(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $5975.
(13) Phased construction (foundation permits, interior demolition permits or shell
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.
(14) Surcharge for permits issued after construction started without a permit: 100% of
applicable fee, but not to exceed $259$275 Residential / $500 Commercial.
(15) Expedite-service fee for special processing and after-hours service: $75 per hour
per staff member, with a minimum of $456200 (sve-heues) for weekends or time
not contiguous with normal work hours.
B. Mechanical permit fee schedule.
(1) Residential mechanical,+nehidine- multifamily (1 & 2 Family and Townhouses).
(a) Nonrefundable application processing fee: $2530.
(b) Delivery system:
[1] Gas supply piping (base fee downstream of meter or regulator set;
test witnessed) (each): $49— 0-99k BTU - $25; 100-199k BTU -
$40; 200k BTU and above - $50 plus $0.22 per 1,000 BTU.
[2] Gas supply outlets (each branch): $3-596.50.
[3] Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6.5015.
(c) Equipment:
[1] Furnace: $38-5040.
[2] _ Water Heater: $15.
f24[3] Refrigeration system piping, coil, or condensing unit: $6-5015.
£314] Boiler, water or steam: $38-5940.
f44[5] Boiler, water or steam, with domestic hot-water generator: $4445.
{54[6] Burner, conversion or replacement, oil or gas: $65015.
f6}[7] Heater, vented or unvented, floor, wall, room or gas log (each):
$6:3025.
FA[8] Dryer, exhaust or ventilation fan er-baseboardteep(each): $36.
f84[9]_ Baseboard loop (each): $10.
(d) Wood or pellet stove and associated chimney: $4940.