Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P507

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P507

07900-2
JOINT SEALERS

1.8 WARRANTY

A.

Installer to provide five-year warranty to include coverage of installed sealants,
caulking and accessories which fail to achieve air tight and watertight seal, exhibit
loss of adhesion or cohesion, or do not cure.

PART 2 - PRODUCTS

2.1 MATERIALS

A.

D.

Finance Committee - Agenda - 6/7/2017 - P506

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P506

07900-1

SECTION 07900

JOINT SEALERS

PART 1 - GENERAL

1.1

1.2

1.3

1.4

1.5

1.6

1.7

SECTION INCLUDES
A. Preparing sealant substrate surfaces.
B. Sealant and backing.

RELATED SECTIONS

A. Section 01340 - Submittals

B. Section 01710 - Project Cleaning
C. Section 04200 - Unit Masonry
D. Section 07270 - Fire Stopping

REFERENCES

A. ASTM C920 - Specification for Elastomeric Joint Sealant

B. FS-TT-S-227 - Sealing Compound: Elastomeric Type, Multi-Component

Finance Committee - Agenda - 6/7/2017 - P505

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P505

0753 1-3
SINGLE-PLY EPDM ROOFING

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P504

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P504

0753 1-2
SINGLE-PLY EPDM ROOFING

1.7 ENVIRONMENTAL REQUIREMENTS
A. Proceed with roofing work when existing and forecasted weather conditions permit
work to be performed in accordance with manufacturer's recommendations and
warranty requirements.

Finance Committee - Agenda - 6/7/2017 - P503

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P503

07531-1

SECTION 07531

SINGLE-PLY EPDM ROOFING

PART 1 - GENERAL

1.1

1.2

1.3

1.4

1.5

1.6

SECTION INCLUDES
A. New Work on Existing Roofs.
Removal of existing roof system where required to install new items.

Single-ply EPDM fully adhered roofing system and flashing.
Metal Flashing
Concrete Walkway Pads.

AWN >

Re-issuance of the existing warranty after the work is complete

Finance Committee - Agenda - 6/7/2017 - P502

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P502

07270-3
FIRESTOPPING

C. Fill all annular spaces of penetrations in masonry and concrete with insulation
packing material and apply mortar on other approved sealing compound.

D. Install intumescent wrap around all plastic pipe and insulated pipe penetrating fire
rating assemblies.

E. Install sealant as required per manufacturer's instructions.

3.4 CLEANING
A. Clean work under provisions of Section 01710.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P501

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P501

07270-2
FIRESTOPPING

PART 2 - PRODUCTS

2.1 MANUFACTURERS

™MOOW >

Gold Bond Building Products
United States Gypsum

3M Products

Hilti

Johns Manville

Or equal

2.2 MATERIALS

A.

The materials specified herein are the generic components of typical firestopping
systems. The components shall be as required by the manufacturer to provide a
complete firestopping system complying with the performance requirements
specified.

Finance Committee - Agenda - 6/7/2017 - P500

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P500

07270-1

SECTION 07270

FIRESTOPPING

PART 1 - GENERAL

1.1

1.2

1.3

1.4

1.5

1.6

1.7

SECTION INCLUDES
A. Firestopping for all new and existing penetrations in concrete and masonry walls,
floors and ceilings.

RELATED SECTIONS

A. Section 01050: Coordination

B. Section 01340: Submittals

C. Section 04200: Unit Masonry

D. Section 07900: Joint Sealers

E. Division 15: Mechanical

F. Division 16: Electrical

REFERENCES

Finance Committee - Agenda - 6/7/2017 - P499

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P499

06100-2
ROUGH CARPRENTRY

B. Hardware and fasteners in contact with pressure treated lumber shall be stainless
steel.

PART 3 - EXECUTION

3.1] TEMPORARAY BRACING
A. Provide and maintain, until such time as permanently built into the structure, all
temporary bracing for new openings, walls, door frames, sills, and other work

requiring bracing and which is not specified as being provided under other
SECTIONS of the specifications.

3.2 PROTECTION

Finance Committee - Agenda - 6/7/2017 - P498

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P498

06100-1

SECTION 06100

ROUGH CARPRENTRY

PART | - GENERAL

L.] SECTION INCLUDES
A. Temporary enclosures.
B. All rough lumber, including wood nailers, posts, plates, blocking, strapping, and
lumber bases for mechanical and electrical equipment
C. Rough hardware, such as nails, bolts, screws, clips, as required to install rough
carpentry work.
D. Lumber Preservatives

1.2 | REALTED SECTIONS
A. Section 01340 - Submittals
B. Section 04200 - Unit Masonry
C. Section 07531 — Single Ply EPDM Roofing

Pagination

  • Previous page ‹‹
  • Page 1246
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact