Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P289

Finance Committee - Agenda - 6/7/2017 - P289

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
289
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

16010-1
SECTION 16010

ELECTRICAL - GENERAL

PART 1 - GENERAL

1.1

DESCRIPTION

A.

Provide all labor, materials, equipment, operations, methods and procedures as
indicated in the Contract Documents, together with all items necessary for or
incidental to the completion of the work.

All systems or additions to existing systems indicated in the Contract Documents

shall mean all necessary supervision, labor, equipment and materials required to

provide complete, properly functioning systems.

All systems shall be adjusted, tested, inspected and turned over to the Owner in

perfect working order.

The words "provide", "supply", "supply and install", "install", "furnish" or "furnish

and install", as used in DIVISION 16 or as indicated on the Drawings related to

DIVISION 16 shall mean a complete and properly functioning Electrical installation

performed by the Contractor.

1. Refer to Architectural, Structural, Heating and Ventilating, Plumbing, Process
Piping and Instrumentation Drawings to coordinate material and equipment
locations and electrical requirements.

2. Applicable portions of DIVISION 0 - BIDDING AND CONTRACT
REQUIREMENTS together with DIVISION 1 - "GENERAL
REQUIREMENTS", are part of DIVISION 16.

3. Refer to "SECTION 01630 - SUBSTITUTION AND PRODUCT OPTIONS",
for work affecting DIVISION 16. Refer to SECTION 00100 -
INSTRUCTIONS TO BIDDERS; SECTION 00700 - GENERAL
CONDITIONS: SECTION 00800 - SUPPLEMENTARY CONDITIONS; and
as specified herein regarding substitutions of materials and equipment.

4. Definitions indicated in the "GENERAL CONDITIONS',
"SUPPLEMENTARY CONDITIONS", "INSTRUCTIONS TO BIDDERS"
and "SUPPLEMENTARY INSTRUCTIONS TO BIDDERS" are part of
DIVISION 16, unless otherwise noted.

Division 16 Contract Requirements and Responsibilities:

1. The requirements of Division 16 - Electrical is based on the information
provided in the Contract Documents. This information has been outlined in
either the specifications or the drawings or both. The contractor's responsibility
of Division - 16 Electrical is to review all information in both the specifications
and the drawings in order to determine the complete work required. Whether
the work is specified in the Specifications or shown on the Drawings it is
required as part of the work. No additional compensation or interpretations
stating that it was not shown in both locations will be acceptable or allowed.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P289

Footer menu

  • Contact