Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P206

Finance Committee - Agenda - 3/17/2021 - P206

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
206
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

15.

16.

Qualified Superintendent(s) shall be assigned for all crews. Contact information will be
provided for all Superintendents.

USE OF GROUNDS

Any area outside the limits of the project area (right-of-way within project limits) which
the CONTRACTOR may require for storage of equipment and materials, or for other
purposes necessary in the performance of the Work, shall be secured by the
CONTRACTOR at their own expense. Materials, including excavation intended for
backfill, shall not be stored or stacked within any roadway clear zones, or in a manner
that obstructs adequate sight lines unless specifically permitted in writing by the
ENGINEER. The CONTRACTOR is responsible for providing security as required and
erosion controls at no cost to the City.

TRAFFI TROL PLA
Reference is also made to Section 17.07 Road Closures and Traffic Delays of the
General Conditions.

The following are considered part of the Traffic Control Plan:

1. Section 618 and 619 of the Standard Specifications.

2. Work Zone Traffic Control Standard Sheets*

3. Manual on Uniform Traffic Control Devices, (MUTCD), 2009 Edition,
including all current updates and official interpretations.

4. Positive Protection Guidance for Work Zones (PPGWZ)*

5. Flagger and Uniformed Officer Use in Work Zones Policy and Guidelines*

* Available online under Doing Business with DOT>CONTRACTORs at www.nh.gov/dot
or through the NHDOT Contracts office (603-271-3732).

The CONTRACTOR shall provide necessary traffic control devices to ensure the safety of
the workers, traveling public, and property owners on this project. The above referenced
specifications, guidelines, and provisions herein provide minimum requirements; the
CONTRACTOR may be directed to expand upon the Traffic Control Plan if conditions
warrant.

All signs, channelizing devices and arrow boards as required by the Manual on Uniform
Traffic Control Devices, including part six, as amended, and the above Standard Sheets
shall be in place prior to moving any equipment onto the pavement.

The CONTRACTOR shall provide trained personnel, including Uniformed Officers and
Flaggers in accordance with Section 618, to be responsible for the maintenance of traffic.

The CONTRACTOR shall be responsible to assure that all materials furnished and used
for maintenance of traffic are certified for reflectivity. The CONTRACTOR shall
replace damaged devices without additional compensation. Although the ENGINEER
may direct the CONTRACTOR to replace damaged devices, the CONTRACTOR has
full responsibility to inspect all materials and devices for maintenance of traffic and
correct any deficiencies on a daily basis.