Finance Committee - Agenda - 2/2/2022 - P98
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Phase 3 — Final Design
Upon written approval of the Preliminary Design from the City and NHDOT, Final Design will
begin.
Phase 3A - Environmental Permitting
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Phase 2G — Project Meetings
MJ will meet with City staff periodically during the Preliminary Design Phase. It is assumed that
two (2) MJ staff will attend and facilitate these meetings. MJ will generate meeting notes that
will be distributed after each meeting. It is assumed two (2) meetings will be held during
Preliminary Design.
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Phase 2E — Public Involvement
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
will revise the document and provide the City and NHDOT with the Final CE (electronic file and
up to three hardcopies).
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
For the purposes of this scope, it is assumed that the project will result in a
determination of No Adverse Effect to historic resources. MJ will prepare the draft
Section 106 Effect Memo for NHDOT’s use in acquiring signatures.
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
assess the project’s impact on local pollutant concentrations to assess conformance with
National Ambient Air Quality Standards (NAAQS).
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
developed based on pricing information gathered by MJ or provided by NHDOT cost
summaries. The estimate, as with all estimates, should not be construed as an actual price for
construction, but merely the engineer’s opinion as to the probable cost of construction.
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
10.
11.
12.
13.
14.
15.
Grading Plans - Plans will be completed at a scale of 1” = 20’. These sheets will include
proposed spot elevations.
Exhibit A
NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
Amendment 1
September 30, 2021
Phase 2 — Preliminary Design
Phase 2A — Preliminary Plans and Estimate
Preliminary Plans will be developed based on the preferred alternative. These plans will include
the following sheets developed to a 60% level.
1. Title Sheet and Index
2. Standard Symbols Sheets