Document Date
Meeting Description
Document Type
Meeting Date
Page Number
499
06100-2
ROUGH CARPRENTRY
B. Hardware and fasteners in contact with pressure treated lumber shall be stainless
steel.
PART 3 - EXECUTION
3.1] TEMPORARAY BRACING
A. Provide and maintain, until such time as permanently built into the structure, all
temporary bracing for new openings, walls, door frames, sills, and other work
requiring bracing and which is not specified as being provided under other
SECTIONS of the specifications.
3.2 PROTECTION
A. Do such work as is necessary to cover and protect all finishes and other work from
damage during construction.
END OF SECTION
13089K
Page Image