Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 20361 - 20370 of 38765

Finance Committee - Agenda - 12/5/2018 - P38

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
38
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

BID ITEM DEFINITIONS

Concrete Block Wall
Four Hills Landfill
Nashua, New Hampshire

The following describes the Bid Items and the mechanism for payment to CONTRACTOR for each
completed Bid item. All incidental costs such as overhead, profit, and insurance shall be factored into
the Bid Item unit prices. All measurements are based on plan view areas and lengths without
consideration of slope, Bidders shall verify quantities provided in the Schedule of Values-Bid Item
sheet and should factor slope adjustments into their Bid Item unit prices.

Bid item No. 1 Mobilization /Demobilization

This item requires that CONTRACTOR furnish and/or deliver to the job site all labor, materials,
resources, and temporary support facilities, including but not limited to portable sanitary facilities,
and equipment necessary to perform the required Work. In addition, CONTRACTOR shall prepare
all required written plans and schedules, including but not limited to: Site-Specific Health and Safety
Plan, initial and progress construction schedules, and subcontractor work plans. One half of this
itera will be paid as part of the initial pregress payment after temporary support facilities are set up
and construction equipment and materials have been delivered to the Site. The remainder will be
paid for demobilization after the Work has been deemed substantially complete, CONTRACTOR has
provided Record Documents in accordance with the requirements of the Specifications, and
CONTRACTOR has demobilized from the Site, which shall include removal of all materials, resources,

equipment, temporary support facilities, and all remaining construction debris at the completion of
the work.

Bid Hem No. 2 Furnish and Install Concrete Blocks

This Bid Item includes all labor, materials, equipment, tools, and apparatus as necessary, to furnish
and install concrete blocks as shown on the Drawings. Note that 250 blocks have been pre-
purchased, are on-site, and shall be used in this phase of setback wall construction. CONTRACTOR
shall be responsible to provide equipment and labor necessary to transport on-site
blocks from existing location to work area. CONTRACTOR shall purchase remaining
blocks required to complete this bid item and be responsible to provide equipment and labor
necessary to transport and unload concrete blocks at the site. CONTRACTOR shall be responsible
for placing and compacting Common Borrow Fill along the east side of the east concrete block wall as
shown on the drawings. OWNER will supply the Common Borrow Fill material; however,
CONCTRACTOR will be responsible for screening Common Borrow Fill as necessary for placement
and compaction on the east side of the east wall. This item will be paid on a unit basis per linear
foot of wall constructed as specified on the Drawings.

Bid ltem No. 3 Supply and Instali Wall Lining
This item includes all labor, materiais, equipment, tools, and apparatus as necessary, to furnish and
install 60-mil HDPE Smooth Geomembrane and 10 ounce per square yard nonwoven geotextile

as specified on the Drawings. This item will be paid on a unit basis per lineal foot of wall
constructed as specified on the Drawings.

Page 2 of 4

Page Image
Finance Committee - Agenda - 12/5/2018 - P38

Finance Committee - Agenda - 12/5/2018 - P39

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
39
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

Bid Item No. 4 Survey

This item requires that CONTRACTOR provide all labor and equipment required to perform
construction layout and as-built decumentation as required by the Drawings and as requested by
ENGINEER and/or OWNER. Construction layout shall be completed prior to the start of screened till
placement and shall include the concrete block wall alignment and all other work items as defined in
the Drawings. CONTRACTOR shall document the constructed alignment of the concrete block wail.
As-built survey locations shall be performed as features are constructed for payment and record
information and shall include all completed items as defined in the Drawings. This item will be paid on
a lump sum basis prorated over the scheduled duration of the work.

Page 3 of 4

Page Image
Finance Committee - Agenda - 12/5/2018 - P39

Finance Committee - Agenda - 12/5/2018 - P40

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua, NH
Liability Insurance Requirements

July 1, 2015

The VENDOR must maintain the following lines of coverage and policy lirnits for the duration of the
contract. Any subcontractors used by the VENDOR arc subject to the same coverage and limits and is a
subcontractor to the VENDOR and not the OWNER. It is the responsibility of the VENDOR to update
Certificates of Insurance during the term of the contract.

» General Liability:
$1,000,000 per Occurrence
$2,000,000 Aggregate
(City of Nashua Additional Insured}

» Motor Vehicle Liability:
$1,000,000 Combined Single Limit *coverage must include all owned, non-owned
and hired vehicles.
(City of Nashua Additional Insured)

» Workers’ Compensation Coverage according to Statute of the State of New Hampshire:
$100,000 / $500,000 / $100,000

(Sole Proprietors not subject to Workers’ Compensation requirements)

VENDGR and subcontractors at every ticr under the VENDOR will fully comply with NH RSA 281-A,
“Workers’ Compensation”.

Page 4 af 4

Page Image
Finance Committee - Agenda - 12/5/2018 - P40

Finance Committee - Agenda - 12/5/2018 - P41

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
41
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

“CONCRETE BLOCK WALL CONSTRUCTION DRAWINGS

FOUR HILLS LANDFILL

NASHUA, NEW HAMPSHIRE
DECEMBER 2013

DES-SW-SP-95-002
(REVISED AUGUST 2014)
(REVISED DECERIBER 2015)
(REVISED JAUARY 2017) SHEET INDEX
(REVISED FEBRUARY 2018) sucer,
(REVISED AUGUST 2018)

EAN SN OITONS AM COM He taf
BLOGRWALEPINN 4S BUILT PLAY

2 SHEET 2 PRAIPEPRORLE POLE peal
S SHEETS af CONCRETE BLOCK WALL DETAILS

LOCUS PLAN

SCALE: 1°= 1000

SNUARENEL

CIty OF NASHUA SANBORN Hl HEAD
FOUR HILLS LANDFILL _

NASHUA, NEW HAMPSHIRE

PSHIRE G2304

BY STREET. CONCORD
Gad~ Ria

Page Image
Finance Committee - Agenda - 12/5/2018 - P41

Finance Committee - Agenda - 12/5/2018 - P42

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

BS PRERARED FROM
TUE GH Tse ROUND FIELD
SONEUCTED BY SE &

GHAPHIC SCALE
2 2

ie
AS—BUILT PLAN
FOUR wie LANDFOL
HASHUA, a MPSHIRE

kORTHEAST CART BECHANICS

Wp) |

rsh 24 8
PSone fo

eb tik
taszien

To
te oF 3oF3

Page Image
Finance Committee - Agenda - 12/5/2018 - P42

Finance Committee - Agenda - 8/17/2022 - P45

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Fri, 08/12/2022 - 13:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2022 - 00:00
Page Number
45
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

Revenues
Property taxes
Aulo pemnits
Penalties, interest and other taxes
Charges for services
Intergovernmental
Licenses and permits
Investment income
Contributions
Hydroelectnc power generation
Cable TV franchise fees
Rentals and lease income
Miscellaneous

Total Revenues

Expenditures

Current:
General government
Police
Fire
Water fire protection services
Education
Public works
Health and human services
Culture and recreation
Community development
Communications
Hydroelectne

Debt service
Pnncipal
Interest and issuance cost

Total Expenditures

Excess (Deficiency) of Revenues
Over (Under) Expenditures

Other Financing Sources (Uses)

Issuance of general obligation bonds

Issuance of refunding bonds
Bond premiums

Bond premiums from refunding bonds

Pay ment to refunding escrow agent
Issuance of capital leases

Trans fers in

Transfers out

CITY OF NASHUA, NEW HAMPSHIRE

FOR FISCAL YEAR ENDED JUNE 30, 2021

Total Other Financing Sources {Uses}

Change in Fund Balance
Fund Balance at Beginning of Year
Fund Balance at End of Year

GOVERNMENTAL FUNDS
STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN FUND BALANCES

Debt Nonmajor Total
General Service Govemmental Govemmental
Fund Fund Funds Funds
$ 215,475,162 $ - $ 1,069,415 $ 216,544,577
16,216,065 - 700,000 16,916,065
1,239,839 . : 1,239,839
891,348 - 1,936,316 2,827,664
50,650,784 - 31,581,857 $2,232,641
1,511,234 . - 1,511,234
104,424 - 7,859,860 7,964,284
- 8,766,301 4,820,926 13,587,227
1,026,971 . - 1,026,971
876,241 - 421,894 1,298,135
720,637 - 16,800 737,437
788,203 - 294,600 1,082,803
289,500,908 8,766,301 48,701,668 346,968,877
16,725,415 - 1,407,349 18,132,764
34,012,596 - 4,133,099 38,145,695
27,927,094 . 2,415,568 30,342,662
3,172,524 . - 3,172,524
160,025,919 - 34,268 684 194,294,603
11,008,053 - 9,430,757 20,438,810
2,194,939 . 4,755,904 6,950,843
7,046,950 - 176,961 7,223,911}
3,549,528 - 28,506,511 32,056,039
551,283 - 216,480 767,763
502,874 - 1,838,006 2,340,880
12,064,500 3,690,000 965,000 16,719,500
3,987,382 5,076,591 695,189 9,759,162
282,769,057 8,766,591 88,809,508 380,345,156
6,731,851 (290) (40,107,840) (33,376,279)
- - 41,828,500 41,828,500
1,444,000 - 1,444,000
286,987 - 1,773,500 2,060,487
289,231 - - 289,231
(1,733,231) - - (1,733,231)
6.671, 814 - - 6,671,814
743,100 - 1,048,322 1,79] 422
(7,283,552) - (743, 1013 (8,026,653)
418,349 - 43,907,221 44,325,570
7,150,200 (290) 3,799,381 10,949,291
63,053,259 4,313,291 44,941,631 112,308,181
$70,203,459 § 4,313,001 $48,741,012 $ 123,257,472

The accompanying notes are an integral part of these financial statements

37

Page Image
Finance Committee - Agenda - 8/17/2022 - P45

Finance Committee - Agenda - 12/5/2018 - P43

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

“BLOLES
BLACKS
BLOCKS

Page Image
Finance Committee - Agenda - 12/5/2018 - P43

Finance Committee - Agenda - 12/5/2018 - P44

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

ts

TYPEICA

EERIE host

3

PRE) bet

SELES,

i

RALPIES

RALPH

Deaf

UAL

CONCRETE BLOCK WALL CON
EU al!

CITY OF NASHUA

CONCRETE BLOCK WALL

DETAILS

STRUG HON DRAWINGS:

Page Image
Finance Committee - Agenda - 12/5/2018 - P44

Finance Committee - Agenda - 12/5/2018 - P45

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
45
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

THE CITY OF NASHUA “The Gate City"

Financial Services

Purchasing Department

November 29, 2018
Memo #19-098

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2018 SEWER REPLACEMENT — HARVARD STREET — CHANGE ORDER 2 (VALUE:
$440,037)
DEPARTMENT: 169 WASTEWATER; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated November 19,
2018 for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.
The City Engineer, Board of Public Works (November 19, 2018 meeting) and the Purchasing Department

recommend the award of this Change Order 2 in an amount of $440,037 to Northeast Earth Mechanics
Inc. of Pittsfield, NH.

Respectfully,

Dan Kooken
Purchasing Manager

Cc: S Dookran L Fauteux

229 Main Street » Nashua, New Hampshire 03061 * Phone (603) 589-3330 « Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 12/5/2018 - P45

Finance Committee - Agenda - 12/5/2018 - P46

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

To:

From:

Re:

D. Motion:

Thiscussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: Novernber 19, 2018

Stephen Dookran, P.E., City Engineer
Engineering Department

2018 Sewer Replacement ~- Harvard St
Change Order 2

To approve Change Order No. 2 to the construction contract for the 2018 Sewer
Replacement — Harvard St project to Northeast Earth Mechanics of Pittsfield, NH in
an amount of $440,037.10. Funding will be through: Department: 169 Wastewater;
Fund: Bond; Activity: Sewer Rehab.

The original contract to Northeast Earth Mechanics in the amount of $692, 905.20
was for the replacement of the 1887 cement sewer main on that street Harvard St.
This work has not started because Pennichuck must replace the water line prior to
construction beginning.

In the meantime, the 15 inch cement sewer constructed in 1885 in Chase Street has failed
and requires immediate replacement. In addition, one property on the street is experiencing a
sewer backup. Through a no cost Change Order No. 1, Northeast Earth Mechanics was
directed to use the existing contract funds to replace the sewer on Chase St.

The purpose of this Change Order No. 2 is to replenish the funds so that the Harvard St.
sewer can be constructed in the spring. The value of the Chase St work is $440,037.10.
Pending bond approval to provide these funds, this Change Order No. 2 is to replenish
the $440,037.10 for Harvard St.

Upon approval of Change Order 2, the total value of this contract will be $1,132,932.30.

Page Image
Finance Committee - Agenda - 12/5/2018 - P46

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2033
  • Page 2034
  • Page 2035
  • Page 2036
  • Current page 2037
  • Page 2038
  • Page 2039
  • Page 2040
  • Page 2041
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact