Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 37331 - 37340 of 38765

Finance Committee - Agenda - 3/17/2021 - P555

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
555
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 7 of 8
January 2021

3066.21

3.3

A.

PIPE TESTING

CONTRACTOR shall perform a pneumatic test on solid pipe and fittings greater
than 50 ft in length after placement in the trench, in accordance with the
Manufacturer’s recommendations.

Pipes shall be pressure tested in presence of ENGINEER. Provide a minimum 7
days notice to ENGINEER before performing test.

Pneumatic testing shall be performed as follows:

1. The test period at the test pressure shall last no less than 10 minutes.

2. Provide all necessary connections, bulkheads, flanges, bracing, and
blocking, as well as all required test equipment.

3. Test pressure gauges:

a. For GCCS and condensate main pipes, the test pressure gauge shall
have a maximum range of no more than 20 psig, with minor
gradations no greater than 0.1 psig.

b. For the compressed air pipe, the test pressure gauge shall have a
maximum range of no more than 200 psig, with minor gradations no
greater than 1 psig.

4. Pipe to be tested shall be exposed in the trench, except bends, reduced
pressure rated fittings and components, which shall be buried or
restrained. Flange connections shall be visible to check for leaks.

5. Test pressure:

a. For GCCS and condensate main pipes, the test pressure shall be 10
psig.

b. For the compressed air pipe, the test pressure shall be 75 psig.

6. Test shall be accepted if the pressure drop over 10 minutes is less than 5
percent of the pressure at the beginning of the test period.

Test Report

1. ENGINEER shall prepare and submit to OWNER a test report using the

attached forms for each pipe system tested. Include following information
in test report.

Date of test.

Description and identification of pipe system tested.
Type of test performed.

Test fluid.

Test pressure.

Results of test.

Type and location of leaks detected.

Corrective action taken to repair leaks.

Results of retesting.

Name of person performing test.

rpg me ao oD

[END OF SECTION 15210]

P:\3000s\3066.17\Source Files\2019 Gas Project\Tech Specs\Division 15 Specifications\Section 15210 HDPE.doc

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P555

Finance Committee - Agenda - 3/17/2021 - P556

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
556
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances

January 2021

Page 8 of 8
3066.21

ATTACHMENT 1 TO SECTION 15210
PIPE PRESSURE AIR TEST LoG

Project No.:
Project Name:
SANBORN |||] HEAD —
Project Location:
Weather:
Contractor: Test No.:

Sanborn Head Personnel:

Person/Company Performing the Test:

Date of Test: Time of Test: Finish:
Pipe Length: ~ ft. ripe Diameter: Pipe Material: Pipe SDR/Sch.:
Rated Working Pressure: Test Pressure: psi
Location/ designation of pipe tested:
t T P; Pe
Time Pipe Temperature Pressure Gauge Reading Pressure Drop
(min.) (°C) (psig) (%)
0
5
10
15
30
60
Pass Fail Retest? Yes No

Description of leaks and repairs of retested pipe segments:

P.-P,
P. = Percent Pressure Drop > x 100

oO

P, = Initial Pressure Gauge Reading

P, = Pressure Gauge Reading at Time t

Comments:

Signature:

P:\3000s\3066.21\ Source Files\Tech Specs\ Division 15 Specifications\Section 15210 HDPE.doc

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P556

Finance Committee - Agenda - 3/17/2021 - P557

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
557
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

SECTION 15212

POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS

PART 1 - GENERAL

1.1 SCOPE OF WORK

A.

Supply polyvinyl! chloride (PVC) Schedule 80 pipe and fittings as shown on the
Drawings.

1.2 SUBMITTALS

A.

CONTRACTOR shall submit to ENGINEER manufacturer’s technical product data
and installation instructions for PVC pipe and fittings.

PART 2 - PRODUCTS

2.1 PIPE AND FITTINGS

A.

Pipe and fittings shall be manufactured from a PVC compound which meets the
requirements of Cell Classification 12454-B polyvinyl chloride as outlined in
ASTM D1784. Pipe and fittings materials shall be specially formulated with
sufficient ultraviolet screeners to provide for longer term outdoor exposure with
no deleterious effects.

PVC pipe used in the construction of landfill gas extraction well shall meet the
requirements of ASTM D1784 and ASTM D1785 for Schedule 80 PVC pipe.

PVC fittings used in the construction of landfill gas extraction well shall meet the
requirements of ASTM D2464 and ASTM D2467.

All PVC cements shall meet the requirements of ASTM D2564 for solvent
cemented PVC joints.

Clean rework or recycle material generated by the manufacturer’s own
production may be used so long as the pipe or fittings produced meet all the
requirements of this Section.

Fittings shall be industrial, heavy duty, hub style.

Socket fittings shall be pressure rated the same as the corresponding size pipe

prescribed by ASTM D1785. Threaded fittings shall be pressure rated to at least
50 percent of the rating for socket fittings.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P557

Finance Committee - Agenda - 3/17/2021 - P558

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
558
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 2 of 3
January 2021 3066.21

PART 3 - EXECUTION
3.1 PVC PIPE HANDLING
A. PVC pipe and pipe fittings shall be handled carefully in loading and unloading.
They shall be lifted by hoists and lowered on skidways in such a manner as to
avoid shock. Derricks, ropes, or other suitable equipment shall be used for
lowering the pipe into well borings. Pipe and pipe fittings shall not be dropped
or dumped.

3.2 PVC PIPE INSTALLATION

A. PVC pipe installation shall conform to the requirements of this Section, the
Manufacturer’s recommendations, and as outlined in ASTM D2774V.

3.3. JOINING OF PVC PIPES
A. Pipes shall be joined in accordance with ASTM D2855.

B. All pipe shall be inspected for cuts, scratches, or other damages prior to
installation. Pipe with imperfections shall not be used.

C. All burrs, chips, etc., shall be removed from pipe interior and exterior.

D. All loose dirt and moisture shall be wiped from the interior and exterior of the
pipe end and the interior of the fitting.

E. All pipe cuts shall be square and perpendicular to the center line of pipe.

F. Pipe ends shall be beveled prior to applying primer and solvent cement so that
the cement does not get wiped off during insertion into the fitting socket.

G. A coating of CPS primer, as recommended by pipe supplier, shall be applied to
the entire interior surface of the fitting socket, and to an equivalent area on the
exterior of the pipe prior to applying solvent cement.

H. The solvent cement shall comply with the requirements of ASTM D2564 and
shall be applied in strict accordance with the Manufacturer’s specifications.

]. Pipe shall not be primed or solvent welded when it is raining, or when

atmospheric temperature is below 40°F, or above 90°F when under direct
exposure to the sun.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P558

Finance Committee - Agenda - 3/17/2021 - P559

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
559
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 3 of 3
January 2021 3066.21

J. After solvent welding, the pipe shall remain undisturbed until cement has
reached initial set. As a guideline for joint setting time, use 1 hour for ambient
temperatures between 60 and 100°F, or 2 hours when ambient temperature is
between 40 and 60°F.

K. Pipe and pipe fittings shall be selected so that there will be as small a deviation

as possible at the joints, and so that inverts present a smooth surface. Pipe and
fittings that do not fit together to form a tight fitting shall be rejected.

[END OF SECTION 15212]

P:\3000s\3066.21\Source Files\Tech Specs\Division 15 Specifications\Section 15212 PVC.doc

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P559

Finance Committee - Agenda - 3/17/2021 - P560

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
560
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

PREPARED FOR:

CONCRETE BLOCK WALL CORRECTIVE ACTION

FOUR HILLS LANDFILL
NASHUA, NEW HAMPSHIRE
DES-SW-SP-95-002
JANUARY 2021

EXHIBIT C

SHEET INDEX

SHEET 1 EXISTING CONDITIONS PLAN

SHEET 2 PROPOSED WEST WALL CORRECTIVE ACTION PLAN
SHEET 3 PROPOSED EAST WALL CORRECTIVE ACTION PLAN
SHEETS 4-6 DETAILS

FROM: USGS TOPOGRAPHIC MAP- NASHUA, NEWHAMPSHIRE (2003)

LOCUS PLAN

SCALE: 1"=1000'

CITY OF NASHUA

FOUR HILLS LANDFILL

NASHUA, NEW HAMPSHIRE

PREPARED BY:

SANBORN HEAD

20 FOUNDRY STREET, CONCORD, NEW HAMPSHIRE 03301
(603) 229-1900 FAX (603) 229-1919

PROJ.#: 3066.21 "CONCRETE BLOCK WALL CORRECTIVE ACTION, FOUR HILLS LANDFILL, NASHUA, NEWHAMPSHIRE" DATED JANUARY 2021

Page Image
Finance Committee - Agenda - 3/17/2021 - P560

Finance Committee - Agenda - 3/17/2021 - P561

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
561
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Z
é
i
5
zg

=o
TO LANDFILL GAS LPs

O ENERGY n=
IT
£

= —_ SSS VALVE CLOSE! \
y a HO1G—— yp HOT
io 20 Fe a 4
= 5
7 ie ee = a Saga —
[ ro = bo ee
%,
ay 24
1 hye 3 = otf ae
_ aan t—-—-$--3--Lo . : a=
= S ‘ % vo08
\ 5 \ Kors 004 y Ho:
il) nn) ACCESS ROAD t oie. a Fo AS
| a0 Sod % ioe HOE
1] hoos & ‘vo02 ! pio ae voor
— = 6
I! i ear = gE a
| \ ont ae Hoss 0h orgs
| 81] \ go = ont —— ae
| i £ 260 MBS HO 0, - = ab = V1 7(DVY).
4 peddle LU {fg Hot oe gods:
PO * = ==) Le
| % we re HOSE os gas 4,
YOST RD) S28 = -
I 040, 01 — =2_ >
| g oS
I APPROXIMATE COMMAS
| LIMITS OF <i sy Es
I ASBESTOS
i Ho08 bot DISPOSAL
— HO
vn
&
HORN
Ho29! Kc VOosRiDW he, i
SITY TAN osiiars Hogg
a 042)

a

7 = > WEST BERM ROAD ~
= — oh
[7 =

LEGEND.
240 10-FOOT CONTOUR
2.FOOT CONTOUR
------- 500-FOOT RESIDENCE SETBACK
meme ANCHOR TRENCH
22 —_LANDFILL GAS CONVEYANCE PIPE
Hos2 LANDFILL GAS COLLECTION TRENCH
SSS S——= PERFORATED PIPE)
032
= LANDFILL GAS SURFACE COLLECTOR
42

ROAD CROSSING PIPE SLEEVE

APPROXIMATE AREA OF ASBESTOS
CONTAMINATED MATERIAL

RIP RAP

APPROXIMATE AREA OF EXISTING
SURFACE COLLECTION LAYER

VAR
LANDFILL GAS EXTRACTION WELL

Vo21(DW) LANDFILL GAS EXTRACTION WELL
WITH DEWATERING PUMP (DW)
Pros

REMOTE LFG EXTRACTION WELL
(WELLHEAD LOCATED ELSEWHERE)

@ WELLHEAD
> VALVE
° VERTICAL RISER
—— Fil —— _ 8° DEWATERING CONDENSATE MAIN

2"@ COMPRESSED AIR LINE

————— ——12'8— Sh =————
HO ee gk

aoe.

8° HEADER
DECOMMISSIONEL
YANUARY 2015,

NOTES:

4. EXISTING TOPOGRAPHY AND SITE FEATURES ARE BASED ON GROUND FIELD SURVEY
PERFORMED BY WSP USA INC. (WSP) OF MERRIMACK, NEWHAMPSHIRE ON JULY 28,
AUGUST 5, AND AUGUST 10,2020.

HORIZONTAL DATUM NAD83 (2001)
HORIZONTAL PROJECTION: NH STATE PLANE
VERTICAL DATUM: VD 26

2. THE EXISTING LANDFILL GAS EXTRACTION SYSTEM INFRASTRUCTURE SHOWN IS
BASED ON:

A. AS-BUILT SURVEY INFORMATION PREPARED BY OTHERS; AND

B. FIELD MODIFICATIONS TO THE LFG SYSTEM COMMUNICATED TO SANBORN HEAD
BY THE CITY OF NASHUA,

3. THE $00 FOOT RESIDENCE SETBACK LINE SHOWN HEREON WAS TAKEN FROM A PLAN
ENTITLED "FOUR HILLS LANDFILL, CITY OF NASHUA, NEWHAMPSHIRE, OVERALL SITE
PLAN" PREPARED BY CMA ENGINEERS, DATED OCTOBER 2008.

4. ACTUAL LOCATIONS OF INDIVIDIUAL FEATURES MAY BE DIFFERENT THAN SHOWN.

5. _ LIMITS OF ASBESTOS DISPOSAL WERE PROVIDED BY THE CITY OF NASHUA AND
SHOULD BE CONSIDERED APPROXIMATE.

“x
OTO774

\

ae “ ij IN, »

Mos>

ord

Ce / SOK, So N
S ys ee
Yo UZPHASE Iho
4 STAGE II
Bi / g y

PHASE III

SANBORN |

GRAPHICAL SCALE

HEAD) =

420

CONCRETE BLOCK WALL CORRECTIVE ACTION PROJECT NUMBER:
DRAWN BY: O. HERNANDEZ CITY OF NASHUA
DESIGNED BY: O. HERNANDEZ FOUR HILLS LANDFILL 3066.21
D BY: E. STEINHAUSER NASHUA, NEW HAMPSHIRE
PROJECTMGR: R. CLAY SHEET NUMBER:
Pic) E, STEINHAUSER EXISTING CONDITIONS PLAN 1OF6
DATE: JANUARY 2021
TO. OnE DESORPTION m7

Page Image
Finance Committee - Agenda - 3/17/2021 - P561

Finance Committee - Agenda - 3/17/2021 - P562

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
562
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

3
2
2

9 2001 SANDOR, HEAD & ASSDINTES. MB

Or a> - t 4%, '
Zi a a LI
gy 4 =|
f s | O51
we)
. “8 AN a
MJ APPROXIMATE LIMITS 0? ™ x Sa ho,
OF ASBESTOS DISPOSAL wo he N oo { ~~
- y Rus SoS
BRS a PHASE | e shoes | Pe) “Ra foe>
@ = és 82
TSN, S be
N ee Nae WY & oh PHASE Ie PHASE il
‘ 07 oe
cL 42 SOY OOo s ~ » ll
~~4.-- £8 4
Or LHS 7, peso 625. 4 “Ss 2 STAG E
of is ~ OY ° 6"S 22 LEGEND (PROPOSED):
‘ \ Ses Broren rN (REMOTE \ 5 8's. — 6" LANDFILL GAS (LFG} CONVEYANCE PIPE
\ Ew {SAS 9 & L A. O53 A / ee o 5 5 ee 9g AGL = =— (SIZE AND ote GIRESTION)
VV Bs: x " — : mi _ N. N » ~ —— AIR —— 2" COMPRESSED AIRLINE
Oe = = f |.
8 TS VERTICAL LF 6 == rex TURED DPS Ne? ; eo) 3"@ DEWATERING CONDENSATE MAIN
OY iS FO TRACTION oP = in GEOMEMBRANE . — ®
f a 2 & ee é REMOTE WELLHEAD
_ Kee <o Is e - a
CONDENSATE TRAPS > 4 t— vost
NEW, ° vo29 Go Ne yos0f. 031 vo32 vo33 aBeus 034 036 On Seatac
~ ® CONDENSATE TRAP
—-
_ Scere 8 e Te t - ——— 40-mil THICK TEXTURED
“7 6 S — (1? 2.60 SO. HDPE GEOMEMBRANE
atlas OF — —aeeciien
c eye f ee sera
DRAINTUBE™ NY COLLECTION LAYER
500-FOOT RESIDENCE RELOCATE EXISTING WELLHEAD CRATE” aN
SETBACK = "DTO7TA" UPSLOPE coecrion Ca J 1
\ NL LAER SS]
ror) ! |
\ vt : I NOTES:
GRAPHICAL SCALE PLAN |. REFER TO SHEET 1 FOR ADDITIONAL NOTES AND

ELEVATION

2. THIS PLAN ILLUSTRATES THE PROPOSED
MODIFICATIONS TO THE LANDFILL GAS SYSTEM. ACTUAL
LOCATION OF WELLS, PIPE, AND VALVES MAY CHANGE
DEPENDING ON SITE CONDITIONS AND CONSTRAINTS
ENCOUNTERED DURING CONSTRUCTION.

3. CONTRACTOR SHALL PLAN TO TEMPORARILY SHUT OFF
GAS FLOW USING EXISTING CONTROL VALVES WHEN
MAKING CONNECTIONS TO EXISTING LFG PIPES, AND
SHALL NOTIFY CITY REPRESENTATIVES AS TO WHEN
SECTIONS OF THE EXISTING GAS SYSTEM WILL BE
TEMPORARILY SHUT OFF.

4. CONTRACTOR SHALL PLAN TO TEMPORARILY SHUT OFF
THE COMPRESSED AIR LINE USING EXISTING SHUT-OFF
VALVES AND RELEASE COMPRESSED AIR PRIOR TO
MAKING CONNECTIONS TO EXISTING COMPRESSED AIR
LINES.

2400

VERTICAL SCALE

oO 40
HORIZONTAL SCALE

8. CONTRACTOR SHALL PLAN TO TEMPORARILY SHUT OFF
UPGRADIENT DEWATERING PUMPS WHEN MAKING.
CONNECTIONS TO CONDENSATE MAINS.

SOLID LANDFILL GAS CONVEYANCE PIPE SHALL BE
INSTALLED AT A MINIMUM SLOPE OF § PERCENT.

ELEVATION

=o
COMPACTED SOIL FOUNDATION UNDER WALL
(ABOVE LINER SAND)

4450

STATION
EXISTING CONCRETE BLOCK WALL PROFILE

(FOR INFORMATION ONLY)

= EXISTING CONCRETE BLOCK WALL

SANBORN

SCALE: AS NOTED

|| wea

eT DRAWNEY R.CLAY CONCRETE BLOCK WALL CORRECTIVE ACTION | provect NuNeER
DESIGNED BY: R. CLAY cl OF NASHUA
: FOUR HILLS LANDFILL 3066.21
D BY: E. STEINHAUSER NASHUA, NEW HAMPSHIRE
eae ee eTEWHAUSER PROPOSED WEST WALL SHEET NUMER
DATE: JANUARY 2021 CORRECTIVE ACTION PLAN 2 OF 6

Page Image
Finance Committee - Agenda - 3/17/2021 - P562

Finance Committee - Agenda - 3/17/2021 - P563

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
563
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

NOTE:

4. REFER TO SHEET 1 FOR ADDITIONAL NOTES AND LEGEND. START OF EXISTING (©
CONCRETE BLOCK WALL

a —_ = :
_
LEGEND (PROPOSED): a
2 LANDFILL GAS (LFG) CONVEYANCE PIPE SS ~
= (SIZE AND SLOPE DIRECTION) <<) s es A ~ ~
3 Ef LAYER
< -

—— AIR —— 2"@ COMPRESSED AIR LINE ~S~ I ~ ~ ~
3"@ DEWATERING CONDENSATE MAIN ROTOR KELL (.2\ ee
@ REMOTE WELLHEAD SK S ~ ~
031 VERTICAL LFG EXTRACTION WELL
WITH DEWATERING PUMP 40 miTHICK
TEXTURED HDPE
40-mil THICK TEXTURED HDPE GEOMEMBRANE GEOMEMBRANE OY
: ~: ae ao
ou i 7 NG
DRAINTUBE™ SURFACE COLLECTION LAYER Vy SSIS , I
w x fe ye e 30} — I
Ys he >
a“ Li, po = sof aa — ey a !
7Oo™
7 Os f J 2
na
ite
st fQ2) I
A .
wR ry Ce
Oe ry CONDENSATE
ae) TRAP We
PHASE Il PTA
FD crue seve een
I WELLHEAD AND TRAP. SLEEVE
TO BE PROVIDED BY CITY

STAGE Il =
A

!
il
er <= REMOTE WELLHEAD {2 ay PHASE il
RS FP in
fy =. CONNECT TO AIRFM (5X
AT EXISTING WELL on Z
BS. Leg / ek Hos0% PAM

ee

40 20! 40! 80"
369 ator posts moat atts posts ------ — 360
i i i i i i i i
wo Po bo bo Po bo bo | 540
Tr 1 T rT 1 T Tr 1
. | | | | FUTURE FINAL GRADE | | |
i sip 4{------ 4------ [__ (FORREFERENCE) Vp 300
i i i i
a 300 , a . ee +o TOP OF CONCRETE BLOCKWALL 300
nh EXISTING GRADE (AUGUST 2020)
i Zl x ee eee | 580 Z
6 1 §
e e
| 200 | — — eter Of EL J) x60
> | >
lu | lw
Da) 280 See 240
BOTTOM OF EXISTING |
I I | CONCRETE BLOCK WALL I
CTT TTT qT TtTT TTT Cott 7 220
COMPACTED SOIL FOUNDATION UNDER WALL I I
(ABOVE LINER SAND) Le J p00
i i AS-BUILT PRIMARY LINER SAND GRADE
4e9 aoe 4o- Lo joe 4-H Li 480
o+s0 100 1480 200 2680 3+00 3450

VERTICAL SCALE STATION = EXISTING CONCRETE BLOCK WALL
40 oo! 40" 80"

« EXISTING CONCRETE BLOCK WALL PROFILE

(FOR INFORMATION ONLY)

o 40!
HORIZONTAL SCALE

DRAWN BY: R. CLAY

CONCRETE BLOCK WALL CORRECTIVE ACTION PROJECT NUMBER:
CITY OF NASHUA

DESIGNED BY: R. CLAY FOUR HILLS LANDFILL 3066.21
D BY: E. STEINHAUSER NASHUA, NEW HAMPSHIRE

(fa PROJECTMGR: R. CLAY PROPOSED EAST WALL SHEET NUMBER:

Pic: E. STEINHAUSER

DATE: JANUARY 2021 CORRECTIVE ACTION PLAN 3 OF 6

SANBORN ll HEAD] usw

: ei
Ea HOWL et
“Hei nntte TOL One DESORPTION EW

Page Image
Finance Committee - Agenda - 3/17/2021 - P563

Finance Committee - Agenda - 3/17/2021 - P564

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
564
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

90th aahmOnERDNaDSOTES

3
8

EXISTING —_, |

CONCRETE
BLOCK WALL
(HEIGHT
VARIES)

NOTES:

Sl 1. EACH VERTICAL LFG EXTRACTION WELL IS TO BE EQUIPPED
él WITH A DEWATERING PUMP. SEE DETAIL 1 ON SHEETS.
il
| 2. EXISTING WELLS WITHIN THE AREA OF GEOMEMBRANE COMPRESSED AIR & DEWATERING SUPPLY
Z| DEPLOYMENT SHALL BE BOOTED. (SEE DETAIL 1 ON SHEET §}
a FERNCO CAP
a 69 PVC PPE
3 6" HDPE PIPE
il Wet CAP 6" PVC FLANGE
&| (SEE DETAIL 1 ON SHEET §) SOAPTER
ty
8 8x6" 6" HDPE
— al EXISTING SMOOTH B88 "6" PVE naNoe
60-MIL HOPE REDUCING TEE TANCE

GEOMEMBRANE

C3
masTING PIPE BOOT

GEOTEXTILES

INSTALL ONE ROLL WIDTH

TRANSITION PIPE
TO BELOW GRADE

Qgp TOREMOTE
reLLHEAD

EL ANCHOR TRENCH

WELL CAP
(SEE DETAIL 1 ON SHEET 5}

40-mil THICK TEXTURED

B'xB'x6" PVE HDPE GEOMEMBRANE 45° MIN.
exISTING REDUCING TEE
(TO REMOTE
WELLHEAD) ©
INTERMEDIATE -—
COVER t

BENTONITE SEAL

SAND/GRAVEL FILTER

40-mil THICK TEXTURED (2FTK2FT -
EXTRUSION WELD GEOMEMBRANE ' |
8°@ SCHEDULE 89 ——]
CUT OUTER GEOTEXTILE SOLID PVC PPE 2
TO ALLOW FOR WELD AND
LEAVE WELD VISIBLE
— 8'9 SCHEDULE80
(Py PIPE JOINT
LFG EXTRACTION WELL Ney ° STONE AGGREGATE
a . a
8°@ SCHEDULE 80
\5_J PERFORATED PVC PPE | WELL DEPTH VARIES
° (SEE WELL SCHEDULE}
. mn
an WASTE
mS _
8°@ PVC END CAP
CRUSHED STONE
6" PERFORATED
HDPE PIPE
— 2.5! MIN ——-|
Cre 5 LFG EXTRACTION WELL CONSTRUCTION
NOT TO SCALE
PRIMARY
GEOMEMBRANE
WELL SCHEDULE
BOTTOM OF TOP OF TOTAL WELL | BOTTOMOF | TOP OF WELL SCREEN | TOP OF CASING
pest tion | NORTHING EASTING WASTE EXISTING DEPTH WELL SCREEN SCREEN LENGTH ELEV.
(FT) WASTE (FT) FT) (FT) (FT) (FT) FT}
v029 822169 10285828 2186 2768 508 226.1 2718 455 281.1
‘vos0 821240 10236198 2319 282.4 427 2394 2774 377 2866
vos 820317 10286584 2247 2838 514 2322, 2788 464 288.1
vos2 19307 10286074 234.5 282.9 409 242.0 2778 35.8 2874
033 818473 10287386 236.5 2863 423 244.0 2813 373 2908
vos4 817549 10237744 2347 2838 nS 2422 2788 365 288.1
GEOMEMBRANE Voss 816632, 1023813.8 232.8 2748 347 230.8 260.5 207 279.0
GEOSYNTHETIC CLAY LINER Voss 818705 10288518 2303 2617 23.9 2378 286.7 189 266.2
INAGE
GEOCOMP OSE 037 818456 10244405 2384 2717 25.8 245.9 266.7 208 276.2
WELL SCHEDULE NOTES:
SECTION VIEW 1. TOP OF EXISTING WASTE ELEVATIONS PRESENTED IN THE WELL SCHEDULE SHALL BE RE-SURVEYED BY CONTRACTOR AND ELEVATIONS SHALL BE PROVIDED TO ENGINEER PRIOR 70 DRILLING.
2. LFG EXTRACTION WELLS SHALL BE INSTALLED WITHIN ONE FOOT OF THE LOCATIONS LISTED IN WELL SCHEDULE.
© NOT TO SCALE
DRAWN BY: R. CLAY CONCRETE BLOCK WALL CORRECTIVE ACTION PROJECT NUMBER
DESIGNED BY: R. CLAY CITY OF NASHUA
© eTINHAUSER FOUR HILLS LANDFILL 3066.21
Dey: E.
SANBORN HEAD Senasneres —
PROJECTMGR: R. CLAY SHEET NUMBER
Pic: E. STEINHAUSER DETAILS 40F6
DATE: JANUARY 2021
TO. DATE DESCRIPTION Ea

Page Image
Finance Committee - Agenda - 3/17/2021 - P564

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3730
  • Page 3731
  • Page 3732
  • Page 3733
  • Current page 3734
  • Page 3735
  • Page 3736
  • Page 3737
  • Page 3738
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact