B. CONTRACTOR shall use the current edition of the above codes, regulations and
standards enforced at the Site by local authorities having jurisdiction.
PERMITS AND FEES
A. CONTRACTOR shall obtain all necessary permits, licenses or certificates of
approval. CONTRACTOR shall pay all fees required by, and conform to, all
local, state and federal laws and regulations governing the Work. At the
conclusion of the Work, CONTRACTOR shall furnish ENGINEER with
certificates of inspection from all authorities having jurisdiction.
TEMPORARY LIGHT AND POWER
A.
Temporary light and power shall be installed and maintained under this
Contract for use by all trades for the duration of construction, complete with
all wiring, switches, protective devices and similar equipment as may be
required.
GUARANTEE
A.
CONTRACTOR shall and does hereby warrant and guarantee that all work
executed under these Specifications will be free from defects of materials and
workmanship for a period of one (1) year from the date of Certificate of
Substantial Completion.
CONTRACTOR shall further warrant that all materials furnished and work
executed are in accordance with all applicable laws, regulations, and Codes.
CONTRACTOR shall submit to OWNER, all applicable equipment warranty
registrations complete with the date and place of purchase.
SYMBOLS
A.
Symbols on Drawings show approximate location of fixtures, outlet boxes and
other equipment. Unless otherwise detailed, the exact location shall be
governed by structural conditions, obstructions, architectural and equipment
drawings. This is not to be construed to permit redesigning systems. All
outlets shall be interconnected as shown on the Drawings. Locate and install
all boxes and equipment where they will be readily accessible.
WORKMANSHIP
A.
All Work shall be executed in a workmanlike manner by experienced
electricians licensed by the State of New Hampshire, in accordance with the
most modern engineering practice and shall present a neat appearance when
completed. The Work shall be carefully laid out in advance, and where cutting,
channeling, chasing or drilling of floors, walls, partitions, ceilings or other
File No. 3066.09 Electrical Work 16000 - 2 of 7 December 2017