Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/17/2021 - P214

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P214

@ONashua

January 12, 2021

ares, So
wot me aan

Finance Committee - Agenda - 3/17/2021 - P213

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P213

City of Nashua, New Hampshire
Division of Public Works
IFB0660-021121
2021 Paving Program - Residential Roadways

Finance Committee - Agenda - 3/17/2021 - P212

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P212

City of Nashua, New Hampshire
Division of Public Works

IFB0O660-0211 21

2021 Paving Program - Residential Roadways

Finance Committee - Agenda - 3/17/2021 - P211

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P211

DIVISION 7

LIST AND MAP OF ROADWAYS

Finance Committee - Agenda - 3/17/2021 - P210

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P210

29.

30.

D. If in the opinion of the CONTRACTOR, construction of an ADA compliant ramp is
not possible at any location the CONTRACTOR shall notify the ENGINEER in
writing in advance of any construction activities at that location. Unless notification
of any such concerns is made to the ENGINEER, CONTRACTOR shall be singularly
responsible for the ADA compliance of the finished work.

Finance Committee - Agenda - 3/17/2021 - P209

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P209

24.

25.

26.

27.

28.

Failure to promptly restore existing property and structures including, but not limited to
driveways and lawns, may result in the ENGINEER’s determination that associated work
is not complete and therefore not eligible for progress payment. Such associated work
may include, but not be limited to paving, pipe installation, catch basins, manholes and
curbing.

Unless specifically agreed to in advance, driveway tie-ins will be paved concurrent with
top course paving operations.

Finance Committee - Agenda - 3/17/2021 - P208

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P208

20.

21.

22.

23.

The CONTRACTOR shall plan in advance of forecasted inclement weather events and
shall assign crews to perform maintenance of unpaved areas open to traffic during and
after inclement weather events. CONTRACTOR is responsible to coordinate with the
ENGINEER and other City officials as appropriate.

CONTRACTOR shall be prepared to respond in a timely manner if the City determines
that circumstances warrant action when the CONTRACTOR is not onsite.

Finance Committee - Agenda - 3/17/2021 - P207

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P207

17.

18.

19.

Regardless of action that may be taken or not taken by the ENGINEER, the
CONTRACTOR shall be solely responsible for the appropriateness, reflectivity and
condition of all materials provided as well as placement and maintenance of traffic
control elements.

The CONTRACTOR shall submit a Traffic Control Plan prior to work on arterial
roadways. This Traffic Control Plan will describe how the CONTRACTOR proposes to:

Finance Committee - Agenda - 3/17/2021 - P206

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P206

15.

16.

Qualified Superintendent(s) shall be assigned for all crews. Contact information will be
provided for all Superintendents.

USE OF GROUNDS

Finance Committee - Agenda - 3/17/2021 - P205

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P205

11.

12.

13.

14.

ADJUSTMENT OF MANHOLES
Manholes shall be adjusted so that finished paving shall be flush with the manhole.

In the instance when manholes are set lower than adjacent pavement by an amount equal
to or greater than 2 inch measured with use of a straight edge, the ENGINEER will at
their sole discretion either require the structure to be readjusted at the CONTRACTOR’s
expense or not make any payment to the CONTRACTOR for the adjustment of the
structure.