Finance Committee - Agenda - 5/6/2020 - P97

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P97

Balancing PCO, Credit Request missed on CO#3

Scope: This PCO reflects the markup loss in PCO's 3&4. This PCO also includes the $847.85 from PCO#3 which was not included on CO#3. Change Order #3
reflected a (-660.00) in our overall contract, when it should have been a (+847.85). This was noted end approved in an email discussion between Anthony Crespo &

Wiley Little 10/25/2079

FRONT END LOADER

ROAD SAW

BREAKER

FORKLIFT LULL
1

RE DRILL

SUBTOTAL

$0.00

-00

$66.40 .
$54.42 50.

Finance Committee - Agenda - 5/6/2020 - P96

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P96

Doc #: 06
Ref. Document: 184016-PCO#6
PROJECT NAME: Date: 22-Jan-20
Nashua Primary Tank Upgrades
PROJECT NO: 181016
PHASE
COST SUMMARY SHEET
Balancing PCO, PCO#8 not reflected on CO#3
A NiC Labor (Recap Sheet):
B MC Materials, & Equipment (Recap Sheet):
Cc WIC Fee (A x 15%) + (B x 10%):
D Subtotal MC Work (A+B +C):
E Total Subcontractors (Below):
F MC Mark-up on Subcontractor Work (5%):
G Bond (1%) and General Liability (1%): $0.00
Total Proposal(D+E+F+G): $ 4,534.72

Finance Committee - Agenda - 5/6/2020 - P95

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P95

PCO #006

Finance Committee - Agenda - 5/6/2020 - P94

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P94

PCO #006

Methuen Construction Co., Inc. Project: 181016 - Nashua Primary Tank Upgrades
144 Main Street - PO Box 986 2 Sawmill Road
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03080

Phone: (603) 328-2222

Prime Contract Potential Change Order #006: Balancing Change Order

TO: City of Nashua FROM: Methuen Construction Ca., Inc.
229 Main Street 144 Main Street PO Box 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865

Finance Committee - Agenda - 5/6/2020 - P93

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P93

Section Xi: Warranty

JB Safety Intentional, Inc. warrants that all of our installations shall be free from defects in workmanship
for a period of five (5) years after project completion. We expect the lifespan of the project to be
significantly longer. Materials have their own warranty.

Section XH: Acceptance

| have read and understand this proposal. The above prices, specifications and conditions are
satisfactory and | accept them. You are authorized to do the work as specified. Payment will be made as
outlined above.

Finance Committee - Agenda - 5/6/2020 - P92

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P92

For this project we may be working on Saturday and Sunday to apply coatings.

We require an area to store our material and equipment that is protected from the elements.

We will require sanitary restroom and break room facilities for our crew.

We will leave the site ina broom clean condition.

Our price does include the disposal of all of our generated waste materials in dumpsters provided

by owner.

7. Our price does not include repairing any damage to the installed coating system caused by the
neglect, abuse or accidents of others.

Finance Committee - Agenda - 5/6/2020 - P91

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P91

Section IV: Health, Safety & Environment

Finance Committee - Agenda - 5/6/2020 - P90

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P90

LDYes EE} No {5®-5) White Metal &last Cleaning: Removal of all visible rust, mill scale, paint and foreign matter by blast cleaning by
wheel or nozzle (dry or wet) using sand, grit, or shot for very corrosive atmospheres where high cost of cleaning is
warranted,

LCves J No {5?-6) Commercial Blast Cleaning: Slast cleaning until at least two-thirds of the surface area is free of all visible residues
or rather severe conditions of exposure.

Finance Committee - Agenda - 5/6/2020 - P89

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P89

F. Owner to supply waste removal.
G. Owner to supply scaffolding.

H. Area to be free of materials, equipment and other obstacles. To be moved by owner.

Section Hl: Surface Preparation

Prepare surfaces in a professional! manner so as to produce finish work of a quality appearance and
durability. Abide by standards set forth by SSPC-Society of Protective Coatings and Painting & Decorating
Contractors of America.

Prepare all surfaces as needed to an SSPC- SP 10.

Finance Committee - Agenda - 5/6/2020 - P88

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P88

We are pleased to provide you with our proposal including the following sections:

Seciion I:

Section Il:
Section Hl:
Section IV:
Section V:
Section VI:

Section VII:

Section VIII:

Section IX:
Section X:
Section XI:

Section Xl:

Scope of Work

Surface Preparation

Material Application

Health, Safety and Environment
Quality Control and Assurance
Schedule

Clarifications and Requiremenis
Insurance

Pricing

Terms & Conditions

Warranty

Pagination

  • Previous page ‹‹
  • Page 463
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact