SECTION 07531
SINGLE-PLY EPDM ROOFING
PART 1 - GENERAL
1.1
1.2
1.3
1.4
1.5
1.6
SECTION INCLUDES
A. New Work on Existing Roofs.
Removal of existing roof system where required to install new items.
Single-ply EPDM fully adhered roofing system and flashing.
Metal Flashing
Concrete Walkway Pads.
AWN >
Re-issuance of the existing warranty after the work is complete
RELATED SECTIONS
A. Section 06100 - Rough Carpentry
B. Division 15 - Mechanical: General
PERFORMANCE REQUIREMENTS
A. The completed installation shall be inspected and approved by a representative from
the roofing manufacturer. All deficiencies noted in this inspection shall be corrected
at no additional cost to the Owner.
SUBMITTALS
A. Submit information requested under provisions of Section 01340.
B. Submit a letter from the manufacturer Johns Manville verifying that the
manufacturer approves the roofing subcontractor to do the work.
C. After completion of the work, submit documentation from Johns Manville stating the
existing warranty (15 year NDL Peak Advantage Warranty BNE107300188) issued
in 2015) is still valid and shall now also include the work performed under this
contract.
QUALIFICATIONS
A. Work on existing roofs shall be done by a Contractor who 1s certified by the
manufacturer of the existing roof system, Johns Manville.
DELIVERY, STORAGE, AND HANDLING
A. Manufactured roofing materials shall be delivered in manufacturer's original
unopened containers or wrapping with labels intact and legible.
B. Store and protect materials from damage and weather in accordance with the
manufacturer's instructions. Keep materials clean and dry. Store material on raised
platforms and cover top, sides and bottom
C. Adhere to the special precautions of the manufacturer or as required by the general
conditions, whichever is most stringent.