A. Panelboards shall be as specified on the Drawings.
2.8. GROUNDING
A. All new equipment, devices, systems and structures, whether shown or
detailed on the Drawings, shall be grounded in accordance with Article 250 of
the National Electrical Code.
B. All electrical equipment and motors shall be grounded by an equipment
grounding conductor installed with the power conductors.
C. New Electric Service shall be grounded and bonded in accordance with the
National Electrical Code and Utility requirements.
2.9 WIRING DEVICES
A. Wiring devices shall be as indicated on the Drawings.
2.10 ELECTRIC HEATER
A. Heater and thermostat shall be as indicated on the Drawings.
2.11 LIGHTING FIXTURES
A. Lighting fixtures shall be as indicated on the Drawings complete with lamps
indicated.
PART 3 - EXECUTION
3.1 COORDINATION
A. The drawings are diagrammatic and indicate the general arrangement of
systems, equipment and the extent of the work and may not necessarily be to
scale. CONTRACTOR shall make reasonable adjustments in fixture and
equipment locations to suit field conditions at no additional cost to OWNER.
B. CONTRACTOR shall connect to and/or provide all electric power, outlets,
devices, fixtures, pull boxes and control wiring for all equipment shown on the
Drawings. All electrical wiring shall be in accordance with the manufacturer's
requirements.
C. CONTRACTOR shall fully coordinate the Work. CONTRACTOR shall furnish any
and all information, in writing, that is needed for the coordination of
clearances, etc., with the work of others, and such information shall be given in
a timely fashion, so as not to impede the progress of other trades.
CONTRACTOR shall confer and resolve all conflicts immediately. If so directed
CONTRACTOR shall prepare composite drawings to resolve any space or
clearance conflict. If CONTRACTOR installs materials and equipment before
File No. 3066.09 Electrical Work 16000 - 5 of 7 December 2017