Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Minutes - 5/22/2018 - P17

Board Of Aldermen - Minutes - 5/22/2018 - P17

By dnadmin on Sun, 11/06/2022 - 22:21
Document Date
Tue, 05/22/2018 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 05/22/2018 - 00:00
Page Number
17
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__052220…

AMENDED
ORDINANCE O-18-012

(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $5975.

(13) Phased construction (foundation permits, interior demolition permits or shell
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.

(14) Surcharge for permits issued after construction started without a permit: 100% of
applicable fee, but not to exceed $259$275 Residential / $500 Commercial.

(15) Expedite-service fee for special processing and after-hours service: $75 per hour
per staff member, with a minimum of $456200 (sve-heues) for weekends or time
not contiguous with normal work hours.

B. Mechanical permit fee schedule.

(1) Residential mechanical,+nehidine- multifamily (1 & 2 Family and Townhouses).

(a) Nonrefundable application processing fee: $2530.
(b) Delivery system:

[1] Gas supply piping (base fee downstream of meter or regulator set;
test witnessed) (each): $49— 0-99k BTU - $25; 100-199k BTU -
$40; 200k BTU and above - $50 plus $0.22 per 1,000 BTU.

[2] Gas supply outlets (each branch): $3-596.50.

[3] Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6.5015.

(c) Equipment:
[1] Furnace: $38-5040.
[2] _ Water Heater: $15.

f24[3] Refrigeration system piping, coil, or condensing unit: $6-5015.
£314] Boiler, water or steam: $38-5940.

f44[5] Boiler, water or steam, with domestic hot-water generator: $4445.
{54[6] Burner, conversion or replacement, oil or gas: $65015.

f6}[7] Heater, vented or unvented, floor, wall, room or gas log (each):
$6:3025.

FA[8] Dryer, exhaust or ventilation fan er-baseboardteep(each): $36.
f84[9]_ Baseboard loop (each): $10.

(d) Wood or pellet stove and associated chimney: $4940.

Page Image
Board Of Aldermen - Minutes - 5/22/2018 - P17

Footer menu

  • Contact