Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P379

Finance Committee - Agenda - 3/20/2019 - P379

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
379
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

3.7

3.8

3.9

3.10

lower members with 10-penny nails, two near each end, and stagger 16 inches
on center intermediately between. Nail sole plates through the sills.

INTERIOR WALL SHEATHING

A.

B.

Exterior grade plywood shall be applied with the sanded side facing into
building. Extend sheathing over and nail to sill and top plate. Abut sheathing
edges over centerlines of supports. Make cuts straight and even. Abut sides and
ends closely with no more than a %-inch gap between sheathes. If sheathing is
applied horizontally, stagger vertical end joints. Nail panels with 6-penny
galvanized nails spaced 6 inches on center along edges of the panel and 12
inches on center over intermediate supports. Install sheathing on walls and
ceiling.

Install interior trim around doors and other openings

BUILDING PAPER

A.

Install building paper where needed in accordance with the roofing and siding
manufacturer's instructions.

INSULATION AND ROOF VENTS

A.

D.

Install ceiling insulation and soffit vents between rafters. Install insulation in
walls and ceiling of sump riser building, but not panel boards.

Install insulation in accordance with manufacturer’s instructions. Ceiling
insulation should be installed with printed side against ceiling.

Surfaces shall be dry, and free of dust, dirt and debris prior to installation of
insulation. Remove and replace any insulation that becomes damaged or wet.

Install roof ridge vent in accordance with manufacturer's recommendations.

FRAMING TOLERANCES

A.

Framing members which will be covered by finishes such as plywood sheathing,
metal siding, and metal roofing shall be within the following limits:

1. Plates and sills - %-inch in 8 feet from a straight line;

2. Studs - %-inch in 8 feet out of plumb, not cumulative; and

3. Face of framing members - %-inch in 8 feet from a true plane.

[END OF SECTION 06210]

P:\3000s\3066.09\Source Files\Type II App\Specifications\Division 6 Specifications\06210 Wood Framing and Insulation.docx

File No. 3066.09 Wood Framing and Insulation 06210 - 6 of 6 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P379

Footer menu

  • Contact