Bonnette, Page & Stone
TY Reference Type
NASHUA FIRE 3 GMP 002 no elevator
Job: 121821875 - NASHUA FIRE 3 GMP 002 no elevator
AdjQty Units AdjUnitCost Labor Material Equipment SubContr Other XtdCost
Rough Hardware ( 06-620)
M_ 06.620.02 ROUGH HARDWARE 1.00 LS 5,000.00 0.00 5,000.00 0.00 0.00 0.00 5,000.00
MATERIALS
Subtotal: Rough Hardware (06-620) $1.00 LS $5,000.00 $0.00 $5,000.00 $0.00 $0.00 $0.00 $5,000.00
Subtotal: Woods and Plastics (06) $12,264.00 $9,894.00 $0.00 $0.00 $0.00 $22,158.00
Thermal and Moisture Protection ( 07)
Damproofing ( 07-705)
S 07.705.06 071900 - FLUID 1.00 LS 9,858.00 0.00 0.00 0.00 9,858.00 0.00 9,858.00
APPLIED WRB AT CMU
Subtotal: Damproofing (07-705) $1.00 LS $9,858.00 $0.00 $0.00 $0.00 $9,858.00 $0.00 $9,858.00
Fire Stopping & Sealants ( 07-715)
L 07.715.02 FIRE STOPPING & 1.00 LS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 2,500.00
SEALANTS
INSTALLATION
M_ 07.715.04 FIRE STOPPING & 1.00 LS 2,500.00 0.00 2,500.00 0.00 0.00 0.00 2,500.00
SEALANTS MATERIALS
Subtotal: Fire Stopping & Sealants (07-715) $2,500.00 $2,500.00 $0.00 $0.00 $0.00 $5,000.00
Building Insulation ( 07-720)
L 07.720.02 PERIMETER 1,012.00 SF 0.52 §26.24 0.00 0.00 0.00 0.00 526.24
INSULATION
INSTALLATION
M_ 07.720.04 PERIMETER 1,012.00 SF 1.75 0.00 1,771.00 0.00 0.00 0.00 1,771.00
INSULATION
MATERIALS
S$ 07.720.12 072100 - FIBERGLASS 1.00 LS 1,715.00 0.00 0.00 0.00 1,715.00 0.00 1,715.00
INSULATION SUB-OUT
S 07.720.30 SPRAY FOAM AT 1.00 LS 1,680.00 0.00 0.00 0.00 1,680.00 0.00 1,680.00
WINDOWS
Printed: 5/31/2017 8:57:45 AM
Estimator: Barry Beauregard
Page: 11