Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P622

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P622

16050-1

SECTION 16050

BASIC MATERIALS AND METHODS

PART 1 - GENERAL

1.1

DESCRIPTION

A.

Finance Committee - Agenda - 6/7/2017 - P621

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P621

3.1

3.2

3.3

16010-14
ELECTRICAL - GENERAL

INSTALLATION
A. Installation shall be as specified in the appropriate Sections of DIVISION 16.

TESTS
A. Refer to all related requirements as set forth within SECTION 16950 and additional
testing as indicated in the appropriate Sections of DIVISION 16.

CLEANING

A. Do not allow refuse and surplus materials to accumulate on the project site during
the course of the work. Areas shall be cleaned and picked up on a daily basis.

Finance Committee - Agenda - 6/7/2017 - P620

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P620

1.13

1.14

1.15

16010-13
ELECTRICAL - GENERAL

Finance Committee - Agenda - 6/7/2017 - P619

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P619

1.7

1.8

1.9

1.10

16010-12
ELECTRICAL - GENERAL

6. List of recommended spare parts.

RECORD DRAWINGS

A.

At the completion of the installation, provide reproducible Record Drawings
indicating the final configuration of all Electrical Systems as they were
installed. Symbols, equipment designations, etc. shall be consistent with the
Contract Documents. Provide exact locations of all work which has been concealed
in concrete, masonry or underground.

Finance Committee - Agenda - 6/7/2017 - P618

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P618

16010-11
ELECTRICAL - GENERAL

Finance Committee - Agenda - 6/7/2017 - P617

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P617

16010-10
ELECTRICAL - GENERAL

a. Project information as required by the contract specifications.

b. Contact page.

c. Index sheet - this sheet shall list each tab with a description of its contents,
i.e., Tab 1 - MCC 12.

d. Each tab shall be set up as follows:

(1) Pertinent project specific information and modifications associated
with this MCC, with references to the general information tab
number.

Finance Committee - Agenda - 6/7/2017 - P616

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P616

16010-9
ELECTRICAL - GENERAL

c. Index Sheet - Listing the equipment being submitted utilizing equipment
designations, or symbols, indicated on the Contract Documents together
with the proposed manufacturer, style/ type and catalog number.

d. Manufacturer's scale or dimensioned drawings along with standard catalog
"cut" sheets. These cut sheets shall be marked up to indicate equipment,
sizes, types, etc., of equipment and all options being provided.

e. Equipment ratings, service clearances and configuration.

Finance Committee - Agenda - 6/7/2017 - P615

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P615

16010-8
ELECTRICAL - GENERAL

submit a proposed substitution for review by the Engineer. The decision of
equality of a proposed substitution rests fully with the Engineer.

Certain new equipment and systems have been specified with one or more
make(s) WITHOUT the phrase "or equal". In such cases, only one of the
manufactured products listed will be allowed. No other manufacturer is
allowed.

Finance Committee - Agenda - 6/7/2017 - P614

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P614

1.3

16010-7
ELECTRICAL - GENERAL

American National Standards Institute.

National Electrical Code (NEC).

Local Power Company.

Local Telephone Company

. OSHA

Finance Committee - Agenda - 6/7/2017 - P613

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P613

16010-6
ELECTRICAL - GENERAL

Phase B - Red Phase B - Red/(Blue) Phase B - Brown
Phase C - Blue Phase C - Orange

e. For Conductors No. 6 and smaller, color coding shall correspond to the
color of the conductor insulation. For color coding of wire larger than
No. 6, use self-adhesive, wrap-around type markers. These markers shall
be used at all panelboards, junction boxes, disconnect switches, circuit
breakers, etc.

Pagination

  • Previous page ‹‹
  • Page 1387
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact