Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P624

Finance Committee - Agenda - 3/6/2019 - P624

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
624
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

Chemical Solution Concentration, %
Tap Water (ph 6-9) 100

Nitric Acid 5

Phosphorus Acid 10

Sulphuric Acid 10

Gasoline 100

Vegetable Oil 100

Detergent 0.1

Soap 0.1

The Contractor shall be responsible for all costs associated with the chemical
resistance tests. Proof of meeting these requirements shall be provided to the
Engineer for approval at least 7 days prior to the commencement of work.

1.09 WARRANTY

A. WARRANTY
The Contractor shall provide the Owner with a warranty to be in force and effect
for a period of one (1) year from the date of final acceptance of the project by the
Owner. The warranty shall cause the Contractor to repair or replace the liner
should failure or damage result from faulty materials or installation. At the end of
the warranty period, the Engineer may perform a television inspection to confirm
the condition of the liner.

PART 2 MATERIALS
2.01. GENERAL

A. CERTIFICATE OF COMPLIANCE
A Certificate of Compliance with these Specifications shall be provided by the
manufacturer for all materials furnished under these specifications.

2.02 MATERIALS
A. RESIN

1, ACCEPTABLE RESINS TYPES:
a. Polyester npg.
b. Orthothalic
c. Vinylester

2. The liquid thermosetting resin used in this rehabilitation project shall

produce a properly cured tube which will be resistant to abrasion caused

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Ultraviolet)
Nashua, NH 02651-6

Page Image
Finance Committee - Agenda - 3/6/2019 - P624

Footer menu

  • Contact