Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 22321 - 22330 of 38765

Finance Committee - Agenda - 3/6/2019 - P653

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
653
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

DIVISION 1

INVITATION TO BID

Page Image
Finance Committee - Agenda - 3/6/2019 - P653

Finance Committee - Agenda - 3/6/2019 - P654

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
654
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

foeh) THE CITY OF NASHUA

Pinaud Seretées
Purchasing Departetent

“The Gate City”

February 12, 2019

IFB0779-021419
2019 SEWER REPLACEMENT PROJECT

ADDENDUM NO.1

Information included in this document becomes a part of the original IFB.

If you are submitting a paper bid, please sign below to indicate receipt of this additional information and include this
page with your bid submittal. If you are submitting a bid via Bid Express please be sure to acknowledge the addendum
on the website before submitting your bid.

ADDENDUM 1 is being issued te answer all questions for this Bid.

All other aspects of the original document remain the same.

Failure to acknowledge the addendum will result in the bid submittal being disqualified.

Sincerely,
f af oat
MSV
Dan Kooken

City of Nashua — Purchasing Manager

kookend@nashuanh.gov

Addendum #1 received and incorporated into bid submittal for IFBO779-021419.
Please sign and include this addendum in your bid package.

7

(Authorized Signature) Sven A-Gmrex, reste

Feb. 14, Bory
(Date)

\) - Cranese L Sun s,2ine
(Name of Firm)

IFBO7 79-021419 ADDENDUM NO. 1 Page 1 of i

Page Image
Finance Committee - Agenda - 3/6/2019 - P654

Finance Committee - Agenda - 3/6/2019 - P655

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
655
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

IFB0779-021419
ADDENDUM #1

2019 Sewer Replacement Project

Addendum #1 is being issued to respond to questions received from bidders:
1. Will Davis-Bacon or prevailing wages be in effect for this project?
Answer: Davis-Bacon Act prevailing wage rates do not apply to this project..

2. There is a conflict between the retainage as stated in the Instructions to Bidders,
Article 20 and the Sample Agreement.

Answer: Instructions for Bidders, Article 20, Retainage shall be deleted in its
entirety and replaced as follows:

ARTICLE 20 + =RETAINAGE

20.01 Provisions concerning retainage and Contractors’ rights to deposit
securities in lieu of retainage are set forth in the Agreement, Article 6.02
Progress Payments; Retainage.

3. Are flow rates available for bypass flow expectations?

Answer: Specific sanitary and storm water flow rates for the sewers to be replaced
are not available; however the attached Sewer Infrastructure Map dated
9/27/2018 is attached to this Addendum for reference. The map shows the
Nashua sewer system as well as general information about dry weather
flows at various CSOs in the City. Please be advised that all sewers to be
reconstructed are combined sanitary and storm sewers.

4. A question was asked regarding the lump sum payment for Mobilization (Item 24)?

Answer: Delete Paragraph 2.03 B of Section 01150, MEASUREMENT AND
PAYMENT, PART 2 - DESCRIPTION OF PAY ITEMS, and substitute
the following:

2019 Sewer Replacement Project Addendum #1
Nashua, NH Page I

Page Image
Finance Committee - Agenda - 3/6/2019 - P655

Finance Committee - Agenda - 3/6/2019 - P656

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
656
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

2.03 PROJECT START-UP AND PROJECT CLOSE OUT:

A. MOBILIZATION
Measurement:
Mobilization shall be measured as a LUMP SUM as specified
herein. The total cost for this item shall not exceed 5 percent
of the total of all bid items excluding this item.

Payment:
The contract price for ITEM 24 shall constitute full

compensation to the Contractor for the general mobilization
and demobilization necessary to make the contract
operational, exclusive of the cost of materials. Payments
toward the lump sum will be made at each payment requisition
based on the percent of contract amount completed. Final
payment of this item will be paid based on the percent of the
contract amount completed. Should the contract be
terminated prior to completion, or the contract work not
completed, total payment for this item shall be proportional to
the percentage of the contract amount completed. No
additional payment will be made if the contract value is
increased.

5. A concern was raised regarding the maximum rate of $30 per hour for flaggers.

Answer: The City has decided to bid the cost for flaggers on an hourly basis
without specifying the maximum hourly rate. The Bid Schedule has been
revised to show the quantity of flagger hours under Item 26. Delete
Paragraph 2.04 B of Section 01150, MEASUREMENT AND PAYMENT,
PART 2 - DESCRIPTION OF PAY ITEMS, and substitute the following:

2.12 > MAINTENANCE AND PROTECTION OF TRAFFIC
B. FLAGGERS

Measurement:

The quantity of Flaggers will be measured by the HOUR
based on the actual number of hours authorized, as
determined by the Engineer. The Contractor shall supply
qualified flaggers as stated in Section 618 of the NADOT
Standard Specifications for Road and Bridge Construction,
(Approved and Adopted in 2016). Daily coverage needs to be
approved by the Engineer. The Contractor's schedule for
flaggers shall be agreed upon cooperatively with the Engineer.

2019 Sewer Replacement Project Addendum #1
Nashua, NH Page 2

Page Image
Finance Committee - Agenda - 3/6/2019 - P656

Finance Committee - Agenda - 7/6/2022 - P12

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
12
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

in full satisfaction of such hindrances and delays any extension of time that the City of Nashua may
provide.

11. INSURANCE Professional Engineer shall carry and maintain in effect during the performance of
services under this contract:

> General Liability insurance in the amount of $1,000,000 per occurrence; $2,000,000
aggregate;
> $1,000,000 Combined Single Limit Automobile Liability;
*Coverage must include all owned, non-owned and hired vehicles.
> $1,000,000 Profession Liability;
> and Workers' Compensation Coverage in compliance with the State of New
Hampshire statutes, $100,000/$500,000/$ 100,000.

Professional Engineer shall maintain in effect at all times during the performance under this
contract all specified insurance coverage with insurers. None of the requirements as to types and
limits to be maintained by Professional Engineer are intended to and shall not in any manner limit
or qualify the liabilities and obligations assumed by Professional Engineer under this
contract. The City of Nashua shall not maintain any insurance on behalf of Professional Engineer.
Subcontractors are subject to the same insurance requirements as Professional Engineer and it shall
be the Professional Engineer’s responsibility to ensure compliance of this requirement.

Professional Engineer will provide the City of Nashua with certificates of insurance for coverage
as listed below and endorsements affecting coverage required by the contract within ten calendar
days after the City of Nashua issues the notice of award. The City of Nashua requires thirty days
written notice of cancellation or material change in coverage. The certificates and endorsements
for each insurance policy must be signed by a person authorized by the insurer and who is licensed
by the State of New Hampshire. General Liability and Auto Liability policies must name the
City of Nashua as an additional insured and reflect on the certificate of insurance. Professional
Engineer is responsible for filing updated certificates of insurance with the City of Nashua's Risk
Management Department during the life of the contract.

> All deductibles and self-insured retentions shall be fully disclosed in the certificate(s) of
insurance.

> If aggregate limits of less than $2,000,000 are imposed on bodily injury and
property damage, Professional Engineer must maintain umbrella liability insurance of at
least $1,000,000. All aggregates must be fully disclosed onthe required certificate of
insurance.

> The specified insurance requirements do not relieve Professional Engineer of its
responsibilities or limit the amount of its liability to the City of Nashua or other
persons, and Professional Engineer is encouraged to purchase such additional
insurance, as it deems necessary.

> The insurance provided herein is primary, and no insurance held or owned by the City
of Nashua shall be called upon to contribute to a loss.

> Professional Engineer is responsible for and required to remedy all damage or loss to any
property, including property of the City of Nashua, caused in whole or part by
Professional Engineer or anyone employed, directed, or supervised by Professional
Engineer.

12. INDEMNIFICATION Regardless of any coverage provided by any insurance, Professional Engineer
agrees to indemnify and hold harmless the City of Nashua, its agents, officials, employees and
authorized representatives and their employees from and against any and all suits, causes of action,
legal or administrative proceedings, arbitrations, claims, demands, damages, liabilities, interest,

GC 60f11

Page Image
Finance Committee - Agenda - 7/6/2022 - P12

Finance Committee - Agenda - 3/6/2019 - P657

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
657
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

Payment:

The approved quantity of flagger hours shall be paid at the
contract price for ITEM 26. Payment shall constitute full
compensation to the Contractor for providing qualified
flaggers as required to direct traffic through or around the
Work as ordered by the Engineer, including all labor, high
visibility safety gear, tools and any other equipment necessary
to complete the work as specified herein. Payments to
Contractor will be made based on approved hours and
resulting dollar amounts.

6. A question arose at the pre-bid meeting regarding handling of sewer service
connection flows during construction?

Answer:

Add the following item to Supplementary Conditions:

V. WORK PLAN
The Contractor shall submit a Work Plan to the Engineer for
acceptance prior to the start of work on any street. In order to be
considered acceptable the Work Plan must at a minimum address
the following:

>
>

>

Schedule for the work.

Proposed method for communication with affected residents
and businesses.

Proposed traffic control plan.

Proposed methods for handling sewage flows from upsteam
drainage areas.

Proposed methods for handling flow from sewer service
connections during construction of the sewer main.
Provisions the Contractor shall take in order to be able to
immediately address unforeseen backups that may occur in
services during work on the project.

The Contractor’s Work Plan shall comply with the following:

>

>

2019 Sewer Replacement Project

Nashua, NH

The Contractor shall provide access to local residents and
businesses at all times.

The main line sewer shall be reconnected and in service
after work hours. By-pass pumping over night and on
weekends and holidays shall not be allowed.

The Contractor shall advise residents and businesses in
advance and in writing of any impact to utility services.

Addendum #1
Page 3

Page Image
Finance Committee - Agenda - 3/6/2019 - P657

Finance Committee - Agenda - 3/6/2019 - P658

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
658
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

> Methods proposed for maintaining flow in sewer mains and
service connections shall be described in detail, and shall
have been proven by successful use in similar past projects.

> The trench shall be plated after work hours, and the work
area shall be open to traffic.

7. Add the following Item to the SUPPLEMENTARY CONDITIONS:

W. AVOIDING PIPE AND CATCH BASIN CONFLICTS WITH
EXISTING UTILITIES

The Contractor shall excavate the trench for catch basins and
associated pipe laterals in advance of laying pipe in order to
determine whether any utility interferes with the proposed
alignment of pipelines and/or location of catch basins. Any
adjustments required to avoid utility conflicts shall be approved by
the Engineer prior to installation. The Contractor shall have on
hand several different 4’ diameter barrel sections for possible
adjustment to catch basin depth.

8. A question arose at the pre-bid meeting regarding hours of operation?

Answer: Add the following paragraph to Item C, SUPPLEMENTARY
CONDITIONS:

C. WORK HOURS

Bridge Street at C Street:

Working hours are from 9 am to 3 pm, with approved one lane
alternating traffic plan and/or detour in one direction. Any closures
of road will require work to be done during night hours.

Central Street at Ash Street:
Working hours are from 7 am to 5 pm, with an approved plan
having at a minimum one lane open in both directions.

Charles Street:

Working hours are from 8 am to 5 pm, with approved traffic
plan. An approved detour plan is required if closing street.

Note: The City reserves the right to stop work should traffic
controls prove to be inadequate. Should a problem arise as a result
of the approved traffic control plan, additional traffic control
measures may be required at the contractor’s expense.

2019 Sewer Replacement Project Addendum #1
Nashua, NH Page 4

Page Image
Finance Committee - Agenda - 3/6/2019 - P658

Finance Committee - Agenda - 3/6/2019 - P659

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
659
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

9. REVISED BID SCHEDULE:

A revised BID SCHEDULE has been included in this Addendum for use by bidders
(See attached PDF).

10. REVISED SHEET 2 of 8 - QUANTITY SUMMARY:

A revised Sheet 2 of 8 - Quantity Summary has been included in this Addendum for
use by bidders (See attached PDF).

- END -

2019 Sewer Replacement Project Addendum #1
Nashua, NH Page 5

Page Image
Finance Committee - Agenda - 3/6/2019 - P659

Finance Committee - Agenda - 3/6/2019 - P660

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
660
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

2£j01-S4a

TVLOLGS I aDVd

Buydnoy surpnjour wide] 6 04,0 AMS JOMaS CE-ACS OAd.01| ST I c
Sduljdnog pue ssunty suipnjour syjdeq [TV
SOIAIOS JOMOS SE-UCS QAd .9 WIM Sde|day pure Sd1Alag Jomeg eAOWIO| AT ssl al
_smdeq iv
odid ured Se-UdS OAd .01 WIM ooeldoy pur [ere] ureiq Sunsixg oaowoy| AT OLT al
yideqd ,€1 01 ,6<
adid JOMOS SE-UAS OAd uC WIM oouldoy pue Jamas Sunsixg oaowoy)] aT 16S 1
tdaq 6 01,0
adi JOMOS SEUAS DAd «Cl WIM soeldoy pure Jamag SuNSIXg cAOWOY| AT 569 al
indo .6 01,0
adi JOMOS SEAS DAd uST WIM dovfdoy pue Jamas SuLsIxg sAOWDY| JT 91 VI
DLA [e}0L did JU) Woydioseq Wj] sjiuq. | Ajguend | “oN
Wis3]

(l# WAGNAddy) }92fo1g yusWMadEldoy 19M9g 6107 - AINGAHOS Id

| 61F1Z0-6LL0EA1

pofoig pUdTIIETAIyY IIMIS 610Z
SYAOM IGN JO WOISTAIG,
aIysduepy MAN ‘enygsen Jo AyD

Page Image
Finance Committee - Agenda - 3/6/2019 - P660

Finance Committee - Agenda - 3/6/2019 - P661

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
661
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

249¢-S4

TVLOLANS 7 HOVd
ulseg Yyoyes sovjdoy pue saoulay] =A 601 Ol
(uONeAROXY YOUSIL JOYIO UI Jou JI AUC) Jeloye'] uleiq pouopueqy saowlsy| JT 907 6
9[OH] SUNSIXY YIM sOYURJ] OMA SUTISIXY 0} JaMag MAN JOoUUOD] WA S 8
uolonysuOSSY LaAuy sjoyueyy| Wa ¢ L
gjoyuey] James SUNSIXY SAOWIOY] Wa Z 9
a]oyURP] JOMIS SUISIX” s0e[doy JO MON| AA ~9 S
OAM OAd u2l X.9| WA SZ dv
OAM Ad uZ1 X01] Wa S Vr
(AA 9 9} Z) AouUNYD DAd 9] WA 01 €
dd [OL dog Mul) Wo diaseq Ws] swag, | Auend | *on
1193]

(l# WAGNAAAY) }92fo1g JusuIIe|day 1aMIg 610Z - WINGAHOS AIA

Page Image
Finance Committee - Agenda - 3/6/2019 - P661

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2229
  • Page 2230
  • Page 2231
  • Page 2232
  • Current page 2233
  • Page 2234
  • Page 2235
  • Page 2236
  • Page 2237
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact