Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P617

Finance Committee - Agenda - 6/7/2017 - P617

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
617
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

16010-10
ELECTRICAL - GENERAL

a. Project information as required by the contract specifications.

b. Contact page.

c. Index sheet - this sheet shall list each tab with a description of its contents,
i.e., Tab 1 - MCC 12.

d. Each tab shall be set up as follows:

(1) Pertinent project specific information and modifications associated
with this MCC, with references to the general information tab
number.

(2) A parts list of all items/devices and accessories associated with this
MCC including starters, relays, controls, fuses, etc.

(3) A project specific nameplate data sheet for the MCC - this shall
include, but not limited to, full project specific title descriptions,
starter/feeder information and submitted wiring diagram number.

(4) Dimensioned MCC layout plans and elevations pertaining only to this
MCC.

(5) Project specific MCC one line diagram.

(6) A complete set of project specific wiring diagrams for all loads
associated with this MCC. Wiring diagrams shall include the
following general information: The full project specific title of the
load served and the submitted applicable compartment number. If
more than one motor of a specific load within the applicable MCC is
indicated then separate and identified wiring diagrams shall be
submitted for each load description and compartment number. All
wiring diagram information and notation shall be clearly defined and
referenced. Common wiring diagrams will not be acceptable.

2. As shown, this format is set up for a motor control center submittal, however,

the same format shall be used for all switchboards, control panels, lighting

panels etc.

Each submittal shall be neatly bound with typewritten index sheets.

4. Each control panel, system or equipment package shall be submitted in its
entirety with all associated controls, devices, panels, layouts, wiring diagrams
etc., included.

5. Ifthe contractor relies on the equipment provider to submit this information, it
shall be the Contractor's responsibility to ensure the format is as noted above.
Submittals which do not clearly indicate, in an organized manner, what is being
provided will be rejected, without being reviewed, for the submittal.

6. Equipment submitted which will be used throughout the facility, such as Local
Control Stations, junction boxes, conduit, panels etc., shall clearly indicate
which areas these will be located or used for, either on the submittal or a cross
referenced list i.e., PVC conduit - Chemical Room, or screw type covered
stainless steel enclosure - pullbox in NEMA 4X environments, etc

wo

1.6 SUBMITTALS TO THE ENGINEER
A. Provide all certificates of inspection and approval from all regulatory agencies
having jurisdiction over the Work under Division 16.
B. Maintain properly documented and witnessed test and checkout reports and submit
these to the Engineer prior to energizing the Electrical system.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P617

Footer menu

  • Contact