Finance Committee - Agenda - 3/20/2019 - P425
providing needed coordination, CONTRACTOR shall relocate his work or make
other adjustments, as needed, at no additional cost to OWNER.
CONTRACTOR shall arrange to have its recessed equipment set in place ahead
of construction and shall assure, sufficiently in advance, the shape, size and
position of all openings required. In case of failure on the part of
CONTRACTOR to install recessed equipment as designed, CONTRACTOR shall
cut and patch as needed, with no additional cost to OWNER.
Coordinate electrical work with OWNER.
3.2. RACEWAYS