Finance Committee - Agenda - 6/7/2017 - P282
A. BIDDING REQUIREMENTS
13089K
A. BIDDING REQUIREMENTS
13089K
BIDDING AND CONTRACT REQUIREMENTS
13089K
SECTION
15601
15602
15604
15619
15626
15671
15732
15750
15780
15815
15820
15840
15862
15869
15891
15907
TABLE OF CONTENTS (CON’T)
TITLE
Hydronic Heating Systems, Piping and Specialties
Steam Heating Systems Piping and Specialties
Automatic Temperature Control (Electric)
Gas Fired Separated Combustion Air Handling Units
HVAC System Pumps (In-Line Circulators)
Ductless Split System Heat Pump Units
Converters
Hot Water Coils
TABLE OF CONTENTS (CON’T)
SECTION TITLE
DIVISION 9 - FINISHES
09510 Acoustical Ceilings
DIVISION 10 - SPECIALTIES
10150 Compartments and Cubicles
10505 Lockers
10810 Toilet and Bath Accessories
DIVISION 11 - EQUIPMENT
NOT USED
DIVISION 12 - FURNISHINGS
NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 - CONVEYING SYSTEMS
NOT USED
DIVISION 15 - MECHANICAL
TABLE OF CONTENTS (CON’T)
SECTION TITLE
01380 Construction Photographs
01400 Quality Control
01500 Temporary Facilities and Controls
01590 Temporary Field Office
01630 Substitution and Product Options
01710 Project Cleaning
01720 Project Record Documents
01800 Equipment Startup, Certification and Operator Training
DIVISION 2 - SITE WORK
NOT USED
DIVISION 3 - CONCRETE
03300A Cast-in-Place Concrete
03604 Non-Shrink Grout
03930 Concrete Coatings
TABLE OF CONTENTS
SECTION TITLE
DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS
SECTION A — BIDDING REQUIREMENTS
SECTION B —- CONTRACT
HVAC UPGRADES
CITY OF NASHUA, NEW HAMPSHIRE
CONSTRUCTION SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FEBRUARY 2017
WrIGHT-PIERCE = ae portland, Mi: Topshen ME
Engineering a Better Environment © Portsmouth, NH © Providence, RI
Orlando, FL
EXCLUSIONS:
e Site work, underground utilities & concrete pad for CMUA-1
Jobsite office trailer & furnishings
Jobsite storage trailer
Temporary utilities
Temporary HVAC / controls
Temp / portable toilet
Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above
Environmental issues / removal
Premium time and/or overtime
e Any/all items not specifically stated above to be included
General Conditions
Payment & Performance Bonding
Daily offloading, clean up & dumpsters for daily debris
Equipment, tooling, dust barriers & misc.
Project Management & Daily Supervision
Submittals
Project close out documentation
“COMMERCIAL
Building Co.
Serving the Commercial and Retail Industry
32 FITZGERALD DRIVE, UNIT #10 JAFFREY, NEW HAMPSHIRE 03452
PH. 603-878-0810 FAX 603-878-0809
ADDITIONAL WORK
LUMP SUM PROPOSAL #4
May 10, 2017 Page 1 of 3
City of Nashua
Central Purchasing
229 Main Street
Nashua, New Hampshire 03060
RE: Nashua Wastewater Treatment Facility HVAC Upgrades
2 Sawmill Road
Nashua, N.H. 03060