Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/6/2020 - P111

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P111

THE CITY OF NASHUA “The Gate City’

Administrative Services

Purchasing Department

April 30, 2020
Memo #20-104

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: ENERGY RECOVERY UPGRADES — CHANGE ORDER 6 (VALUE: $5,619)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from David L. Boucher, Superintendent Wastewater Department

dated April 23, 2020 for the information related to this contract.

Finance Committee - Agenda - 5/6/2020 - P110

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P110

Gross Margin Percent @15%: $347.25

Total: $2,725.50

Reservation of Rights

This price does not include any amount for impacts such as interference, disruptions, rescheduling, changes in
the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our
request for any of these items.

Signed By: Dated: 1/3/2020

Finance Committee - Agenda - 5/6/2020 - P109

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P109

MAIN OFFICE BRANCH OFFICE
397 Whittier Highway 92308 American Legion Hwy

Electrical Moultonboro, NH 03254 Westport, MA 02790
Installati ons Tn c 603-253-4525 608-636-8600
ee eth cman FAX 603-253-6284 FAX 508-636-8650
Engineering: Construction - Cartrat Systems

a Heulisndeen, NH 2 VT License EM-2667 ME License 7905 NHLicense 460 MA License 221MR

Potential Change Order Request

18101 —- Nashua, NH - WWTF Primary Tank Upgrade Subject: PLC Processor upgrade for
(DB Rates) required {/O
To Anthony Crespo Number: 481701-C0-003

Finance Committee - Agenda - 5/6/2020 - P108

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P108

PLC Processor Upgrade

Scope: The A-B1769L33ER is the processor that was spect and will not work with ihe /O required in PLC-8.

A-B1769L.36ERM is what is need to complete the PLC programming.

4-SUPPLEMENTAL COSTS

DESCRIPTION

UILT DRAWINGS

QTy RATE UNIT SUBTOTAL

§-TOTAE (Item 8 + Bond + General Liability)

Finance Committee - Agenda - 5/6/2020 - P107

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P107

Doc #: PCO8
Ref. Document:
PROJECT NAME: Date: 9-Jan-20
Nashua Primary Tank Upgrades
PROJECT NO: 181016
PHASE
COST SUMMARY SHEET
PLC Processor Upgrade
A Nic Labor (Recap Sheet): $0.00
B WiC Materials, & Equipment (Recap Sheet): $0.00
c MC Fee (A x 15%) + (B x 15%): $0.00
DB Subtotal MIC Work (A+B+C): 75 -
E Total Subcontractors (Below): $2,725.50
F MC Mark-up on Subconiractor Work (5%, 7.5% or 16%): | $ 237.00
G Bond (1%} and General Liability (1%): $59.25
Total Proposal (D+E+F+G): $ 3,021.75

Finance Committee - Agenda - 5/6/2020 - P106

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P106

Roadway Excavators Inc. » | Estimate 1968
Derry NH 03038 De
603-235-3740

Roadwayexcavates@ aol.com
Estimate To

Methuen Construction
Don Reynolds

Property Address

2 Sawmill st Nashua NH.

Quantity | Description; & , - Amount

° Additional electrical trenches due to
interference with other underground utilities. 3500.00

Finance Committee - Agenda - 5/6/2020 - P105

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P105

Bid Proposal for Nashua, NH - 6" Material

METHUEN CONSTRUCTION CO INC
Bid Date: 12/28/2019
Core & Main 1151853

Core & Main

83 Progress Ave
Springfield, MA 01104
Phone: 413-732-8406
Fax: 413-732-8411

Seq# Qty Bescription

Units Price Ext Price

QO 6 N12 AASHTO STIB SOLID. 20' DUAL. WALL 0615002018

: Branch Terms:

0.00 :

‘Jotal =: 137.34

Finance Committee - Agenda - 5/6/2020 - P104

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P104

CB-1, Credit DMH-1.

Relocate Electrical Building Deductions

Scope: Credit Note 3 (Abandon LPA). Credit Note 2 Hydrant is special order and is not returnable. Credit

Finance Committee - Agenda - 5/6/2020 - P103

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P103

Electrical Building Relocation

Scope: Original excavation to find unknown electrical duct bank. Re-Excavation for new location of building and New utility trench
locations, Core new hele and connect drainage to existing storm drain structure. Remove existing siairs (Reinstall of stairs is not
covered in this PCO). Install new grout between new electrical building and stair tower, Site work costs credits for this PCO include
removing all pavement requested in RFP 4 as well as all Contract pavement (not completed already} shown on contract drawing C-
4

Finance Committee - Agenda - 5/6/2020 - P102

By dnadmin on Mon, 11/07/2022 - 13:31
  • Read more about Finance Committee - Agenda - 5/6/2020 - P102

Electrical Building Relocation
Scope: Criginal excavation to find unknown electrical duct bank. Re-Excavation for new location of building and New utility irench
locations. Core new hole and connect drainage to existing storm drain structure. Remove existing stairs (Reinstall of stairs is not
covered in this PCO). Install new grout between new electrical building and stair tower. Site work costs credits for this PCO include
removing all pavement requested in RFP 4 as well as all Contract pavement (not completed already) shown on contract drawing C-
4

Pagination

  • Previous page ‹‹
  • Page 401
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact