Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10481 - 10490 of 38765

Finance Committee - Agenda - 11/15/2017 - P175

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
175
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

22x34 SHEET

ae

5 4 5 6 1:0.94612

LE

Z

wn Ww.

Ec

eB |e

° Lu 5

2 a

c ao Su

S ow |<

— > a

a oe Ze

es SO [2

© > 6

s - ee

S me | Se

A“ = o Ca

S Ee Ss
—

st - = ar

a) ~— Ee

z= o 3 <i

= — a

Qa = E O=

ce N = OE

2s o Lu =D

< a“ Oo

sot = ae

oO <@ © — OF

Ss = |r

Tee = “Zz

- 9906 O WO

= G co Oo Oe

LO

OL

£6

Tr

AZ| "=

a oe

tY| =:

ZZ

Oo | &

OD

O} 88

OO}! 5s

SB | 2

Tu

Fa

(FIELD VERIFY)

CLEAN, PREP, AND APPLY
EPOXY BONDING COMPOUND
PRIOR TO PLACING

NON-—SHRINK GROUT EXG CONC EQUIP PAD
TO BE DEMOLISHED

UU

S0001.dwg, Sep 27, 2017 — 3:34pm

| ctu ral\228730

\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\

SAWCUT EXG SLAB
EXG FLOOR SLAB 1 1/2"
REINF NOT SHOWN TOP SLAB EL
E X “] | SEE PLANS
_ 9
&ic
£16
WANA NYXNYA NY XA - a
Y |
YY WYY YYYY 2 Qe
> Lu |
REI IREER RIRER zlal[sls
Ala
< xY
NOTES: a] 2
1. SEE DEMOLITION DRAWINGS FOR LOCATION, QUANTITY, AND APPROXIMATE SIZE OF EXISTING CONCRETE - a
EQUIPMENT PADS TO BE DEMOLISHED. S xlx
=>\/=
2. EXISTING CONCRETE SLAB REINFORCEMENT SHALL NOT BE CUT OR DAMAGED DURING DEMOLITION. IF SLAB a . ”
REINFORCEMENT IS ENCOUNTERED PRIOR TO REACHING THE REQUIRED 1 1/2—INCH DEPTH OF SLAB < | ..
DEMOLITION, IMMEDIATELY TERMINATE SLAB DEMOLITION AT ENCOUNTERED REINFORCEMENT LAYER. a 5 | a
a Zzlz
3. EXISTING SLAB SHALL BE SAWCUT AROUND FULL PERIMETER OF EXISTING CONCRETE PAD WITHOUT o|s
OVERCUTTING CORNERS. ° ul | ae
4. EPOXY BONDING COMPOUND: EPOXY BONDING COMPOUND: CONFORM TO ASTM C881, CONTAIN 100 PERCENT
SOLIDS, AND BE MOISTURE TOLERANT. SIKADUR 32 HI-MOD OR SIKADUR 32 HI-MOD LPL, BY SIKA
CORPORATION; SURE—BOND (J—58, OR J—58 LPL), BY DAYTON SUPERIOR; OR APPROVED EQUAL SHALL BE
PROVIDED.
5. NON-SHRINK GROUT: GROUT SHALL BE NON-METALLIC, CEMENTITIOUS NON—SHRINK GROUT MEETING
ASTM C1107, GRADE C. GROUT SHALL BE FIVE STAR GROUT BY U.S. GROUT COMPANY, CRYSTEX OR PREMIER
BY L&M CONSTRUCTION CHEMICALS, INC., SURE—GRIP HIGH PERFORMANCE GROUT, BY DAYTON SUPERIOR, OR
APPROVED EQUAL.
6. CONTRACTOR SHALL VERIFY NON—SHRINK GROUT PRODUCT IS SUITABLE FOR APPLICATION THICKNESS. EXTEND
NON-SHRINK GROUT PRODUCT WITH PEA GRAVEL PER MANUFACTURER’S INSTALLATION INSTRUCTIONS AS _ 4
REQUIRED FOR APPLICATION THICKNESS. z=
7. APPLY AND FINISH NON—SHRINK GROUT TO MATCH ELEVATION AND TEXTURE OF ADJACENT SLAB SURFACES. - FF
8. IF EXISTING FLOOR SLAB IS PAINTED, CLEAN AREA AND APPLY COLOR MATCHING PAINT SYSTEM EQUAL TO: oO 2
—~
(2) COATS: SHERWIN WILLIAMS "GENERAL POLYMERS 3589 SMOOTH EPOXY FLOOR COATING” CO 5
WW =
boy
FO
vs
LL
/325\ SLAB REPAIR AT PAD DEMO Da
E—XXX SCALE: NTS Oa
\g00/ Ox
Oo
a
24
xc ue <<
2 r
- Eo
< 4 oo
» 2
= z
g <i
Zz ud F
Le F a
Oo oe”
<
F ES
oO =o
LAH
2
=
JOB NO.: 228730
DATE: SEPTEMBER 2017
SCALE: AS NOTED
SHEET: 1 OF 1

Page Image
Finance Committee - Agenda - 11/15/2017 - P175

Finance Committee - Agenda - 11/15/2017 - P176

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
176
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

UW

22x34 SHEET
1:0.94614

SO0002.dwg, Sep 27, 2017 — 3:35pm

| ucturel\ 228730

\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\

| EQUIPMENT-SIZE PER VENDOR

4” MIN
APPLY EPOXY BONDING ANCHOR ROD LOCATION, | (UNO)
COMPOUND TO EXISTING SIZE, AND QUANTITY PER
CONCRETE VENDOR’S EQUIPMENT
] DRAWINGS
/
3/4” CHAMFER [- #4 @ 12” OCEW 4° (TYP) #4 @ 12” OC DOWELS
ALL SIDES . DRILL & EPOXY W/
- ] 1 1/2” CLR FI 4” MIN EMBEDMENT
° J
° ° ° ° ° » FLOOR SLAB
t 2° GlR , SEE PLANS
FLOOR SLAB REINF
NOT SHOWN | TOP SLAB EL
NY | | SEE PLANS
NY QS
LY ROMA LYROAA OMYYAA
YOY SSAYOY WOY’AY
RR RR RY

NOTES:

1. SEE ELECTRICAL DRAWINGS FOR EQUIPMENT LOCATIONS, QUANTITIES, AND LAYOUT

TOP OF PAD SHALL BE LEVEL WITHIN 1/8—INCH

on FP YF WN

REBAR: ASTM A615, GRADE 60 REINFORCING BARS

CONCRETE: 3,000 PSI CONCRETE WITH MAXIMUM W/C RATIO = 0.55

ELECTRICAL EQUIPMENT PADS SHALL BE 4” THICK, UNLESS NOTED OTHERWISE

/322\ INTERIOR EQUIP PAD

\E—XXX/ SCALE: NTS

PAD SHALL PROJECT A MINIMUM OF 4—INCH BEYOND MECHANICAL EQUIPMENT FOOTPRINT.

PROVIDE SACK—RUBBED FINISH TO ALL EXPOSED SIDES OF EQUIPMENT PAD AND A TROWEL FINISH TO THE TOP SURFACE

PRIOR TO EQUIPMENT INSTALLATION, APPLY CURE AND SEAL COMPOUND TO EQUIPMENT PAD SURFACES

800.426.4262 | www.woodardcurran.com
COMMITMENT & INTEGRITY DRIVE RESULTS

41 Hutchins Drive
Portland, Maine 04102

WOODARD
&CURRAN

THIS DOCUMENT IS THE PROPERTY OF WOODARD & CURRAN INC. AND ITS CLIENT.
REPRODUCTION OR MODIFICATION WITHOUT WRITTEN PERMISSION IS PROHIBITED.

a
j ~~

#
#
#
#
#
9/28/17
DATE

CHECKED BY: RUD
228730_S0002.DWG

RELEASED FOR BID ADDENDUM NO.3
DESCRIPTION

DESIGNED BY: SMH

#
#
#
it
#
0
REV

SMH

DRAWN BY:

CONCRETE EQUIPMENT PAD
INSTALLATION DETAILS

CITY OF NASHUA, NH
WASTEWATER TREATMENT FACILITY
SCADA SYSTEM UPGRADE

JOB NO.: 228730

DATE: SEPTEMBER 2017

SCALE: AS NOTED

SHEET: 1 OF 1

9-0002

ue

Page Image
Finance Committee - Agenda - 11/15/2017 - P176

Finance Committee - Agenda - 11/15/2017 - P177

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
177
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

A-4.1

BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, ELECTRICAL INSTALLATIONS,
INC, -
397 Whittier Highway, Moultonboro, NH 03254 ; __ as Principal, and

NORTH AMERICAN SPECIALTY INSURANCE COMPANY, AGENCY: P.O. Box as Surety, are hereby
$11, Concord, NH

held and firmly bound unto CITY OF NASHUA, DIVISION OF PUBLIC WORKS, 9 as OWNER
Riverside Street, Nashua, NH 03060

In the penal sum of FIVE PERCENT OF AMOUNT BID (5% OF AMOUNT BID)
for the payment of which, well and truly to be made, we hereby jointly and severally bind

ourselves, successors and assigns.

Signed, this 10th day of October, 2017 —

The Condition of the above obligation is such that whereas the Principal has submitted to

CITY OF NASHUA, DIVISION OF PUBLIC WORKS
A certain BID attached hereto and hereby made a part hereof to enter into a contract in writing for

the WASTEWATER TREATMENT FACILITY SCADA SYSTEM UPGRADES PROJECT

NOW THEREFORE,

(a) If said BID shall be rejected or

(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form
of Contract attached hereto (Properly completed in accordance with said BID) and shall
furnish a BOND for faithful performance of said contract, and for the payment of all persons
performing labor or furnishing materials in connection therewith, and shall in all other-respects
perform the agreement created by the acceptance of said BID, then this obligation shall be
void, otherwise, the same shall remain in force and effect; it being expressly understood and
agreed that the liability of the Surety for any and all claims hereunder shall, in no event,

exceed the penal amount of this obligation as herein stated.

Page Image
Finance Committee - Agenda - 11/15/2017 - P177

Board Of Aldermen - Minutes - 9/27/2016 - P47

By dnadmin on Sun, 11/06/2022 - 21:33
Document Date
Tue, 09/27/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 09/27/2016 - 00:00
Page Number
47
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__092720…

WELCOMING
AMERICA

COMMITMENT TO PARTICIPATE IN THE
WELCOMING CITIES & COUNTIES COHORT

As representatives of local government, we recognize that cities and communities that proactively welcome
newcomers and take steps to ensure their successful integration will be strategically positioned as globally
competitive 21* century leaders.

We therefore resolve to participate in the Welcoming Cities and Counties Cohort and commit to taking the
following initial steps toward creating an environment that is receptive to immigrants, and that unlocks the full
potential of all members of the community:

¢ Advance a municipal or county-level proclamation or resolution declaring our locality to be a

welcoming one

* Find ways to institutionalize welcoming efforts through the adoption of policies and practices that

promote inclusion within local government and the broader community
¢ Join a cohort of cities and counties that have pledged to become more welcoming
¢ Appoint at least one key municipal staff contact for the project

e Participate in three conference calls each year to share and learn from promising practices from
other Welcoming Cities and Counties

* Participate in an annual in-person meeting with other Welcoming Cities and Counties (dependent

upon available travel resources)

City or County Name: _ Date:
Agency:
Representative Name: Signature:

Executive Name: Signature:

Page Image
Board Of Aldermen - Minutes - 9/27/2016 - P47

Finance Committee - Agenda - 4/6/2022 - P212

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
212
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

E. ENGINEER’s Review
1. ENGINEER will timely review and approve Shop Drawings and Samples in accordance with the schedule of Shop
Drawings and Sample submittals acceptable to ENGINEER. ENGINEER’s review and approval will be only to
determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to
the information given in the Contract Documents and be compatible with the design concept of the completed
Project as a functioning whole as indicated by the Contract Documents.

2.ENGINEER’s review and approval will not extend to means, methods, techniques, sequences, or procedures of
construction (except where a particular means, method, technique, sequence, or procedure of construction is
specifically and expressly called for the Contract Documents) or to safety precautions or programs incident
thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the
item functions.

3. ENGINEER’s review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility
for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called
ENGINEER’s attention to each such variation at the time of each submittal as required by paragraph 6.17.D.3 and
ENGINEER has given written approval of each such variation by specific written notation thereof incorporated in or
accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CONTRACTOR
from responsibility for complying with the requirements of paragraph 6.17.D.1.

F. Resubmittal Procedures
1. CONTRACTOR shall make corrections required by ENGINEER and shall return the required number of corrected

copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct
specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals.

6.18 Continuing the Work
A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disoutes or disagreements

with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as
permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing.

6.19 CONTRACTOR’s General Warranty and Guarantee
A. CONTRACTOR warrants and guarantees to OWNER, ENGINEER, and ENGINEER’s Consultants that all Work will be in
accordance with the Contract Documents and will not be defective. CONTRACTOR’s warranty and guarantee

hereunder excludes defects or damage caused by:

1. Abuse, modification, or improper maintenance or operation by persons other than CONTRACTOR,
Subcontractors, Suppliers, or any other individual or entity for whom CONTRACTOR is responsible; or

2. Normal wear and tear under normal usage.
B. CONTRACTOR’s obligation to perform and complete the Work in accordance with the Contract Documents shall be
absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract
Documents or a release of CONTRACTOR’s obligation to perform the Work in accordance with the Contract
Documents:

1. Observations by ENGINEER;

2. Recommendation by ENGINEER or payment by OWNER OF ANY PROGRESS OR FINAL PAYMENT;

GC -310f55

Page Image
Finance Committee - Agenda - 4/6/2022 - P212

Finance Committee - Agenda - 11/15/2017 - P178

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
178
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and
its BOND shall be in no way impaired or affected by any extension of the time within which the
OWNER may accept such BID; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals and
such of them as are corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set.forth above.

ELECTRICAL INSTALLATIONS, INC,

Principal

By: Drhal Mh. Gof — |

Darlene M. Fitz, Pfesident

NORTH AMERICAN SPECIALTY INSURANCE COMPANY

A Surety
By: (| LA

~ Paula J. Carfthra, Attorney-in-Fact

IMPORTANT ~ Surety companies executing BONDS must appear on the Treasury Department’s
most current list (Circular 570 as amended) and be authorized to transact business in the State of

where the project is located.

Page Image
Finance Committee - Agenda - 11/15/2017 - P178

Finance Committee - Agenda - 11/15/2017 - P179

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
179
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

NAS SURETY GROUP

NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY

WESTPORT INSURANCE CORPORATION
GENERAL POWER OF ATTORNEY

KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire and Washington International Insurance
Company a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg,
Illinois, and Westport Insurance Corporation, organized under the laws of the State of Missouri, and having its principal office in the City of Overland
Park, Kansas each does hereby make, constitute and appoint: .
DANIEL E. CHURCH, PAULA J. CANTARA, WILLIAM VER PLANCK, CHRISTINE HOSMER, JOHN M. HARBOTTLE, GARY P. LAPIERRE,

BRUCE H, LANGLEY, MICHAEL P. O'BRIEN, RYAN M. STEVENS, and MATTHEW R. BLAISDELL JOINTLY OR SEVERALLY

Its true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the

amount of: ONE HUNDRED TWENTY FIVE MILLION ($125,000,000.00) DOLLARS

This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held.
on March 24, 2000 and Westport Insurance Corporation by written consent of its Executive Committee dated July 18, 2011.

“RESOLVED, that any two of the President, any Senior Vice President, any Vice President, any Assistant Vice President,
the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is

FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached.”

y i ns
Steven PY Anderson, Senior Vice President of Washington rmational Insurance Company
& Senior Vice President of North American Specialty Insurance Company
& Senior Vice President of Westport Insurance Corporation

By Ht
Mike A, Ito, Senior Vice President of Washi International Insurance Company

& Senior Vice President of North American Specialty Insurance Company
& Senior Vice President of Westport Insurance Corporation

IN WITNESS WHEREOF, North American Specialty Insurance Company, Washington International Insurance Company and Westport
Insurance Corporation have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this
this 13th day of July ,20_16

North American Specialty Insurance Company

Washington International Insurance Company
Westport Insurance Corporation

State of Illinois .
County of Cook 88:

On this 13th day of July ; 20_16, before me, a Notary Public personally appeared Steven P. Anderson _, Senior Vice President of

Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of
Westport Insurance Corporation and_Michael A. Ito Senior Vice President of Washington International Insurance Company and Senior Vice President
of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation, personally known to me, who

being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the
voluntary act and deed of their respective companies. ard

OFFICIAL SEAL
M KENNY 08 ,
‘NOTARY PUBLIC, STATE OF ILL a
MY COMMISSION EXPIRES 12/04/2017; M. Kenny, Notary Public {
I, Jeffrey Goldberg _, the duly elected Vice President and Assistant Secretary of North American Specialty Insurance Company, Washington

International Insurance Company and Westport Insurance Corporation do hereby certify that the above and foregoing is a true and correct copy ofa
Power of Attorney given by said North American Specialty Insurance Company, Washington International Insurance Company and Westport Insurance

Corporation which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this ] Otay of { ctober , 20 | / :

Jb

Jeffrey Goldberg, Vice President & Assistant Secretary of Washington International Insurance Company &
North American Specialty Insurance Company & Vice President & Assistant Secretary of Westport Insurance Corporation

Page Image
Finance Committee - Agenda - 11/15/2017 - P179

Finance Committee - Agenda - 11/15/2017 - P180

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
180
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

B-1.1

NOTICE OF AWARD
DATED:

TO:

(Bidder)
ADDRESS:
OWNER’S CONTRACT NO. : IFB1094-100217
PROJECT: Wastewater Treatment Facility SCADA System Upgrades

(Insert name of Contract as it appears in the Bidding Document)
You are notified that your Bid dated for the above Contract has been

considered. You are the apparent Successful Bidder and have been awarded a contract for

The SCADA System Upgrade project consists of upgrades to improve; operational efficiency, data
acquisition, reporting functionality, and supportability of technology. Outdated control panels and / or
components will be replaced with control panels and / or components equipped with state-of-the-art
PLCs networked to SCADA computers. Due to the size and complexity of the project, it will be

executed in a phased approach to minimize disruption to operations.
(Indicate total Work, alternatives or sections or Work awarded)

The Contract Price of your contract is
($ )

(5) Copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of
Award. The same number of sets of the Drawings will be delivered separately or otherwise made
available to you immediately.

You must comply with the following conditions precedent within ten days of receiving this Notice of
Award.

1. You must deliver to the OWNER all of the fully executed counterparts of the Agreement
including all the Contract Documents. This includes the sets of Drawings. Each of the Contract

Documents must bear your signature on (the cover) (every) page.

2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in
the Information for Bidders and General Conditions.

3. (List other conditions precedents).

Page Image
Finance Committee - Agenda - 11/15/2017 - P180

Finance Committee - Agenda - 11/15/2017 - P181

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
181
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

B-1.2

Failure to comply with these conditions within the time specified will entitle OWNER to consider your
bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.

Within ten days after receipt of acceptable performance BOND, payment BOND and agreement signed
by the party to whom the Agreement was awarded, the OWNER will return to you one fully signed
counterpart of the Agreement with the Contract Documents attached.

City of Nashua, New Hampshire
(OWNER)

(AUTHORIZED SIGNATURE)

(TITLE)

ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF AWARD is hereby acknowledged

By

The day of 20

By

Title

Copy to ENGINEER
(Use Certified Mail, Return Receipt Requested)

Notice of Award

Page Image
Finance Committee - Agenda - 11/15/2017 - P181

Finance Committee - Agenda - 11/15/2017 - P182

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
182
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

B. CONTRACT

September 2017

Page Image
Finance Committee - Agenda - 11/15/2017 - P182

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1045
  • Page 1046
  • Page 1047
  • Page 1048
  • Current page 1049
  • Page 1050
  • Page 1051
  • Page 1052
  • Page 1053
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact