Document Date
Meeting Description
Document Type
Meeting Date
Page Number
17
Annual Sewer Infrastructure Improvements
Rehabilitation of Pipe and Structures
Point repair
Cure-in-Place Pipe (CIPP) Lining
° Epoxy lining
¢ Replacement
a oii Ww
| es
ey a Ae Wr
| ~ | aa
ree ge ¥
x iasem .
Uy ? t = = — an —
o — 7 ;
‘ / : Oy
metre. ee
me A ve Cera ies
\
Chase Street — built 1885
(12” concrete) Sewer replaced in 2018
Sewer
replaced
2018
Charles Street — Built 1886 ( 12”
concrete) - collapse a
Page Image
