Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P291

Finance Committee - Agenda - 6/7/2017 - P291

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
291
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

16010-3
ELECTRICAL - GENERAL

e. Provide complete branch circuit wiring systems including all raceways,
conductors, cables, outlet and junction boxes, wiring devices and device
connections as shown on the Drawings and as specified herein.

G. Work Specified Elsewhere:

1.

2.

The materials and methods used for all Electrical Work indicated in the

Contract Documents shall meet the requirements specified in Division 16.

The following Electrical Work and Work relating to the Electrical Work will

be performed under other Divisions of the Contract Documents. This

Contractor is to review all of the Contract Documents and Drawings and shall

work closely with the other related areas which will affect his/her work under

this Contract in order to avoid any and all conflicts:

a. Substitutions, product options, cleaning up and project record documents
are specified in DIVISION 1.

b. Painting is specified in DIVISION 9.

c. Mechanical equipment is specified in DIVISION 15

d. Firestops are specified in DIVISION 7.

H. Removals and Relocations and Rearrangements:

1.

Examine the existing site, structure(s) and installation(s) for the work of all
trades which will influence the cost of the work under DIVISION 16. This
work shall include removals, relocations, rewiring and rearrangements relating
to the work of all trades which may interfere with, disturb or complicate the
performance of the work under DIVISION 16; and relating to the work
involving systems, equipment and related service lines which shall continue to
be utilized as part of the finished project.

When the Contract Documents indicate elimination of, or structural changes in

walls, floors, ceilings, enclosures, pipe chases, etc., remove, relocate, rearrange

and reconnect as required, all existing Electrical Work such that systems to
remain shall continue to function properly.

Provide in the Base Bid all associated labor, material and costs to include all

removals, relocations, rewiring, rearrangements and reconnections herein

specified, necessary or required to provide approved operation and coordination
of the combined new and existing systems and equipment.

Demolition:

a. Disconnect and remove existing equipment, devices, boxes, conduit, and
associated electrical equipment as shown on the contract drawings.

b. Any demolition, relocation or rearrangement work performed which results
in unused openings in control panels, instrument panels, control stations,
pull or junction boxes, etc., which are to remain shall be plugged by
appropriate means such that it maintains the integrity of the NEMA
classification of the area, as defined on Drawing E-1.

c. Any demolition, relocation or rearrangements which results in unused
openings in walls, ceilings, floors, etc. shall be sealed using approved
methods to maintain the fire rating and NEMA classification of the existing
structure.

d. Review all Contract Documents and coordinate with all disciplines for a
complete understanding of this demolition work. Provide all new work

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P291

Footer menu

  • Contact