Finance Committee - Agenda - 6/21/2017 - P27
BPS NASHUA FIRE 3 GMP 002 no elevator
Bonnette, Page & Stone
Job: 121821875 - NASHUA FIRE 3 GMP 002 no elevator
TY Reference Type AdjQty Units AdjUnitCost Labor Material Equipment SubContr Other XtdCost
S$ 07.720.32 SPRAY FOAM AT SILL 1.00 LS 5,232.00 0.00 0.00 0.00 5,232.00 0.00 5,232.00
Subtotal: Building Insulation (07-720) $526.24 $1,771.00 $0.00 $8,627.00 $0.00 $10,924.24
Metal Siding Panels ( 07-730)
S$ 07.730.20 074214 - METAL WALL 1.00 LS 68,595.00 0.00 0.00 0.00 68,595.00 0.00 68,595.00
PANEL SYSTEM