Finance Committee - Agenda - 6/7/2017 - P437

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P437

01045-1
SECTION 01045

CUTTING, CORING AND PATCHING

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included - This section establishes general requirements pertaining to cutting,
excavating, coring, fitting, and patching of the Work required to:

1. Make alterations to existing structures.

2. Make the parts fit properly.

3. Replace work not conforming to requirements of the Contract Documents.

Finance Committee - Agenda - 6/7/2017 - P436

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P436

O01010A-4
SUMMARY OF WORK

shall be accomplished in strict accordance with applicable codes and standards and
the stricter of the Contractor's or Owner’s lock-out/tag-out procedures.

The Contractor shall have all materials and equipment on-site, and shall receive the
Owner's approval, prior to initiating work which will disrupt the facilities thermal
comfort and indoor air quality in occupied spaces.

Finance Committee - Agenda - 6/7/2017 - P435

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P435

3.2

O1010A-3
SUMMARY OF WORK

5. | The Contractor shall limit his personnel to the proposed work areas and limits
of work.

B. — Construction access.

1. Free open space around the Control Building is limited. As directed by the
Owner, the Contractor may use the temporary parking lot, for construction
trailers, employee parking, material storage and lay down. The Contractor
shall install fencing around the staging area.

Finance Committee - Agenda - 6/7/2017 - P434

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P434

O1010A-2
SUMMARY OF WORK

e. Other appurtenances as shown on the Drawings and specified herein.
4. Remove and/or relocate equipment as indicated on the Drawings.
B. Related Work Specified Elsewhere:

1. Coordination: Section 01050

2. Construction Schedules: Section 01310.
C. Removals, Relocations and Rearrangements

Finance Committee - Agenda - 6/7/2017 - P433

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P433

PART 1 - GENERAL

1.1 DESCRIPTION

OLO10A-1

SECTION O1010A
SUMMARY OF WORK

A. Work Included: Upgrading the City of Nashua, New Hampshire Headwork’s
Facilities at the main Wastewater Treatment Facility (WWTF). The major
proposed work under this Contract includes:

Construction of:

1.

a.

b.
C.

Se Os TART eo moe

mead

e

Sludge Processing Building Pump Room Air Handling Unit (SAHU-
1A),

Finance Committee - Agenda - 6/7/2017 - P432

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P432

Nashua Police Department: (603) 594-3500

Nashua Fire Department: (603) 594-3652
School Bus Garage: (603) 594-4300
Nashua Solid Waste Department (603) 589-3410
Nashua Building Department (603) 589-3080

17.08 Prohibited Interests

Finance Committee - Agenda - 6/7/2017 - P431

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P431

17.02 Computation of Times

A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first
and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day
made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation.

17.03 Cumulative Remedies

Finance Committee - Agenda - 6/7/2017 - P430

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P430

In the event of a termination for cause, CONTRACTOR shall receive all amounts due and not previously paid to
CONTRACTOR for work satisfactorily completed in accordance with the contract prior to the date of the notice, less
all previous payments. No amount shall be allowed or paid for anticipated profit on unperformed services or other
unperformed work. Any such payment may be adjusted to the extent of any additional costs occasioned to the
OWNER by reasons of CONTRACTOR's failure. CONTRACTOR shall not be relieved of liability to the OWNER for

Finance Committee - Agenda - 6/7/2017 - P429

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P429

ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION

15.01 Termination, Abandonment, or Suspension at Will

The OWNER, in its sole discretion, shall have the right to terminate, abandon, or suspend all or part of the project and
contract at will. If the OWNER chooses to terminate, abandon, or suspend all or part of the project, it shall provide
CONTRACTOR 10 day’s written notice of its intent to do so.

Finance Committee - Agenda - 6/7/2017 - P428

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P428

inspection, marked-up record documents (as provided in paragraph 6.12), and other documents, CONTRACTOR
may make application for final payment following the procedure for progress payments.