Document Date
Meeting Description
Document Type
Meeting Date
Page Number
15
Annual Sewer Infrastructure Improvements
Rehabilitation of Pipe and Structures
¢ Point repair
¢ Cure-in-Place Pipe (CIPP) Lining
° Epoxy Lining
Hinged fractures at top of pipe Post-lining
Gilman Street — 20 inch clay built 1910
Page Image
