We are pleased to provide you with our proposal including the following sections:
Seciion I:
Section Il:
Section Hl:
Section IV:
Section V:
Section VI:
Section VII:
Section VIII:
Section IX:
Section X:
Section XI:
Section Xl:
Scope of Work
Surface Preparation
Material Application
Health, Safety and Environment
Quality Control and Assurance
Schedule
Clarifications and Requiremenis
Insurance
Pricing
Terms & Conditions
Warranty
Acceptance
Section I: Scope of Work
Prepare by mechanical blasting and coat with Sherwin Williams coatings system 163 ft of weirs of the
Primary Tank for the city of Nashua waste water project.
A. Protect all surface not being coated
B. Clean to SSPC SP 10
C. Prime and coat with 3coat system as per specs.
D. Provide inspection report.
E. Return area to broom clean condition.
418 Safety International, Inc. @ P.O. Box 476 @ Seguin, TX 78156 ¢ 281-857-7919 ¢jeff@jbsafetyintl.com
http://www _jbsafetyintl.com
Page |2
