Finance Committee - Agenda - 6/7/2017 - P292

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P292

5.

1.

16010-4
ELECTRICAL - GENERAL

required to modify these changes along with all requirements for installation
of the new work, as shown on the Contract Drawings.

Finance Committee - Agenda - 6/7/2017 - P291

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P291

16010-3
ELECTRICAL - GENERAL

e. Provide complete branch circuit wiring systems including all raceways,
conductors, cables, outlet and junction boxes, wiring devices and device
connections as shown on the Drawings and as specified herein.

G. Work Specified Elsewhere:

1.

2.

The materials and methods used for all Electrical Work indicated in the

Contract Documents shall meet the requirements specified in Division 16.

The following Electrical Work and Work relating to the Electrical Work will

Finance Committee - Agenda - 6/7/2017 - P290

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P290

16010-2
ELECTRICAL - GENERAL

F. Work Specified Herein:

1.

Visit and examine the project site and become familiar with all existing
conditions pertinent to the work to be performed thereon. No additional
compensation will be allowed for failure to be so informed. This contractor is
responsible to be familiarized with the conditions of the project during the
bidding period in order to bring any clarifications or issues to the attention of
the Engineer prior to submission of his/her final bid price.

Finance Committee - Agenda - 6/7/2017 - P289

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P289

16010-1
SECTION 16010

ELECTRICAL - GENERAL

PART 1 - GENERAL

1.1

DESCRIPTION

A.

Provide all labor, materials, equipment, operations, methods and procedures as
indicated in the Contract Documents, together with all items necessary for or
incidental to the completion of the work.

All systems or additions to existing systems indicated in the Contract Documents

shall mean all necessary supervision, labor, equipment and materials required to

provide complete, properly functioning systems.

Finance Committee - Agenda - 6/7/2017 - P288

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P288

5. Q:

R:
6. Q:

R:
7. Q:

R:
13089K

Clarify if offices will be relocated while installing lights and new ceilings. Will contractor be
responsible for relocating things, installing temporary heaters and or AC units?

Finance Committee - Agenda - 6/7/2017 - P287

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P287

ADDENDUM NO. 1
NASHUA, NEW HAMPSHIRE
WASTEWATER TREATMENT FACILITY — HVAC UPGRADES

Finance Committee - Agenda - 6/7/2017 - P286

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P286

13089K

ADDENDUM NO. 1
TO
NASHUA, NEW HAMPSHIRE
WASTEWATER TREATMENT FACILITY — HVAC UPGRADES

IFB0292-041017

MARCH 2017

PREPARED BY:
Wright-Pierce
230 Commerce Way, Suite 302
Portsmouth, NH 03801

Addendum No. 1
Page | of 3

Mach 31, 2017

Finance Committee - Agenda - 6/7/2017 - P285

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P285

*All inquiries concerning this IFB including, but not limited to, requests for clarifications, questions, and any changes to
the IFB, shall be submitted via email, however, the City of Nashua assumes no liability for assuring accurate/complete
email transmission/receipt and is not responsible to acknowledge receipt. Inquires must be submitted in writing, citing
the IFB title, IFB number, Page, Section, and received no later than Thursday, March 28, 2017 at 12:00 am to:

William Keating,
Email: Keating W@NashuaNH.gov

Finance Committee - Agenda - 6/7/2017 - P284

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P284

The Bidding Documents may be examined at the following locations:

1. City of Nashua, Wastewater Treatment Facility, 2 Sawmill Road, Nashua, NH 03062
(between 7:00 am to and 2:30 pm Monday through Friday, except legal holidays)

2. Construction Summary, 734 Chestnut Street, Manchester, NH 03104

3. Wright-Pierce, 230 Commerce Way, Suite 302, Portsmouth, NH 03801
(between 8:00 am to and 4:00 pm Monday through Friday, except legal holidays)

4. Dodge Data and Analytics/Dodge Reports (http://.construction.com/)

Finance Committee - Agenda - 6/7/2017 - P283

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P283

A-1.1

=.) THE CITY OF NASHUA eee

Financial Services

Purchasing Department

March 16, 2017
INVITATION TO BID

HVAC Upgrades
IFB0292-041017