AMENDED
ORDINANCE
(j)
(k)
(2)
O-18-012
Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250275.
Commercial electrical (including Multi-Family).
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
G)
(k)
(1)
(m)
(n)
Nonrefundable application processing fee: $2530.
Electrical service entrance and service change (per amp): $0.3340.
Temporary service (each): $385045.
Panels and subpanels (each): $6-5025.
Outlets:
[1] For switches, receptacles, and fire and smoke detectors (each):
$0.8895.
[2] For lighting and lighting fixtures, except as otherwise provided
(each four feet of continuous fluorescent lighting shall be deemed a
separate lighting fixture) (each): $0.8895.
[3] For ranges, dryers, and similar heating devices (each): $5598.
[4] For high-intensity lighting and fixtures (each) (250 watt and
above): $910.
Fixed multi-outlet receptacle assemblies (for each six feet): $4596.
Track lighting (each 10 feet): $4506.
Motor control centers (each), automatic transfer switches (each), wiring of
HVAC units (per unit): $285932.
Water heaters (each): $912.
Electric baseboard heat (per unit): $5598.
Buss ducts (each section): $6-5610.
Transformers, generators, motors, x-ray machines (each): $4922.
Paging and sound systems:
[1] Per speaker: $23.
[2] Per console: $4922.
Signs (each): $275032.