Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P615

Finance Committee - Agenda - 6/7/2017 - P615

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
615
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

16010-8
ELECTRICAL - GENERAL

submit a proposed substitution for review by the Engineer. The decision of
equality of a proposed substitution rests fully with the Engineer.

Certain new equipment and systems have been specified with one or more
make(s) WITHOUT the phrase "or equal". In such cases, only one of the
manufactured products listed will be allowed. No other manufacturer is
allowed.

Where substitutions are allowed as "equal" it shall be the Contractor's
responsibility to make any and all necessary modifications required to
accommodate the installation of the substituted item(s) at no additional cost to
the Owner.

The Drawings have been designed and shown with a basis of design being of a
specific vendor. This Contractor shall understand that if the submission is by
another vendor to be considered as an equal then it shall be his/her responsibility
to provide a system which will be thoroughly coordinated to meet the intended
design. Any additional equipment, conduit, wiring, controls, etc., required to
make the final installation "as equal" will be the responsibility of the Contractor
and shall be included at no cost to the Owner.

Systems submitted which require extensive work in order to review will be
rejected or the Contractor shall be accessed additional costs for additional
resubmissions required for obtaining no exceptions by the engineer for the
equipment to be considered as an acceptable equal submission.

1.5 SHOP DRAWINGS
A. General:

1.

2.

Submit Shop Drawings in accordance with General Conditions and as indicated

herein.

Shop Drawings shall be submitted on all items of equipment and systems as

indicated in related sections of DIVISION 16.

Shop Drawings submitted by equipment vendors shall be thoroughly checked

by the Contractor for compliance and completeness with the Contract

Documents prior to being submitted to the Engineer for review as follows:

a. Verify that all equipment and materials proposed to be furnished will fit into
the available space.

b. All required or specified clearances are maintained

c. All equipment is compatible with the general building construction of the
areas into which they are to be installed.

The submittal of any Shop Drawing implies that the Contractor has reviewed

this Shop Drawing and that the above requirements have been met.

Shop Drawings submitted shall be complete and in its entirety in one bound

notebook as required by Specification 01340. For example, Specification

16050 Basic Materials shall include all items in this specification which will be

required for this project. Except in special instances, previously agreed to by

the Engineer, partial submittals will not be reviewed or accepted.

B. Shop Drawings:

1.

Shop Drawings Shall Consist of:
a. Project name and location.
b. Contractor's name.

13089K