Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 35081 - 35090 of 38765

Finance Committee - Agenda - 8/5/2020 - P103

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
103
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

Mr. William Keating
COR review
626/26

Detailed review of the fair market value

Claimed Cost | Fair Market Value | Allowable Mark-up** | Work Value Assessment
of Wark of Work scope
$1,109 $640 (includes 15% on MC Work $1,109
materials & 10% on Subs (<$50k)
equipment}* /-£/2% on Subs (#50-
100Ic)
5% on Subs (>100k)

*Market Value Assessment-$1,082 to $1,624 (1/- 20%)

Detailed Review-Schedule

Methuen made a claim for schedule adjustment but has not provided a CPM (critical path
method) schedule showing how this item moved onfo the critical path, Their schedule claim is
‘ therefore evaluated at 0 days. Therefore we recommend 0 days be awarded.

Original Schedule Schedule Direct Schedule Schedule Claim
Adjustment claim Impact Assessment Recommended
None 1 0 0
Conclusion

Waldron has reviewed all the available information, and has taken into consideration the factors
surrounding the issues in question.

Waldron recommends approving $1,109 of the claim as noted above @ days of schedule relief.

If you have any questions on the above, please don’t hesitate to contact me at 603-772-7153 x
105 or jsmith@waldron.com

Sincerely

Waldron Engineering & Construction, Inc,

Jerony P. Sith, PE,

Jeremy Smith, P-E,

Page Image
Finance Committee - Agenda - 8/5/2020 - P103

Finance Committee - Agenda - 8/5/2020 - P104

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
104
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

Methuen Construction Co., Inc.
144 Main Street - PO Box 980
Plaistow, New Hampshire 03865

PCO #027

Project; 181012 - Nashua Energy Recovery Upgrade
2 Sawenill Re.
Nashua, New Hampshire 03060

Phone: (603) 328-2222

Prime Contract Potential Change Order #027: Recoring for Chimney Stack
#2

City of Nashua

TO: FROM: Methuen Construction Co., Inc.
229 Main Street 144 Main Sireet PO Box 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865

PCO NUMBER/REVISION: 027/70 CONTRACT: iFBOSO1-G90618 NASHUA PO #146864 -

Nashua Energy Recovery Upgrade

REQUEST RECEIVED FROM: Don Hutchinson (Methuen Construction CREATED BY: Anthony Crespo (Methuen Construction Co.,
Co., Inc,} Ins.)

STATUS: Pending - In Review CREATED DATE: — 6/10 /2020

REFERENCE: — DATE SENT:

FIELD CHANGE: No PRIMECONTRACT None —~—~CS
CHANGE ORDER:

LOCATION: Energy Recovering Building

SCHEDULE IMPACT: 1 day ACCOUNTING Amount Based ,
METHOD:

PAID INFULL: No TOTALAMOUNT: — $1,109.22

Methuen Construction (MC}, hereby submits this PCO in accordance with the documentation referenced herein. It is expressly understood and agreed
that this proposal is valld for the time as specified within this document from the date of tha PCO. The Proposal is based upon current day construction
costs and does not include escalation costs for any material items that are either volatile or market sensilive. This Proposal does not include overlime
acceleration or expediting costs. This proposal does not include the costs associated wilh out of sequence construction, interference, impact related
delays and disruptions. MC reserves its rights under the agreement to seek additional time, indirect and impact costs associated with the PCO, once the
impacts can be fully evaluated. This proposal is submitted based on the understanding that it is exempt from WBE/MBE participation requirements and
acceptance of this proposal waives the participation requirements associated with this additional work.

POTENTIAL CHANGE ORDER TITLE: Recoring for Chimney Stack #2
CHANGE REASON: Existing Condition

POTENTIAL CHANGE ORDER DESCRIPTION; (The Coniract Is Changed As Foflaws)

CE #056 - PCO 27- Recoring Chimney Stack #2

Scope: There were issues running generator #2 exhaust stack through the ceiling. The existing core holes through the roof were nat plumb making it
impossible to run the stack through. MC had to recore the holes se that the stack could properly be erected. The below is a breakdown of the work
performed including, renting core drill, coring through roof, cleanup, etc. As a result MC is requesting 1 day to be added to the overall constructian
schedule.

ATTACHMENTS:

Burden Rate

Subtot:
{43.00% Appiies to Labor} ubtotal

# | Cost Code Dascripiion Typa Amount

22-0300 -
BREECHIN
1 | Ssysten |b

PHPING

Labor $977.36 5 248.26 $825.62

22-0300 -
BREECHIN
2 losysren |EtRment

PIPING

Equipment 5 120.00 30.00 $120.00

Methuen Construction Co., Inc. page 1 of 2 Printed On: 6/10/ 2020 02:42 PM

Page Image
Finance Committee - Agenda - 8/5/2020 - P104

Finance Committee - Agenda - 8/5/2020 - P105

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
105
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

PCO #027

Subtetal: S697.36 $248.26 $945.62

GC Wark Total Foe» Labor: 15.00% Applies to Labor 5 123.84

GG Wark Total Fee - Material & Equipment: 15.00% Applies to Otter, Matorial, and Equipment. 518.00

G¢ Subcontractors Work Fee: 10,00% Applies to Subcontractor, $0.06

Bond & Ganoral Liability: 2.00% Apalices to Other, Material, Committed Costs, Labor, Rental Equipmont Refef, Equipment, Subcontractor, and Burder. $21.76
Grund Talal: $1,100.22

Jeremy Smith, P.E. (Waldron Engineering
& Construction, Inc.)

37 Industrial Drive Suite G-1
Exeter, New Hampshire 03833

City of Nashua

229 Main Street
Nashua, New Hampshire 03060

Methuen Construction Go., Inc,

144 Main Street PO Box 980
Plaistow, New Hampshire 03865

SIGNATURE DATE

Methuen Construction Co., Inc.

SIGNATURE DATE

page 2 of 2

SIGNATURE DATE

Printed On: 6/10/2020 02 :42 PM

Page Image
Finance Committee - Agenda - 8/5/2020 - P105

Finance Committee - Agenda - 8/5/2020 - P106

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
106
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

ar industrial Doc #: PCO 27

II sens nruenetn Ref. Document:

PROJECT NAME; Date: a-Jun-20

Nashua Energy Recovery
PROJECT NO: 1813012
PHASE
COST SUMMARY SHEET
Recoring Chimney Stack #2
A MC Labor (Recap Sheet): $825.62
B MC Materials, & Equipment (Recap Sheet): $120.00
c MC Fee (A x 15%) + (B x 15%): $141.84
D Subtotal MC Work (A+B+C)}: | $ 1,087.47
E Total Subcontractors (Below):
F Mc Mark-up on Subcontractor Work (5%, 7.5% or 10%):
G Bond (1%) and General Liability (1%): $21.75
H Original FBS Location Credit $0.00
Total Proposal (D +E +F+G): $ 1,109.22

SUBCONTRACTOR SUMMARY

Subcontractor Description

5
$
$
$
$
3

Total Subcontractors:

Amount

Page Image
Finance Committee - Agenda - 8/5/2020 - P106

Finance Committee - Agenda - 8/5/2020 - P107

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
107
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

Recoring Chimney Stack #2

Scope: There were issues aunning generalor #2 exhaust slack through the ceiling. The existing core holes through ihe reof were not plumb making il impossible lo run the
aiack thraugh. MC had to recore the holes sa that the stack could properly be erected. The below is a breakdown of the work performed including, renting core drill, cering
through roof, cleanup, atc, As a result MC Js requesting 4 day fo be added Io the overall construction schedule,

1-LABOR
CATEGORY HRS RATEHHR PREMIUM SUBTOTAL = LINE TOTAL TOTAL
DRIVER
AL $577.35
2-MATERIALS
DESCRIPTION ary UNIT UNITCOST SUBTOTAL
SUBTOTAL 5 -
3-EQUIPMENT Eo
CATEGORY QTY RATE UNIT SUBTOTAL
VATOR PC300 5190
FRONT END LOADER
SUBTOTAL $120.00

Page 2015 6/10/2020 - 2:33 PM

Page Image
Finance Committee - Agenda - 8/5/2020 - P107

Finance Committee - Agenda - 8/5/2020 - P108

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
108
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

WALDRON ENGINEERING & CONSTRUCTION. INC.

To: William Keating, P.E., Project Engineer, Nashua Wastewater Treatment Facility
Piom: Jeremy P. Sinith, FE., Waldron Engineering & Construction, inc.

Date: March 28, 2020

Re: Change Order Request Review 028

NWWTE Energy Recovery Upgrade Project

Attachments: Methuen Construction PCO-028 Electrical items (list of six)

Mr. Keating:

Waldron has compiled its review based on review of the Owner’s documentation (design
documents, OEM submittals, submittal reviews, RFI responses, and project notes) and the
Contractor’s documentation (RFI’s, Submittals, Reports, issued Change Orders). Specifically;
Waldron has reviewed the issue of additional work associated with the installation of the jacket
water booster purops. Methuen has previously submitted for the related electrical scope of work.

Summary Review

Original Schedule Schedule Direct Schedule Schedule Claim
Adjustment claim Impact Assessment Recommended
None 14 0 0
Original Cost Cost Adjustment Direct Cost Impact Cost Adjustment
claim Assessment Recommended
None $17,168 $736 3736

Detailed Review-Base Cost Validity

Methuen has made a claim for the work as required based on RFI responses, submittal reviews
and Field conditions. The claim is based on their work and their subcontractor’s work resulting
from the above. Waldron has reviewed the design documents, OEM submittals, submittal
reviews, and RFI respouses regarding this issue. Waldron has relied on vendor quotes, project
cost estimations, histozical project data, RS Means, and its own proprietary cost data to review the
cost validity of the work scope,

The submitted PCO is based on additions to the work for various electrical items which MC
believes are additional to the project, The various items are summarized in the next sheet as to
their validity and any specific reasons. Generally, items which are unforesecable-unknow existing
conditions or legitimate additional work requested by others are recommended, Those that are
foreseeable work due to conditions that could have or should have been assessed during bid
walkthroughs, or are the result of trade-to-itade coordination (which is the responsibility of the
G.C.} are not recommended.

37 INDUSTRIALDAIVE SUTEG-1 EXETER,NHDSB83 (603}772-7153 WaALOON GM

Bub A Tt ho pena ay s Fhe 2e3!

a sasrrseenenreniam eSeens cep ees efincasic! Sr ureter = repeats arm

Page Image
Finance Committee - Agenda - 8/5/2020 - P108

Finance Committee - Agenda - 8/5/2020 - P109

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

Mr. William Keating
COR review
6126/20

1-Oas Deleclor

Datnaged by coring | Nu (Foreseeable/Trade cour.) | $5,191

Wiring worl

2-Plant Phone Wiring | Damaged by sawing | No (Foresceable/Trade coor.) | $2,911
work

3-New Boiler Room | Added work Yes (Legitimate Add) $736

Cir. Pumps

4-Thermostat Wiring | Damaged by sawing No (Foreseeable/Trade coor.) | $1,038
work

5-Receptacle Wiring | Damaged by sawing | No (Foreseeable/Txade coor.) | $2,696
work

6-Ext. Light Wiring | Damaged by Wall No (Foreseeable/Trade coor.) | $4,583
demo

Therefore, of the list of Work items #1-6 above, only #3 appears to be an extra item

As such, work item #3 will be evaluated for total market value

Only Work Stem #3 (take the higher assessed value or the claim, whichever is lower)

Claimed Cost | Fair Market Value | Allowable Mark-up** | Work Value Assessment
of Work of Work scope
$736 $684 (includes 18% on MC Work $736
materials && 10% on Subs (<$50k)
equipment)* 7-1/2% on Subs ($50-
100k)
5% on Subs (+100k}
*Market Value Assessment-3602 to $903 (4/- 20%)

Detailed Review-Schedule

Methuen made a claim for schedule adjustment but has not provided a CPM (critical path
method) schedule showing how this item moved onto the critical path. Their schedule claim is
therefore evaluated at 0 days. Therefore we recommend 0 days be awarded,

Original Schedule Sehedule Direct Schedule Schedule Claim
Adjustment claim Impact Assessment Recommended
None 14 0 0

Page Image
Finance Committee - Agenda - 8/5/2020 - P109

Finance Committee - Agenda - 8/5/2020 - P110

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
110
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

Mr. William Keating
COR review
6/26/28

Conclusion

Waldron has reviewed all the available information, and has taken into consideration the factors
surrounding the issues in question.

Waldron reconamends approving $736 of the claim as noted above. {} days of schedule relief

If you have any questions on the above, please don’t hesitate to contact me at 603-772-7153 x
105 or jsmith@waldron.com

Sincerely
Waldron Engineering & Constmiction, Inc.

goremy P. Sith, PE.

Jeremy Smith, P.E.

Page Image
Finance Committee - Agenda - 8/5/2020 - P110

Finance Committee - Agenda - 8/5/2020 - P111

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
111
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…
Page Image
Finance Committee - Agenda - 8/5/2020 - P111

Finance Committee - Agenda - 8/5/2020 - P112

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
112
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

PCO #028

Methuen Construction Go., Inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Street - PO Box 980 2 Sawmill Rd.
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03060

Phone: (603) 328-2222

Prime Contract Potential Change Order #028: PCO 028- Basic Electrical

Iu: Clly of Nashua FROM: Methuen Constructlon Co., Inc.
229 Main Street 144 Main Street PO Sox 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865
PCO NUMBERIREVISION: | 028 /0 , CONTRACT: ”1FBG501-090618 NASHUA PO. #146861 -
/ Nashua Energy Recovery Upgrade
REQUEST RECEIVED FROM: Eva Fritz (Electrical Installations Inc.} GREATED BY: Anthony Crespo (Methuen Construction Co.,
Inc.)
‘STATUS: Pending In Re Review = GREATEDDATE: 6/10/2020 —
REFERENCE: " ~ DATESENT: «6/10/2020 .
FIELD CHANGED TUNG nee PRIME CONTRAST Noga nr
CHANGE ORDER:
SON celeste me eminie weary conte ueogs tid nneenenssteiinaf ete tee teae ee seuneen aenanenney saan naman teatime c ceobe cietenetecurvece aaa alee wr gave again eeu anes
SCHEDULE IMPACT: 14 days ACCOUNTING Amount Based.
METHOD:
PAID IN FULL: No TOTAL AMOUNT; $17,458.33

Methuen Construction (MC), hereby submits this PCO in accordance with the documentation referenced herein. [tis expressly understood and agreed
that this proposal is valid for the time as specified within this document from the date of the PCO. The Proposal is based upon current day construction
costs and does not Include escalation costs for any material items that are either volatile or market sensitive. This Proposal does not include overtime
acceleration or expediting costs. This proposal dees not include the costs associated with out of sequence construction, interference, impact related
delays and disruptions. MC reserves its rights under the agreement to seek additional time, Indirect and impact costs associated with the PCO, once the
impacts can be fully evaluated. This proposal is submitted based on the understanding that it is exempt from WBE/MBE participation requirernents and
aoaeptance of this proposal waives the participation requirements associated with this additional work,

POTENTIAL CHANGE ORDER TITLE: PCO 028- Basic Electrical
CHANGE REASON: No Change Reason

POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows}

CE #057 - PCO 028- Basic Electrical Changes

The following work was performed to accommodate the conduit relocations exceeding the values fram PCO 7:

CO 12- Gas Detection- Repair the existing gas detection conduit and wire which was damaged white coring holes for the new Digester Gas line.

CO 13- Conduit & Wire for 2 plant phones- Repair the conduit and wire which was damaged while saw cutting for the new generator engine pad.

CO 14- Boilar Room Circulation Fumps- Wired up the new clroutation pumps on boiler. Permanent wire in the feeds,

CO 15- Thermostats for Unit Hteaters- While saw cutting for tha Gen #2 pad, the existing unit heater thermostats were in the wall and damaged. These
have been replaced,

CO 16+ Pull Wire & Install Receptacies- Repair conduit, wire, & install receptacles from generator pad saw cutting

GO 17- Conduit & Wire Repair Outside Wall Pac Lights- Repair conduit 7 wire damaged during the demo of the interior wail connecting the old electrical
room lo the generator room,

Please see aitached subcontractor breakdown. As a result, MC is requesting an extra 14 days to be added to the overall schedule

ATTACHMENTS:
7 Burden Rate
# | Cost Code Description Type Amount {43.00% Applies to Labor} Subtotal
26-0100 -
1 ELECTRICA Subcontractor Ss Seonirasl Fs 45,476.14 sooo] $15,476.14
L

Methuen Construction Co., Inc. page 1 of2 Printed On: 6/10/2020 02:54 PM

Page Image
Finance Committee - Agenda - 8/5/2020 - P112

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3505
  • Page 3506
  • Page 3507
  • Page 3508
  • Current page 3509
  • Page 3510
  • Page 3511
  • Page 3512
  • Page 3513
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact