providing needed coordination, CONTRACTOR shall relocate his work or make
other adjustments, as needed, at no additional cost to OWNER.
CONTRACTOR shall arrange to have its recessed equipment set in place ahead
of construction and shall assure, sufficiently in advance, the shape, size and
position of all openings required. In case of failure on the part of
CONTRACTOR to install recessed equipment as designed, CONTRACTOR shall
cut and patch as needed, with no additional cost to OWNER.
Coordinate electrical work with OWNER.
3.2. RACEWAYS
A.
Raceways shall be installed neatly racked, routed parallel or perpendicular to
building lines, and securely attached and supported in accordance with NECA
“Standards of Installation.” Threaded GRS conduit must be wrench-tight to
fittings for proper grounding.
Support conduit using coated steel or malleable iron straps, lay-in adjustable
hangers, clevis hangers, and split hangers.
Group related conduits shall be supported using conduit rack. Construct rack
using galvanized steel channel assemblies or unistrut and single-bolt strap.
Provide space on each rack for 25 percent additional conduits.
Provide pull boxes as required or where excessive turns are encountered. At
exterior locations, install pull boxes flush with grade, on a structural base.
Use lubricants to facilitate wire pulling. Lubricant shall be UL listed for use
with the type of wire being installed.
Furnish and install pull wires in all spare conduits. Label each terminus.
3.3. WIRES AND CABLES
A.
Provide all wiring as indicated and/or required to each piece of equipment,
wiring device, lighting fixture, etc. shown on the Drawings.
All splices, taps, connections, terminations, etc., shall be made with appropriate
connectors in a workmanlike manner and in accordance with the NEC.
Provide suitable split-wedge cable supporting devices in each conduit riser, as
required to support vertical cables.
File No. 3066.09 Electrical Work 16000 - 6 of 7 December 2017