5. Q:
R:
6. Q:
R:
7. Q:
R:
13089K
Clarify if offices will be relocated while installing lights and new ceilings. Will contractor be
responsible for relocating things, installing temporary heaters and or AC units?
The personnel and their essential office items (paperwork, computers, files, etc.) will be relocated
during the construction. The office furniture will stay in the offices and the contractor will be required
to cover all office furniture and items with plastic and move these things as necessary and move back
once completed. Per specification 01010A Summary of Work, part 3.1.A.1 it states the following “The
General Contractor shall furnish, install, and maintain a complete temporary heating, cooling and
ventilation systems, including fuel therefore, which will provide heating, cooling and ventilation as
required by the trades and for the protection of personnel in the work spaces, and stored and installed
materials from injury as can be caused by dampness and cold. The General Contractor shall employ,
within the terms of the General Contract, a competent watchman who will maintain and operate the
systems, as required. The General Contractor shall bear all costs incurred from the temporary heating
and ventilation from the time the systems are first required until the date of Final Completion of the
General Contract.”
Will control valves be replaced on SAHU-1A as a part of this contract?
No.
What is the height of the Control Building?
29’-7” to the top of the roof and 34’-4” to the top of parapet.
Addendum No. 1 Mach 31, 2017
Page 3 of 3