Section Number
01
02
01014
01110
01140
01150
01330
01331
01550
01570
01735
02085
02111
02252
02300
02324
02441
02451
02518
02530
02533
02534
02619
02631
02650
02650A
02745
02745A
02769
02800
02930
TABLE OF CONTENTS
Description
GENERAL REQUIREMENTS
Scope and Sequence of Work
Control of Work and Materials
Special Provisions
Measurement and Payment
Submittals
Documentation
Traffic Control and Signage
Environmental Protection
Cutting, Coring and Patching
SITE WORK
Polyvinyl Chloride Gravity Pipe and Fittings
Removal of Undocumented Asbestos from
Underground Utilities
Support of Excavation
Earthwork
Rock Excavation and Disposal
Cleaning, Television Inspection, and Testing of New
Pipelines
Flaggers and Uniformed Officer for Traffic Control
Tracer Tape
Buildings Connections and Drop Connections
Connections to Existing Structures
Or Sewer Mains
Fill Cement Sewer Pipe (To Be Abandoned)
Replacement of Existing Drains
Precast Manholes and Catch Basins
CIPP Lining
Cured in Place Point Repair
Paving and Reclaimation
Loop Detectors, and Pavement Markings
Pneumatic Assisted and Segmental Static HDPE
Sliplining
Manhole Rehabilitation
Detectable Waming at Handicap Ramp
Page Numbers
01014-1
01110-1 to 01110-6
01140-1 to 011404
01150-1 to 01150-24
01330-1 to 01330-2
01331-1 to 01331-2
01550-1
01570-1 to 01570-6
01735-1 to 01735-3
02085-1 to 02085-4
02111-1 to 0211147
02252-1 to 02252-2
02300-1 to 02300-10
02324-1 to 023244
0244 1-1 to 024414
0245 1-1 to 0245 1-2
02518-1 to 02418-2
02530-1 to 02530-2
02533-1 to 02533-2
02534-1
02619-1 to 02619-2
0263 1-1 to 02631-8
02650-1 to 02650-10
02650A-1 to 02650A-4
02745-1 to 02745-8
02745A-1 to 02745A-2
02769-1 to 02769-18
02800-1 to 02800-9
02930-1