Balancing PCO, Credit Request missed on CO#3
Scope: This PCO reflects the markup loss in PCO's 3&4. This PCO also includes the $847.85 from PCO#3 which was not included on CO#3. Change Order #3
reflected a (-660.00) in our overall contract, when it should have been a (+847.85). This was noted end approved in an email discussion between Anthony Crespo &
Wiley Little 10/25/2079
FRONT END LOADER
ROAD SAW
BREAKER
FORKLIFT LULL
1
RE DRILL
SUBTOTAL
$0.00
-00
$66.40 .
$54.42 50.
535.88
$45.54 50.
$30.04
$15.08
$120.00
1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
00 $0.00
FOR
LABORER
50.00
PLUMBER
$0.00
MILL
$0.00
-00
SUBTOTAL
2-MATERIALS
DESCRIPTION QTy UNIT UNIT COST SUBTOTAL
Estimated
Consumables $ §00.00 § 500.00 $ -
Dumpster / Disposal $ 750.00 § 750.00 $ “
SUBTOTAL 3 -
i3-EQUIPMENT
CATEGORY HRS RATE UNIT SUBTOTAL
iEXCAVATOR PC300 $180.35 HR $0.00
!EXCAVATOR CAT 330 $100.37 HR $0.00
iEXCAVATOR CAT 320 i $5871 HR $0.00
BUMP TRUCK i $61.23 HR