Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P632

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P632

16050-11
BASIC MATERIALS AND METHODS

Installation of Bushings and Grounding Bushings

1. Provide grounding type insulated bushings on all power conduits regardless of
size.

2. Provide grounding type insulated bushings on all control conduit sizes and
signal conduit sizes one and one-quarter inch (I-1/4") trade size and larger.

3. Provide standard bushings for conduits one inch (I") and smaller unless
otherwise stated.

Finance Committee - Agenda - 6/7/2017 - P631

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P631

16050-10
BASIC MATERIALS AND METHODS

approval for splicing prior to installation of feeder(s). Refer to Splicing
Methods listed below.

Do not pull conductors into raceways until raceway system, including all
outlets, cabinets, bushings and fittings, is completed. Verify that all work of
other trades which may cause conductor damage is completed. Use only
ULL. approved cable lubricants when necessary. Do not use mechanical means
to pull conductors No. 8 or smaller.

Finance Committee - Agenda - 6/7/2017 - P630

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P630

8.

16050-9
BASIC MATERIALS AND METHODS

i. | Used for whips for concealed lights above hung ceiling limited to 3'
in length.

ii. Within studded concealed wood frame walls for receptacles and light
switching.

All signal wiring shall be installed in rigid galvanized steel or PVC coated rigid
galvanized steel conduit.

C. General Raceways Installation Requirements:

1.

ao

10.

11.

12.

13.

14.

Finance Committee - Agenda - 6/7/2017 - P629

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P629

16050-8
BASIC MATERIALS AND METHODS

12) Heavywall aluminum conduit. Galvanized heavy duty rigid steel conduit as

approved by the Engineer.

Wiring 600 volts or less in dry concealed locations [hung above ceilings, attic

areas, or within CMU block walls] (NEMA 1 or 12): Galvanized electrical

metallic tubing (for raceway sizes up to and including 2" trade size) or
galvanized rigid heavy wall steel conduit.

Wiring 600 volts or less in dry exposed indoor locations (NEMA 1 or 12): Rigid

Finance Committee - Agenda - 6/7/2017 - P628

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P628

16050-7
BASIC MATERIALS AND METHODS

a. Safety switch enclosures for non-hazardous locations painted galvanized
steel for NEMA 12 area and stainless steel for NEMA 4X areas.

b. Switches specified as NEMA 7 & 9 shall be furnished in cast aluminum
enclosures with conduit provisions as specified. Enclosures shall be
provided with a bolted cover and with sealing means for hazardous location
protection. "ON" and "OFF" position identification shall be cast into the
cover, not painted on or applied with an adhesive.

Finance Committee - Agenda - 6/7/2017 - P627

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P627

16050-6
BASIC MATERIALS AND METHODS

Finance Committee - Agenda - 6/7/2017 - P626

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P626

7.

8.

16050-5
BASIC MATERIALS AND METHODS

Approved manufacturers shall be: Rob Roy Plasti Bond, Thomas & Betts-
OCAL or equal.

All fittings shall be of the same material as the respective raceway system.

B. Conductors and Cable

1.

All power wiring conductors (P-X on drawings) shall be insulated for 600 volts,

Type XHHW insulation, unless otherwise noted. Conductors shall be standard

AWG and KCMIL sizes. Conductors shall be 98 percent copper, stranded, heat

Finance Committee - Agenda - 6/7/2017 - P625

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P625

16050-4
BASIC MATERIALS AND METHODS

Finance Committee - Agenda - 6/7/2017 - P624

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P624

SNADMS

9

10.
Submit Shop Drawings per SECTION 16010.
Submit test results on all feeder conductors and heat trace cables as specified in

goa

16050-3
BASIC MATERIALS AND METHODS

Control Devices and Equipment

Motor Starters

Safety Disconnect Switches

Lighting Fixtures

Lighting flexible hangers

Conduit and wall and floor link seal fittings
Conduit cable sealing fittings

SECTION 16950.

PART 2 - PRODUCTS

2.1 MATERIALS
A. Conduit, Raceway and Tubing

1.

Finance Committee - Agenda - 6/7/2017 - P623

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P623

1.2

1.3

16050-2
BASIC MATERIALS AND METHODS

electrical wiring. If, after installation of any equipment, piping, ducts, conduit, etc.,
it is determined that ample maintenance and passage space has not been provided,
the work shall be rearranged and/or furnished with other equipment as required to
provide this space at no additional cost to the Engineer. The Contractor shall review
the drawings for all other trades to determine any potential interferences and identify
and coordinate with those with other trades.

Pagination

  • Previous page ‹‹
  • Page 1386
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact