AMENDED
ORDINANCE O-18-012
G5) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
@k) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250275.
(2) Commercial plumbing (including Multi-Family).
(a) Nonrefundable application processing fee: $2530.
(b) Per fixture (tub, shower, sink, water closet, lavatory, floor drain, drinking
fountain, urinal, dishwasher, garbage grinder, outside faucet, clothes-
washing machine, washdown station, etc.): $6598.
(c) Pumps and ejectors (each): $275030.
(d) Grease interceptor: $4925.
(e) Water heaters (each): $4218.
(4\(f) Irrigation system (includes backflow preventer): $4415.
4}(g) Backflow preventer (each):
[1} Atmospheric vacuum breakers: $4214.
[2] Pressure vacuum breakers: $4214.
[3] Dual check valve: $4214.
[4] Reduced-pressure principle: $4214.
(bh) Water pipes: (per 100 feet or part thereof): $4215.
(<}(i) Sanitary sewer connection: $4215.
(4(j) Drainage, waste and vent pipes: (per 100 feet or part thereof): $4215.
4)(k) Storm (drain) sewer connection: $4215.
(1) Storm piping: (per 100 feet or part thereof): $4215.
(e}(m) Roof drains (each): $4215.
p(n) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.