Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/20/2019 - P415

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P415

All concrete and masonry anchors shall be drilled expansion bolt type; power
driven fasteners will not be allowed. Expansion bolts shall be stainless steel.
Rawl-Bolt, Hilti or approved equal.

C. Pipe supports shall be fabricated from stainless steel. Supports shall generally
conform to the typical details shown on the Drawings. The dimensions shall be
modified as required to accommodate specific conditions.

2.7 LABELS
A. Labels shall be as indicated in Attachment A to this Section.

2.8 SIDESLOPE RISER BULKHEAD AND HARDWARE

A.

Finance Committee - Agenda - 3/20/2019 - P414

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P414

E.

leak-tight when the pipe is full, and provide a drip-tight seal at 2 psig and above.
Provide suitable seat material to assure drip-tight seal.

Valve body shall be constructed of cast iron. Float rod, float guide, and float shall
be stainless steel. Furnish valve body with factory applied epoxy lining.

Valve shall be equipped with 2-inch diameter NPT inlet and 2-inch diameter NPT
outlet.

Valve body pressure rating shall be 150 psig.

2.4 FLEXIBLE HOSE

A.

Finance Committee - Agenda - 3/20/2019 - P413

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P413

Pipe and fitting sizes shall be as indicated on the Drawings.

PVC valve bodies and fittings shall be Schedule 80, ASTM D1785, Type 1, Grade
1. Fittings shall be socket ends, ASTM D2467.

All flange hardware shall be stainless steel. Flange gaskets shall be 14-inch Viton,
full face.

2.2 VALVES

A.

Ball valves shall be true union design with socketed connections. Pressure
rating shall be 150 psig, Type I, Grade I PVC construction with Viton or PVDF
seats and seals. Full port opening. Asahi-America or approved equal.

Finance Committee - Agenda - 3/20/2019 - P412

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P412

SECTION 15310
SUMP RISER BUILDING PIPE, FITTINGS, AND APPURTENANCES
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Furnish and install all pipe, valves, and appurtenances in the Sump Riser
Building, including:
1. Polyvinyl chloride (PVC) pipe and fittings.
2. Check valves, regulating valves, shutoff valves, air release/vacuum relief
valves.
3. Labels.
B. Furnish and install blind flanges to sideslope risers.
C. Furnish and install vent piping.
D. Perform hydrostatic testing.

1.2 PRODUCT HANDLING

Finance Committee - Agenda - 3/20/2019 - P411

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P411

G. Acoating of CPS primer, as recommended by pipe supplier, shall be applied to
the entire interior surface of the fitting socket, and to an equivalent area on the
exterior of the pipe prior to applying solvent cement.

H. The solvent cement shall comply with the requirements of ASTM D2564 and
shall be applied in strict accordance with manufacturer’s specifications.

I. Pipe shall not be primed or solvent welded when it is raining, or when
atmospheric temperature is below 40°F, or above 90°F when under direct
exposure to the sun.

Finance Committee - Agenda - 3/20/2019 - P410

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P410

F, Fittings shall be industrial, heavy duty, hub style.

G. Socket fittings shall be pressure rated the same as the corresponding size pipe
prescribed by ASTM D1785. Threaded fittings shall be pressure rated to at
least 150 percent of the rating for socket fittings.

2.3. VALVES

A. Valves shall be flanged Type 21/21A PVC ball valves, manufactured by
Asahi/America, or approved equal, of the size indicated on the Drawings.

B. Valves shall be constructed with the following materials:

1. Body - polyvinylchloride (PVC)

Finance Committee - Agenda - 3/20/2019 - P409

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P409

SECTION 15212

POLYVINYL CHLORIDE (PVC) PIPE, VALVES, AND FITTINGS

PART 1 - GENERAL

1.1

1.2

1.3

SCOPE OF WORK

A. CONTRACTOR shall provide all labor, materials, tools, and equipment, and
perform all operations necessary to furnish and install the polyvinyl chloride
(PVC) pipe and fittings as specified herein and as shown on the Drawings or as
required by ENGINEER or OWNER.

SUBMITTALS

Finance Committee - Agenda - 3/20/2019 - P408

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P408

MAXIMUM ALLOWABLE MAKE-UP WATER VOLUME

Finance Committee - Agenda - 3/20/2019 - P407

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P407

ATTACHMENT 1 TO SECTION 15210
HYDROSTATIC PIPE PRESSURE TEST LOG

Project No.:
Project Name:
SANBORN ||| HEAD , ,
- ; Project Location:
Building Trust. Engineering Succe.
Weather
Contractor: Test No.

Sanborn Head Personnel:

Person/Company Performing the Test:

Date of Test: Time of Test: Start: Finish:
Pipe Length: ft. Pipe Diameter: in. Pipe Material: Pipe SDR/Sch.::
Rated Working Pressure: Test Pressure:

Location/designation of pipe tested:

Finance Committee - Agenda - 3/20/2019 - P406

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P406

8.

9.

Apply test pressure slowly, and once the test pressure has been reached,
allow the pressure to stabilize, without adding additional pressure. This
may take 2 to 3 hours.

Once pressure has stabilized, add additional water to achieve the test
pressure and begin the test.

After 1 hour, additional water shall be added to return to the test
pressure. If the volume of water required to achieve the test pressure
after 1 hour is less than shown in the table, then the pipe has passed the
pressure test.

Pagination

  • Previous page ‹‹
  • Page 674
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact