PLC Processor Upgrade
Scope: The A-B1769L33ER is the processor that was spect and will not work with ihe /O required in PLC-8.
A-B1769L.36ERM is what is need to complete the PLC programming.
4-SUPPLEMENTAL COSTS
DESCRIPTION
UILT DRAWINGS
QTy RATE UNIT SUBTOTAL
§-TOTAE (Item 8 + Bond + General Liability)
$0.00
$0.00
ENGINEERING
LEGAL
VEL 50.00
$0,00
STORAGE
& WATER 50.00
$0,00
$0.00
ELECTRICITY
OFFICE EQ
50
SUBTOTAL $0.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $0.00
6-GC WORK TOTAL
SUBTOTAL {Item 1+2+3+4) $0.00
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST QTy COST TOTAL
Ls 60
Ell- Material
Ell- $355.50
SUBTOTAL $2,370.00
SUBTOTAL WITH MARKUP $2,725.50
8-FEE
GC (15% X Items 1&5 + 15% X Iems 2&3&84 + 5%, 7.5% or 1076 X ftem 7, $237.00
8-SUBTOTAL $2,962.50
BOND (1% X Htem3) $29.63
GENERAL LIABILITY (1% X Item &) $29.63
$3,021,75
Page 3 of 3
1/9/2620 - 9:33 AM