is not a City of Nashua employee and that there shall be no:

(1) Withholding of income taxes by the City of Nashua:

(2) Industrial insurance coverage provided by the City of Nashua;

(3) Participation in group insurance plans which may be available to employees of the
City of Nashua;

(4) Participation or contributions by either the Professional Engineer or the City of
Nashua to the public employee’s retirement system;

(5) Accumulation of vacation leave or sick leave provided by the City of Nashua;

(6) Unemployment compensation coverage provided by the City of Nashua.

STANDARD OF CARE Professional Engineer shall be responsible for the professional quality,
technical accuracy, timely completion, and coordination of all work performed under this contract.
Professional Engineer warrants that all work shall be performed with the degree of professional
skill, care, diligence, and sound practices and judgment that are normally exercised by recognized
professional firms with respect to services of a similar nature. It shall be the duty of Professional
Engineer to assure at its own expense that all work is technically sound and in conformance with
all applicable federal, state, and local laws, statutes, regulations, ordinances, orders, or other
requirements. In addition to all other rights which the City of Nashua may have, Professional
Engineer shall, at its own expense and without additional compensation, re-perform work to correct
or revise any deficiencies, omissions, or errors in the work or the product of the work or which
result from Professional Engineer's failure to perform in accordance with this standard of care. Any
approval by the City of Nashua of any products or services furnished or used by Professional
Engineer shall not in any way relieve Professional Engineer of the responsibility for professional
and technical accuracy and adequacy of its work. City of Nashua review, approval, or acceptance
of, or payment for any of Professional Engineer's work under this contract shall not operate as a
waiver of any of the City of Nashua's rights or causes of action under this contract, and Professional
Engineer shall be and remain liable in accordance with the terms of the contract and applicable law.

Professional Engineer shall furnish competent and skilled personnel to perform the work under this
contract. The City of Nashua reserves the right to approve key personnel assigned by Professional
Engineer to perform work under this contract. Approved key personnel shall not be taken off of
the project by Professional Engineer without the prior written approval of the City of Nashua,
except in the event of termination of employment. Professional Engineer shall, if requested to do
so by the City of Nashua, remove from the job any personnel whom the City of Nashua determines
to be incompetent, dishonest, or uncooperative.

CITY OF NASHUA REPRESENTATIVE The City of Nashua may designate a City of Nashua
representative for this contract. If designated, all notices, project materials, requests by

GC 2of 11

Page Image
Finance Committee - Agenda - 7/6/2022 - P8

Finance Committee - Agenda - 3/6/2019 - P617

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
617
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

3.09 TESTING, INSPECTION AND ACCEPTANCE

A. MATERIAL TESTING

1.

All material testing shall be performed by a registered independent, third-
party laboratory, and paid for by the Contractor.

The Contractor shall provide test results of the short term properties of the
cured lining material in the quantity of one test per liner batch, or 3,000 feet of
installed liner, or as required by the Owner. The liner shall be in compliance
with the physical properties described in these Specifications. Flexural

strength and modulus shall be tested in accordance with the requirements of
ASTM D 790.

B. INSPECTION

C.

D.

1.

After the work is completed, the Contractor shall inspect the pipeline by
closed circuit color television inspection and shall provide the Engineer with
one copy of a videotape or acceptable digital format recording of this
inspection log for the Owner’s records. Any repaired areas shall be re-
televised.

FIELD TEST (THICKNESS)

1.

Remove the CIPP liner material from the host pipe core samples. Remove
any inner liner film, pre-liner and resin that is not contained within the tube.
Measure the liner thickness at three spots on each sample. The resulting six
measurements will be averaged. The average thickness shall be equal to or
greater than the required thickness for the particular section. No undersize
allowance is permitted. In accordance with D 790-03, referenced in ASTM
1216, the calculated wall thickness refers only to the part of the liner that
consists of a saturated tube. Elements that are not part of the saturated tube do
not contribute to the structural integrity of the liner, thereby excluding tube
that is not fully saturated or portions of resin without the tube carrier.

ACCEPTANCE

1.

Prior to final acceptance, any defects that may affect the integrity or strength
of the pipeline is the opinion of the Engineer shall be repaired by the
Contractor at no additional cost to the Owner.

. Pipeline shall be true to line and grade, with no visual bulges, sags,

protrusions, deflections, offset joints, leaking joints, or other visible
infiltration, or other defects that would impair the intended use of the
completed pipeline.

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Hot Water or Steam)

Nashua, NH

02650-11

Page Image
Finance Committee - Agenda - 3/6/2019 - P617

Finance Committee - Agenda - 3/6/2019 - P618

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
618
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

3. Final acceptance of work shall not be granted until all defective areas are
repaired in accordance with the CIPP manufacturer’s recommendations and to
the Engineer’s satisfaction.

4. Any repairs required by the Engineer as a result of the post construction
internal inspection shall be performed by the Contractor.

5. Contractor shall perform a post construction internal inspection in accordance
with Section 02760. Final acceptance of the work shall not be granted until
post installation inspection has been reviewed and approved by the Engineer.

6. Contractor shall perform testing as specified. Final acceptance of the work

shall not be granted until the appropriately formatted testing results have been
reviewed and approved by the Engineer.

END OF SECTION

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Hot Water or Steam)
Nashua, NH 02650-12

Page Image
Finance Committee - Agenda - 3/6/2019 - P618

Finance Committee - Agenda - 3/6/2019 - P619

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
619
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02651

CURED-IN-PLACE (CIPP) LINING OF EXISTING SEWERS
(ULTRAVIOLET CURING)

PART 1 GENERAL

1.01 DESCRIPTION

A.

SCOPE

The work consists of furnishing all labor, equipment, materials, and incidentals
required to rehabilitate existing sewer mains by the installation of cured-in-place
pipe (CIPP) into the existing main. Work will include bypass pumping, sewer
cleaning and root cutting including decanting and disposal of debris at the City
landfill, initial closed circuit television (CCTV) inspection, identification of
existing live taps, removing of protruding taps by remote methods, installation of
resin-impregnated tube into the existing pipe followed by ultraviolet curing as
specified by the resin manufacturer, reopening service taps into the line, sampling
and testing, final closed circuit television (CCTV) inspection, and all other related
work. Before final acceptance of each line segment, a post-rehabilitation video
inspection and sample testing must be conducted and approved. Rehabilitation
must be completed for the full length from the manhole to manhole, resulting in a
sound, tight-fitting water-tight liner with a smooth interior surface. All such work
shall comply with these specifications and the specific product manufacturer’s
recommendations. Any conflict between the product manufacturer’s
recommendations and any portion of the contract documents shall be resolved
with the Engineer prior to proceeding with the work.

The Contractor, or the sub-contractor(s), shall not change any material, design
values or procedural matters stated or approved herein, without informing the
Engineer and receiving written advance approval of the change

Note:

Reference is made to the Supplementary Conditions Section A. Prosecution of
Work for a description of the process by which the Engineer will direct the
Contractor to make spot repairs both before and after lining.

SAFETY

This standard does not address safety problems associated with the use of this
product. It is the responsibility of the Contractor to establish appropriate safety
and health practices and determine the applicability of regulatory limitations prior
to use.

1.02 RELATED WORK:

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)

Nashua, NH

02651-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P619

Finance Committee - Agenda - 3/6/2019 - P620

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
620
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

ro Aa PP

Section 01110, CONTROL OF WORK AND MATERIALS
Section 02085, POLY VINYL CHLORIDE PIPE AND FITTINGS
Section 02252, SUPPORT OF EXCAVATION

Section 02300, EARTHWORK

Section 02441, CLEANING, ROOT CUTTING, AND TELEVISION (CCTV)

INSPECTION OF PIPELINES

F. Section 02631, PRECAST MANHOLES

G. Section 02745, ROAD RESTORATION

H. Section 02800, MANHOLE REHABILITATION

1.03 REFERENCE STANDARDS

The following references are part of this specification. The latest edition of the following
references shall be used:

ASTM C581- Standard Practice for Determining Chemical Resistance of
thermosetting resins used in glass fiber reinforced structures, intended for liquid
service.

ASTM D543- Test Method for resistance of plastics to chemical reagents.

ASTM D790- Test Method(s) for flexural properties of un-reinforced and
reinforced plastics and electrical insulating materials.

ASTM F1216 (including Appendix X1)- Standard practice for rehabilitation of
existing pipelines and conduits by the inversion and curing of a resin-impregnated
tube.

ASTM F1743-96- Rehabilitation of existing pipelines and conduits by pulled-in-
place installation of cured-in-place thermos-setting resin pipe (CIPP).

APS Standard- Water tightness standard for cured-in-place thermos-setting resin
pipe/Porosity Test protocol.

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)

Nashua, NH

02651-2

Page Image
Finance Committee - Agenda - 3/6/2019 - P620

Finance Committee - Agenda - 3/6/2019 - P621

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
621
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

1.04 QUALITY ASSURANCE

A.

REQUIREMENTS

1.

Products used in the work of this section shall be produced by manufacturers
regularly engaged in the manufacture of cured-in-place liners for municipal
wastewater systems and with a history of successful production acceptable to
the owner.

The installing Contractor shall be licensed by the cured-in-place lining system
manufacturer and shall have successful experience in the installation of cured-
in-place lining systems in municipal wastewater systems. The Contractor
shall also be familiar with the specified requirements and the methods needed
for proper performance of the work of this section.

When requested by the owner, the Contractor shall submit evidence
acceptable to the owner, such as a certified copy of a license or agreement,
that it has the authority to use and/or install the liner product.

The finished liner shall be continuous over the entire length of the liner
insertion run between the manholes and shall be free from visual defects such
as foreign inclusions, dry spots, pinholes, and delamination.

Wrinkles in the finished liner pipe which cause a backwater of one inch or
more or reduce the hydraulic capacity of the pipe are unacceptable and shall
be removed or repaired by the Contractor. If a void between the wrinkle and
the pipe develops, the Contractor shall repair or replace that section of the
pipe. Methods of repair shall be proposed by the Contractor and submitted to
the owner for review.

Following sewer cleaning and prior to installation of liner and finish work at
the manholes, the sewer shall be televised and recorded on videotape or in
digital format acceptable to the Engineer such as CD or DVD, and shall be
provided to the Engineer. The Contractor shall also televise the sewer after
completion of all liner insertion and finish work at the manholes. All Closed-
Circuit Television (CCTV) work is to be completed per a national standard for
sewer inspections.

The Contractor installing the Sectional Lining system shall have completed at
least five (5) projects, in the United States, within the past three (3) years and
projects that included CIPP installation lengths of at least 300 continuous
linear feet, on-site wet-out or resin impregnation of the liner tube, and design
of a similarly sized Sectional Liner wall thickness based on a fully
deteriorated condition.

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)

Nashua, NH

0265 1-3

Page Image
Finance Committee - Agenda - 3/6/2019 - P621

Finance Committee - Agenda - 3/6/2019 - P622

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
622
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

8. Supervisory personnel shall have a minimum of five (5) years of experience in
a supervisory role, and shall have completed at least five (5) projects of
similar size and complexity as this project within the past five (5) years.
Attach résumés of each person named. Résumé information shall include, at a
minimum, educational background, the number of years in a supervisory
capacity and a list of completed projects within the past two (2) years,
including project description, complexity and contract total amounts.

1.05 SUBMITTALS

The Contractor shall submit the following information:

A.

MATERIALS

Contractor shall provide submittals on all lining materials and resins, and shall
furnish the manufacturers’ certifications that all of the liner materials are in
compliance with the specifications, codes, and standards referenced herein.
Calculations for the liner design and wall thickness for each manhole to manhole
section of pipe shall be prepared in accordance with ASTM 1216, signed and
sealed by a Professional Engineer registered in New Hampshire. The submittals
shall include installation instructions and details of all component materials and
construction methods. The Contractor shall also provide the liner tube
manufacturer’s certifications, field measurements, and pipe sizing calculations
which demonstrate that the liner tube has been properly sized to avoid the creation
of wrinkles or folds. The Contractor shall furnish Material Safety Data Sheets for
all appropriate materials to be used in the project.

INSTALLATION

The Contractor shall submit the method of liner insertion, liner size, thickness
calculations, and assumptions used as the basis for calculations for review by the
Engineer prior to the start of work. The liner shall provide complete structural
support without considering any structural support from the existing pipe except
during construction.

1.06 DESIGN PARAMETERS

A. The newly installed liner shall be designed for a minimum fifty-year service life
under continuous loading conditions. The design shall assume no bonding to the
original pipe wall. The liner shall be designed to withstand all imposed loads.
Parameter C.LP.P. System
1. Pipe Condition Fully deteriorated
2. Soil Type Per in-situ conditions

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)
Nashua, NH 02651-4

Page Image
Finance Committee - Agenda - 3/6/2019 - P622

Finance Committee - Agenda - 3/6/2019 - P623

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
623
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

3. Design Thickness Fiberglass: ASTM 1216 Design Formula,

4. Ovality of Pipe: 2% of circumference.

5. Soil Land 120 Ibs/ft.?

6. Traffic Loads Per AASHTO-HS-20-44 Highway Loading

7. Modulus of Soil 500 psi.

8. Maximum Deflection 5%

9. Minimum Safety 2.0

10. Resin Migration Not Allowed

11. Soil Cover Maximum depth of cover over the pipe
crown to highest ground surface along the
length of the pipe lining.

12. Water Table Assume at ground surface.

PHYSICAL PROPERTIES: The cured pipe shall conform to the minimum
structural standards, as follows:

Tensile Stress ASTM D-638 3,000psi
Flexural Stress ASTM D-790 4,500psi
Modulus of Elasticity ASTM D-790 250,000psi
(Initial)

Modulus of Elasticity ASTM D-2990 125,000psi
(Long Term)

Porosity/Water Tightness Test Tight

1.07 LINER THICKNESS CALCULATIONS

A. Calculations for the fiberglass liner design and thickness for each manhole to
manhole section of pipe shall be prepared, signed and sealed by a Professional
Engineer registered in New Hampshire, and submitted to the Engineer for review
prior to lining. The minimum allowable thickness for CIPP products is 3.5mm and
must be increased as necessary to meet ASTM 1216 Design Formula in 0.7mm
manufacturing increments. Lining products below the stated minimum wall
thickness (above) will not be allowed under any circumstances.

1.08 CHEMICAL RESISTANCE

A. CHEMICAL RESISTANCE
Chemical resistance shall be in accordance with the requirements of Section 8 of
ASTM F 1216, Section X2, Chemical Resistance Tests for polyester resins and
completed in accordance with Test Method D 543. Exposure should be for a
minimum of one month at 73.4 degrees F when subjected to the following
solutions:

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)
Nashua, NH 02651-5

Page Image
Finance Committee - Agenda - 3/6/2019 - P623

Finance Committee - Agenda - 3/6/2019 - P624

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
624
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

Chemical Solution Concentration, %
Tap Water (ph 6-9) 100

Nitric Acid 5

Phosphorus Acid 10

Sulphuric Acid 10

Gasoline 100

Vegetable Oil 100

Detergent 0.1

Soap 0.1

The Contractor shall be responsible for all costs associated with the chemical
resistance tests. Proof of meeting these requirements shall be provided to the
Engineer for approval at least 7 days prior to the commencement of work.

1.09 WARRANTY

A. WARRANTY
The Contractor shall provide the Owner with a warranty to be in force and effect
for a period of one (1) year from the date of final acceptance of the project by the
Owner. The warranty shall cause the Contractor to repair or replace the liner
should failure or damage result from faulty materials or installation. At the end of
the warranty period, the Engineer may perform a television inspection to confirm
the condition of the liner.

PART 2 MATERIALS
2.01. GENERAL

A. CERTIFICATE OF COMPLIANCE
A Certificate of Compliance with these Specifications shall be provided by the
manufacturer for all materials furnished under these specifications.

2.02 MATERIALS
A. RESIN

1, ACCEPTABLE RESINS TYPES:
a. Polyester npg.
b. Orthothalic
c. Vinylester

2. The liquid thermosetting resin used in this rehabilitation project shall

produce a properly cured tube which will be resistant to abrasion caused

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)
Nashua, NH 02651-6

Page Image
Finance Committee - Agenda - 3/6/2019 - P624

Finance Committee - Agenda - 3/6/2019 - P625

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
625
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

B.

by solids, grit, and/or sand. The cured tube shall also be resistant to
corrosion due to acids and gases such as sulfuric acid, carbonic acid,
hydrogen sulfide, methane, and carbon monoxide. The Cure-In-Place-
Pipe system shall utilize thermosetting resins which will withstand the
corrosive effect of the existing residential commercial, and industrial
sewage effluents, liquids and/or gases.

The resin system to be used shall be manufactured by an approved
company selected by the Cured-In-Place process manufacturer.
Documentation of approved status is a pre-lining requirement.

LINER TUBE

1.

ACCEPTABLE MATERIALS
Fiberglass (cured with ultra-violet light).
TUBE CHARACTERISTICS AND STANDARDS

At the time of manufacture, each lot of glass fiber liner shall be inspected
for defects and tested in accordance with applicable ASTM standards. At
the time of delivery, the liner shall be homogeneous throughout, uniform
in color, free of cracks, holes, foreign materials, blisters, and deleterious
faults.

For testing purposes, a production lot shall consist of all liner having the
same marking number. It shall include any and all items produced during
any given work shift and must be so identified as opposed to previous or
ensuing production.

The ENGINEER may at any time direct the manufacturer to obtain
compound samples and prepare test specimens in accordance with
applicable ASTM standards.

An “inner liner” and “outer liner” film must be used for resin control (to
prevent resin migration and contamination). The “inner film” and “outer
film” must both be certified styrene gas barriers. The “inner liner” film
must be removed during the installation process unless it is a permanent
part of the system and is made an integral part of the carrier tube by
bonding or fusing to the carrier tube.

The material shall be manufactured in such a manner as to result in a tight-
fitting, continuous liner after installation. There shall be no measureable
annular space. The liner shall have a snug fit at manhole terminations as
shall be evidenced by flares.

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)

Nashua, NH

02651-7

Page Image
Finance Committee - Agenda - 3/6/2019 - P625

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2225
  • Page 2226
  • Page 2227
  • Page 2228
  • Current page 2229
  • Page 2230
  • Page 2231
  • Page 2232
  • Page 2233
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact