Finance Committee - Agenda - 3/20/2019 - P385

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P385

SECTION 08712

DOOR HARDWARE

PART 1 - GENERAL

1.1.

1.2.

1.3.

1.4.

SECTION INCLUDES

A. Hardware for doors.

B. Thresholds.

C. Weatherstripping.

COORDINATION

A. Coordinate work of this Section with other directly affected Sections
involving manufacturer of any internal reinforcement for door hardware.

QUALITY ASSURANCE

A. Manufacturers - Companies specializing in manufacturing of door hardware
shall have minimum of five years’ experience.

Finance Committee - Agenda - 3/20/2019 - P384

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P384

8. In areas where a threshold is provided the clearance between the bottom
of the door and the threshold shall not exceed 34-inch. Where a threshold
is not provided, the clearance at the bottom of the door shall be a
maximum of %4-inch.

3.2 ADJUST AND CLEAN

Finance Committee - Agenda - 3/20/2019 - P383

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P383

C.

D.

Provide anchors as recommended by the manufacturer.

Door Silencers - Except on weather stripped frames, drill stops to receive
three silencers on strike jambs.

2.3. FINISH HARDWARE

A.

Secure templates from the finish hardware supplier, and accurately install, or
make provision for, all finish hardware at the factory.

Finance Committee - Agenda - 3/20/2019 - P382

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P382

2.2

B. Provide 1-%4-inch hollow metal doors of the type and size indicated on the
Drawings.

C. Fabricate exterior door, panels and frames from galvanized steel sheet ASTM
A653/A653M, G60 or A60.

D. Unless otherwise noted on the drawings, doors shall be reinforced with
impregnated kraft honeycomb core, laminated to the inside faces of both steel
panels.

E. Doors shall have continuous, vertical, interlocking joints at both the lock and
hinge edges. Both edges shall have visible seams.

Finance Committee - Agenda - 3/20/2019 - P381

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P381

SECTION 08100
METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY

A. Provide metal doors with frames, where shown on the Drawings, as specified
herein, and as needed for a complete and proper installation.

1.2 SUBMITTALS

A. Submit the following:

1. Materials list of items proposed to be provided under this Section.

2. Manufacturers’ specifications and other data needed to demonstrate
compliance with the specified requirements.

Finance Committee - Agenda - 3/20/2019 - P380

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P380

CONTENTS

DIVISION 8 — DOORS

Section 08100 - Metal Doors and Frames
Section 08712 - Door Hardware

SANBORN i HEAD

Finance Committee - Agenda - 3/20/2019 - P379

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P379

3.7

3.8

3.9

3.10

lower members with 10-penny nails, two near each end, and stagger 16 inches
on center intermediately between. Nail sole plates through the sills.

INTERIOR WALL SHEATHING

A.

B.

Finance Committee - Agenda - 3/20/2019 - P378

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P378

3.4

3.5

3.6

B.

D.

Joints shall be tight and constructed in a manner that will conceal shrinkage.
Miter trim and moldings at exterior angles and at returns. Material shall show
no warp after installation. Install millwork and trim in the maximum practical
lengths.

Fasten finish work with finish nails. Provide blind nailing where practicable. Set
face nails for putty stopping.

Install facia, soffits, trim boards, and soffit vents.

INSTRUMENT PANEL DOORS

A.

B.

Finance Committee - Agenda - 3/20/2019 - P377

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P377

PART 3 - EXECUTION

3.1

3.2

3.3

GENERAL

A.

Conform to NFP WCD1 unless otherwise indicated or specified. Fit framing
lumber and other rough carpentry, set accurately to the required lines and
levels, and secure in place in a rigid manner.

Do not splice framing members between bearing points. Set joists with the
crown edge up.

Finance Committee - Agenda - 3/20/2019 - P376

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P376

2.2

2.3

2.4

G.

a. Interior finish lumber, trim, and millwork that are 1%4-inches or less in
nominal thickness ~ 12 percent on 85 percent of the pieces and 15
percent on remainder.

b. Exterior treated or untreated finish lumber and trim that is 4 inches or
less in nominal thickness - 15 percent.

c. Other Materials - 19 percent.

Preservative Treatment of Wood Products