Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 1991 - 2000 of 38765

Finance Committee - Agenda - 5/4/2022 - P139

By dnadmin on Sun, 11/06/2022 - 21:42
Document Date
Fri, 04/29/2022 - 14:39
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/04/2022 - 00:00
Page Number
139
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050420…

16,

17,

18.

NONDISCRIMINATION If applicable or required under any federal or state law, statute,
regulation, order, or other requirement, DesignLAB agrees to the following terms.
DesignLAB will not discriminate against any employee or applicant for employment
because of physical or mental handicap in regard to any position for which the employee
or applicant for employment is qualified. DesignLAB agrees to take affirmative action to
employ, advance in employment, or to otherwise treat qualified, handicapped individuals
without discrimination based upon physical or mental handicap in all employment
practices, including but not limited to the following: employment, upgrading, demotion,
transfer, recruitment, advertising, layoff, termination, rates of pay, or other forms of
compensation and selection for training, including apprenticeship.

Without limitation of the foregoing, DesignLAB's attention is directed to “Title
41“Public Contracts and Property Management” C.F.R. Subtitle B “Other Provistons
Relating to Public Contracts” Section 60 “Office of Federal Contract Compliance
Programs, Equal Employment, Department of Labor” which, by this reference, is
incorporated in this contract.

DesignLAB agrees to assist disadvantaged business enterprises in obtaining business
opportunities by identifying and encouraging disadvantaged suppliers, consultants, and sub
consultants to participate to the extent possible, consistent with their qualification, quality
of work, and obligation of DesignLAB under this contract.

In connection with the performance of work under this contract, DesignLAB agrees not to
discriminate against any employee or applicant for employment because of race, creed,
color, national origin, sex, age, or sexual orientation. This agreement includes, but is not
limited to, the following: employment, upgrading, demotion or transfer, recruitment or
recruitment advertising, layoff or termination, rates of pay or other forms of compensation,
and selection for training, including apprenticeship.

DesignLAB agrees, if applicable, to insert these provisions in all subcontracts, except for
subcontracts for standard commercial supplies or raw materials. Any violation of any
applicable provision by DesignLAB shall constitute a material breach of the contract.

ENDORSEMENT DesignLAB shail seal and/or stamp and sign professional documents
including drawings, plans, maps, reports, specifications, and other instruments of service
prepared by DesignLAB or under its direction as required under the laws of the State of
New Hampshire.

ASSIGNMENT, TRANSFER, DELEGATION, OR SUBCONTRACTING DesignLAB shall not
assign, transfer, delegate, or subcontract any rights, obligations, or duties under this
contract without the prior written consent of the City of Nashua. Any such assignment,
transfer, delegation, or subcontracting without the prior written consent of the City of
Nashua is void. Any consent of the City of Nashua to any assignment, transfer, delegation,
or subcontracting shall only apply to the incidents expressed and provided for in the written
consent and shall not be deemed to be a consent to any subsequent assignment, transfer,
delegation, or subcontracting. Any such assignment, transfer, delegation, or subcontract
shall require compliance with or shall incorporate all terms and conditions set forth in this
agreement, including all incorporated Exhibits and

GC 9 of 13

Page Image
Finance Committee - Agenda - 5/4/2022 - P139

Board Of Aldermen - Agenda - 8/9/2022 - P67

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
67
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

Segment 10 — Replace and Widen ADA Ramp Below Librarv

No TTG final engineering required.

Segment 11 — 58-60 Main Street Boardwalk and Ramp

11.1

11.2

11.3

11.4

11.5

Design the final boardwalk bracket connections for the building.

Design the transition corner from the bracketed boardwalk to the parking lot ramp.
Design the ramp boardwalk and supporting piles.

Evaluate riverbank slope protection for erosion and scour.

Prepare final drawings and specifications for City review and approval.

Segment 12 — Bicentennial Park Renovation

12.1

12.2

12.3

12.4

Coordinate and resolve the interface connection between the park and the 4 Water
Street boardwalk with Halvorson/Tighe & Bond.

Design the modified retaining wall and other foundation structures for the park —
4 Water Street interface including consideration of the existing underground
utilities.

Evaluate river erosion and scour potential at the retaining wall interface.

Prepare final design drawings and specifications.

Segment 13 — 4 Water Street Boardwalk

13.1

13.2

13.3

13.4

13.5

13.6

Design the boardwalk river piles and building connections.
Design boardwalk structural details and pile connections.

Coordinate the final design of the expanded boardwalk with Halvorson/Tighe &
Bond where Renaissance Park and the new floating dock gangway ramp meet.

Design the details of the expanded boardwalk section.
Design the new retaining wall and river pile supports for the expanded walkway.

Design the new floating dock river piles.

Final Engineering Design Proposal 05-11-22

4920

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P67

Board Of Aldermen - Agenda - 8/9/2022 - P68

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
68
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

13.7 Design the new floating dock and gangway system including intermediate supports.

13.8 Re-examine the “0.00 ft rise” river model with the final design pile features to
confirm conformance,

13.9 Use the river model to assess pile erosion and scour, ice, and woody/miscellaneous
debris loadings.

13.10 Prepare final design drawings and specifications for City review and approval.

Segment 14 — Renaissance Park Improvements

14.1. Coordinate final park layout with the City and Halvorson/Tighe & Bond to minimize
the length and extent of the river walls and river slope embankment.

14.2. Perform additional river modeling to verify river wall and embankment grading do
not violate the “0.00 ft rise” flood level criteria. Use the river model to determine
velocity, scour and erosion potential as parameters in designing the final
embankment surface treatment(s}.

14.3. Design the structural and geotechnical aspects of the new river retaining wall
including any special support(s) over the existing 30-inch City stormwater drain line.

14.4 Design the geotechnical, hydraulic, and structural elements of the proposed river
embankment.

14.5 Prepare final design plans and specifications for City review and approval.

Segment 14 — Revised Water Street and Factory Street Parking Layout

No TTG final engineering required.

Permitting Support

TTG will provide permitting support to the City in the implementation of permit terms and
conditions within its final engineering design.

ADDITIONAL SERVICES

The following are considered additional services that are not considered final engineering
design; but, will be needed to complete the final engineering phase of this project:

Final Engineering Design Proposal 05-11-22
4920

TURNER
GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P68

Board Of Aldermen - Agenda - 8/9/2022 - P69

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
69
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

A.1___ Geotechnical Analyses & Recommendations

TTG intends to subcontract the geotechnical engineering work to SLR International
(formerly HTE Northeast, Inc.) out of Bedford, NH. TTG has performed many similar
water/land projects with SLR support.

SLR will provide reasonably conservative geotechnical analyses and recommendations for
the TTG final design structures. It is TTG’s understanding that prior to construction, the City
will obtain (at the direction and approval of TTG/SLR) new subsurface (land and water)
borings. Data from the borings will be used to confirm; or adjust SLR foundation
recommendations,

If the TTG designs change, the City will be notified and a scope and budget for any redesigns
provided.

A.2 — Spot Field {Instrument) Surveys

Certain design details (Bicentennial Park — 4 Water Street elevated boardwalk interface,
new retaining wall under the expanded deck where 4 Water Street's elevated boardwalk
meets Renaissance Park/dock gangway, the substation screening foundation, etc.) will
require more “in-situ” ground elevation points and existing structure feature Information.
TTG will be requesting 2 to 3 days of HSI field survey crew time to obtain this information
for TTG.

A.3 — Proiect Progress Meetings

In addition to the design coordination meetings identified in the scope for “basic” final
engineering design services, TTG has estimated 12 project progress meetings with the City
and Its project representatives, to present ongoing design results, discuss budget/schedule
status, and identify potential problems. We expect these meetings would be 1 to 2 hours in
length and involve two TTG project staff to prepare, attend/present, and provide certain
meeting follow-up.

A.4 ~ Construction Manager {CM) Coordination

TTG understands the City plans on utilizing a CM to assist it in implementing the Riverfront
Project. It Is likely the CM will be issuing RFls, Requests for Clarifications, and doing value
engineering assessments of the TTG final engineering design. TTG recognizes that time will
need to be allocated to coordinate with the City CM; but the extent and scope is
undefinable at this time.

Our services for this project will be provided in accordance with the attached “Standard
Conditions for Engagement” dated January 1, 2022.

Final Engineering Design Proposal 05-11-22
4920

TURNER
GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P69

Board Of Aldermen - Agenda - 8/9/2022 - P70

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
70
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

ITEMS NOT INCLUDED

1. More meetings than identified in basic and additional services.

2, Construction drawings and specifications. (Note: At this time the City has not
defined the scope or method of project delivery, or its phasing, which would dictate
the criteria of scope and extent of these construction documents). Segments 3, 4, 6
& 11-14 all other drawings and specs.

3. Changes to the final engineering designs that are a result of issued state, federal or
city permit conditions.

4. RFls as part of any ongoing project permit application process.

5. Coordination with the City CM regarding the scope, fees and budgets, and
scheduling of TTG’s final engineering design.

6. Work currently being performed by others.

FEE

We propose to invoice for our services on an hourly basis per the attached “Standard Fee
Schedule and Payment Terms” dated January 1, 2022. Invoices will be submitted monthly.

A total not-to-exceed budget for the scope of work identified as “basic” final engineering
design services is $286,340. The total allowance estimate for “additional” services to
support the final engineering design is $118,000.

Attachment A is a Fee Summary Sheet line iteming and totaling the fees for “basic” and
“additional” services.

Attachment B is a Fee Breakdown providing labor and expense estimates per the Scope of
Services for the “basic” and “additional” services.

SCHEDULE

To be determined with the City.

Final Engineering Design Proposal 05-11-22
4920

TURNER
GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P70

Board Of Aldermen - Agenda - 8/9/2022 - P71

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
71
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

CLIENT RESPONSIBILITIES

Final Engineering Design Proposal 05-11-22

4920

Owner/Contractor contract documents (except technical documents) and/or
purchase order, in order to solicit for and enter into a construction contract with a
Contractor or Construction Manager.

Solicit, administer, and award bids for construction implementation of this project.

Provide construction administration and supervisions of Contractor or Construction
Manager.

Obtain federal, state, and local permits and approvals necessary for the
implementation of this work.

Pay permit fee(s) for the new boring plan State Wetlands Permit or any other permit
fees that may be required.

Issues dealing with hazardous materials.

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P71

Board Of Aldermen - Agenda - 8/9/2022 - P72

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

CONTRACT FORM

Please sign and return these originals as your acceptance of the above scope and terms,
including noted attachments, and your authorization to proceed. Please also provide a
purchase order or equivalent accounting number, if applicable, at the end of this letter in
order to allow us to proceed.

In the event the City (Client) issues a purchase order or other instrument related to TTG’s
(Consultant’s} Services, it is understood and agreed to that such document is of the Client's
internal accounting purpose only, and shall in no way modify, add to, or delete any of the
terms and conditions of the agreement. If the Client does issue a purchase order or other
similar instrument, it is understood and agreed to that the Consultant shall indicate the
purchase order number on the invoices sent to the Client.

We appreciate the opportunity to present this proposal and look forward to providing
continued assistance to the City with this project. If you have any questions, please do not
hesitate to contact John Lavigne at (603) 228-1122, ext. 149 or Gerard Blanchette at ext.

120.
Sincerely,

THE H.L. TURNER GROUP INC.

Vad. R. lemeaneny fowl Mnckls—

John R. Lavigne, Jr., PE, CFM Gerard R. Blanchette, PE, LEED®AP, NCEES
Lead Civil Engineer President
JRL/sai

Attachments: A~ Fee Summary Sheet
B — Fee Breakdown
C — Standard Fee Schedule & Payment Terms, January 1, 2022

TURNER
GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P72

Board Of Aldermen - Agenda - 8/9/2022 - P73

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
73
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

Attachment A

Fee Summary Sheet

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P73

Board Of Aldermen - Agenda - 8/9/2022 - P74

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
74
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

Attachment A

Fee Summary Sheet
“Basic” and “Additional” Services
Final Engineering Design

Ite Fees
1, Basic Design SErvices........ccsssestsrssercsscssesssnersssessesensssssssetecessceeeseaussansvaneranes $286,340.00

2. Additional Services:

Al

A.2

A.3

AA

Geotechnical Analyses & RecomMendation............cccceesere eee S$ 75,000.00
Spot Fleld SUCVeYS ..........cccsseccsccssenesersecsserersuecusversesensesarenerensaenseeses S$ 12,000.00
Project Progress M@etings...........ccccssessessseeseueneseresesnrsnseceererserss § 16,000.00
CM COOrdination..........cccccccscccerersrscssestscesssnecoerenerseeseertersenrssssens $ 15.000.00

OTA eceerestieatererosscipesectostreneed $404,340.00

Final Engineering Design Proposal 05-11-22

4920

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P74

Board Of Aldermen - Agenda - 8/9/2022 - P75

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
75
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WORK HOURS pos
PM Structural PE Sr PD Te HOURS
Segment 4 - Boardwalk Connector
4,1 - Scour, Debris & Ice Loadings 4 16 2 22
4.2 - Structural Design - Pile, Foundation &
Structural Details ‘ 40 f 2 2 Ze
4.3 - Final Engineering Plans & Specifications 8 50 4 60 4 126
Ea GD ga EB (ny ES] ee ET
TOTAL HOURS 16 90 24 80 8 218
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 16 $ 150.00 $ 2,400.00
Structural Engineer (Structural) 90 S$ 185.00 S$ 16,650.00
Project Engineer (PE) 24 $ 130.00 $ 3,120.00
Sr, Project Designer | (Sr PO} 80 $ 105.00 5 8,400.00
Technical Coordinator (TC} 8 $ 100,00 $ 800.00
218 Total Fully Burdened Labor $ 31,370.00

Geotech Subconsultant $

Expenses

Estimated Direct Costs $

$200

200.00

TOTAL ESTIMATED COST = $ 31,570.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P75

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 196
  • Page 197
  • Page 198
  • Page 199
  • Current page 200
  • Page 201
  • Page 202
  • Page 203
  • Page 204
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact