Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 14051 - 14060 of 38765

Board Of Aldermen - Minutes - 4/26/2021 - P13

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
13
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Annual Sewer Infrastructure Improvements

Assessment of Pipe and Structure Condition

¢ Identify pipe to assess — Prioritized by age,
material, and critically of location

¢ Cleaning of pipe

¢ Closed Circuit Television (CCTV) inspection

¢ Review video and determine if and what
rehabilitation is required

oy TTS TAMH 7
Downstream MH No ee Rye ee

ee Tie Ee as =

Material: ry A cg
TCL ey

Fifield St — built 1919 (12” clay) — alignment offset Myrtle St — built 1879 (24” brick)

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P13

Board Of Aldermen - Minutes - 4/26/2021 - P14

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
¢ Point repair

Ash St - built 1889 (12” concrete) -crown fractures Ash St — built 1915 (12” clay) - collapse
and collapse

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P14

Board Of Aldermen - Minutes - 4/26/2021 - P15

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
¢ Point repair

¢ Cure-in-Place Pipe (CIPP) Lining

° Epoxy Lining

Hinged fractures at top of pipe Post-lining

Gilman Street — 20 inch clay built 1910

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P15

Board Of Aldermen - Minutes - 4/26/2021 - P16

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
16
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

CITY OF NASHUA, NH PERHAM ST
[rh a Te

mem 0024.6 F 03.3D

b>

Persistent roots entire length
Perham Street —built 1893 (15” clay)

Blockage and collapse Collapse and top fracture
Main Street —built 1869 (15” concrete)

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P16

Board Of Aldermen - Minutes - 4/26/2021 - P17

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
17
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
Point repair

Cure-in-Place Pipe (CIPP) Lining

° Epoxy lining

¢ Replacement

a oii Ww
| es
ey a Ae Wr
| ~ | aa
ree ge ¥
x iasem .
Uy ? t = = — an —
o — 7 ;
‘ / : Oy
metre. ee
me A ve Cera ies
\

Chase Street — built 1885

(12” concrete) Sewer replaced in 2018

Sewer
replaced
2018

Charles Street — Built 1886 ( 12”

concrete) - collapse a

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P17

Board Of Aldermen - Minutes - 4/26/2021 - P18

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
18
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Sewer Infrastructure Budget History

Year Millions
FY 2011 $1.26
FY 2012 $2.00
FY 2013 $1.26
FY 2014 $1.32
FY 2015 $1.39
FY 2016 $1.46
FY 2017 $3.10
FY 2018 $3.00
FY 2019 $5.00
FY 2020 $5.15
FY 2021 $5.41

Ne Koy ee Ck

Gillis St

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P18

Board Of Aldermen - Minutes - 4/26/2021 - P19

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
19
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Annual Sewer Infrastructure Improvements

Year Replacement FT Lining FT cclV oy
2009 3,225

2011 2,980 757

2012 2,047 1,237

2013 2,965 600

2014 2,673 836

2015 1,270 270

2016 2,035 224

2017 805 1,094

2018 615 14,221

2019 4,947 27,918 43,032
2020 2,912 55,663 31,290
2021 1,000 30,000 50,000

Main St at Mulberry St — replacing 1869 concrete
sewer with PVC pipe and new structure

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P19

Board Of Aldermen - Minutes - 4/26/2021 - P20

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
20
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Brick ,Main Sewer

| Sul GF Cristrsnlen — 188
. fae Je.
Beach St

Exit Matias St
aed ied ht dll a
a 6 sor
‘ | ; asf A
'y TEs 7 { Jha) Mains Server Jar 10 fe; dracntothsenie
: | ry! : = ( of Pratnut Jd, euble hicdmoss tir =|
| \ a 306. 7 azp Wer ule S A areas

; | Ground, 22 hejunction of Wilder Se vikeey

‘i Meles Sa 4 5 Sian the Ee and Hotlss St Senevs pry

: WT # There wasan 8° Pitre fiadin Man Sewed ease 4 »
No Sewer on Het Hettir SE Rabin

edAvsste ened 5 Chanetterd
i $ Tae Ota Sewer
i PFE Sewer weal teje wn é — BREN LL a. F1gAv oem eR Pai and bn Man 6A,
* an 2 rend ehnecite { > 5 ., ‘ Sea ;
2 6 eid. SP Garden Fe Seciplon nd _ Phy Vand Competing) Sed jon He" TPWER —_ XS > ;
my et ‘ie ’ —and = eee Try wad — r¢ ee
~ 4S" Pina, * ender Sreund shresate « ~ ?Ae ¥
ba LeonBel Gy Betas RE er aremne shen the fmt aus
i > Rave Woo ire sotee
5 a ILIVE R= tom Wilde Ns » f m ‘
————_______ ;

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P20

Board Of Aldermen - Minutes - 4/26/2021 - P21

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
21
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

Resolution R-21-128

REQUEST TOISSUE BONDS NOT TO EXCEED ONE MILLION
FIVE HUNDREDAND FIFTY THOUSAND DOLLARS ($1,550,000).

THE PROCEEDS OF SAID BONDS SHALL BE USED IN ADDITION
TO THE $2,800,000 PREVIOUSLY APPROPRIATED UNDER
RESOLUTION R-19-127 APPROVED ONAPRIL 30, 2019 TO PAY
COSTS OF THE POLICE DEPARTMENT'S HEATING,
VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEM,
WINDOW IMPROVEMENTS AND LOCKER AREA IMPROVEMENT
PROJECTS.

THE USEFULLIFE OF THE IMPROVEMENTS IS TWENTY YEARS

WITH THE APPROVAL OF THIS ADDITIONAL BORROWING, THE
TOTAL AMOUNT AVAILABLE FOR THIS RENOVATION PROJECT
WILL BE FOUR MILLION THREE HUNDRED FIFTY THOUSAND
DOLLARS ($4,350,000).

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P21

Board Of Aldermen - Minutes - 4/26/2021 - P22

By dnadmin on Mon, 11/07/2022 - 07:04
Document Date
Mon, 04/26/2021 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 04/26/2021 - 00:00
Page Number
22
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__042620…

NASHUA PD HVAC SYSTEMS-HISTORY

THE HVAC SYSTEMS WERE DESIGNED IN TWO (2) STAGES
WITH THE “ORIGINAL* PART OF THE FACILITY DESIGNED IN
1977 AND A SUBSEQUENT ADDITION AND RENOVATION
PROJECT IN 1999. THE HVAC SYSTEMS FOR THE TWO PARTS
OF THE FACILITY ARE COMPLETELY INDEPENDENT; THE 1977
DESIGN IS BASED ON A WATER SOURCE HEAT PUMP SYSTEM
AND THE1999 DESIGN IS BASED ONA VARIABLE AIR VOLUME
SYSTEM.

THE 1977 DESIGN INCORPORATEDA PISTOL RANGE ANDA
FLEET MAINTENANCE GARAGE AT THE BASEMENT LEVEL;
EACH WITH DEDICATED HVAC SYSTEMS.

2005 MODIFICATIONS: THIS PROJECT PRIMARILY INCLUDED
REPLACEMENT OF THE 1977 VINTAGE HEAT PUMPS, BOILER
AND MODIFICATION TO THE EXHAUST SYSTEM.

Page Image
Board Of Aldermen - Minutes - 4/26/2021 - P22

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1402
  • Page 1403
  • Page 1404
  • Page 1405
  • Current page 1406
  • Page 1407
  • Page 1408
  • Page 1409
  • Page 1410
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact