Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/6/2020 - P103

Finance Committee - Agenda - 5/6/2020 - P103

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
103
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Electrical Building Relocation

Scope: Original excavation to find unknown electrical duct bank. Re-Excavation for new location of building and New utility trench
locations, Core new hele and connect drainage to existing storm drain structure. Remove existing siairs (Reinstall of stairs is not
covered in this PCO). Install new grout between new electrical building and stair tower, Site work costs credits for this PCO include
removing all pavement requested in RFP 4 as well as all Contract pavement (not completed already} shown on contract drawing C-
4

SUBTOTAL $7,025.00

GC MARKUP (typically 10%) x (Subcontractor cost/1.15) $610.87
8-FEE

GC (15% X ttems 7165 + 15% X Items 28384 + 5%, 7.5% or 10% X Item 7} $1,356.14
8-SUBTOTAL $13,349.58
8-SUBTOTAL WITH CREDIT $5,153.79

BOND (1% X item8) $51.54

GENERAL LIABILITY (1% X Htem 8) $51.54
9-TOTAL (item & + Bond + General Liability) $5,256.86

Page 3 of 4 3/13/2020 - 12:20 AM

Page Image
Finance Committee - Agenda - 5/6/2020 - P103

Footer menu

  • Contact