For this project we may be working on Saturday and Sunday to apply coatings.
We require an area to store our material and equipment that is protected from the elements.
We will require sanitary restroom and break room facilities for our crew.
We will leave the site ina broom clean condition.
Our price does include the disposal of all of our generated waste materials in dumpsters provided
by owner.
7. Our price does not include repairing any damage to the installed coating system caused by the
neglect, abuse or accidents of others.
8. Our price does not provide for the cost of dehumidification and dust collection equipment, if
required.
9. Our price is based on customer providing any heat, lighting, water electricity or any other utilities.
2.
3.
4.
5.
6.
Section Vill: Insurance
We have various levels of insurance as mandated by local, state and federal laws for the various
jurisdictions we work in, including general liability, workmen’s compensation and automobile coverage. All
certificates of insurance will be presented prior to the commencement of our work to meet the minimum
project specifications and list additional insured parties, if required.
Section 1X: Pricing
We propose to furnish all of the labor, materials, lift, supervision and insurance necessary to complete the
project as defined and presented in this proposal for the lump sum of:
$ 11,000.00 { Eleven Thousand Dollars US}
Section X: Terms and Conditions
50% prior to mobilization, 50% on completion, 0.5%net 10
Our price does not include any local, state or federal
acceptance of a formal contract.